4.3.6<br />
4.3.7<br />
4.3.8<br />
PE-pressure pipe diameter 100 mm, handvalve,<br />
e.g. Plasson; delivery and laying<br />
3 St. 250 750<br />
Distribution pipe, PE, 65 mm diameter,<br />
incuding. Connection elements, with ...<br />
(number) Drill holes at 10 mm diameter in<br />
2,0 m distances, oriented downwards onto<br />
concrete slabs ( Pos.Nr. 4.3.20 ) delivery<br />
and laying<br />
PE-pressure pipe diameter 65 mm,<br />
136 m 880 119,680<br />
Endcaps 8 pc 320 2,560<br />
PE-pressure pipe, diameter 100 mm,<br />
4.3.9 elbow 45°; delivery and laying 2 pc 410 820<br />
PE (PVC)-infiltration pipes als drainage<br />
pipe diameter 100 mm, in filter bed I, e.g.<br />
4.3.10 Strabusil VS, delivery and laying 84 m 1230 103,320<br />
PE (PVC)-infiltration and drainage pipe<br />
diameter 150 mm, in filter bed II, e.g.<br />
4.3.11 Strabusil VS, delivery and laying 18 m 1230 22,140<br />
PVC elbows, 150 mm for infiltration pipe<br />
4.3.12 bed II 0 pc 360 0<br />
PVC reduction 150/100 mm for infiltration<br />
4.3.13 pipe bed II 4 pc 1236 4,944<br />
4.3.14 PVC "T" 150 mm for in- and outlet bed II 2 pc 460 920<br />
4.3.15 PVC elbows, 100 mm 20 pc 380 7,600<br />
4.3.16 PVC "T", 100 mm 6 pc 900 5,400<br />
Aeration units; PE, diameter 100 mm, 1 m<br />
high; e.g.. Strabusil unperforated, incl. vent<br />
hats and adjustment piece, or similar<br />
4.3.17<br />
17 pc 2200 37,400<br />
PVC hard waste water pipe, 150 mm<br />
between both filter beds I and filter bed II,<br />
including watertight fitting into two<br />
manholes and 3 watertight transitions<br />
4.3.18 through the liner, delivery and laying 30 m 1650 49,500<br />
Outflow pipe from filter bed II; KG-Pipe<br />
4.3.19 PVC hard, 150 mm 7 m 1450 10,150<br />
Concrete slabs, 30 x 30 cm delivery and<br />
laying, with fixing elements for the<br />
4.3.20 distribution pipes 136 pc 75 10,200<br />
PE-pipe, 100 mm, installation of a<br />
watertight connection to the sludge drying<br />
4.3.21 bed 1 pc 2500 2,500<br />
PE pipe from SDB to Pump Chamber;<br />
installation of a backflow barrier 100 mm<br />
4.3.22 diameter 1 pc 200 200<br />
Title sum 518,812<br />
4.4 Title: Tanks and manholes