• Install concrete abutment(s) in central areas to create pair(s) of rows of parking (as space permits). 3.2 Ongoing Maintenance Requirements None. 3.3 Initial Enhancement Costs Concrete curbs $4740. for 65, 1.4 m abutments (90 m length) @ $74 ea incl. taxes 3.4 Monitoring Schedule None required. Blackie Spit Park: Wildlife Habitat Enhancement Plan – Management Unit 18 77
Blackie Spit Park: Wildlife Habitat Enhancement Plan – Management Unit 18 78
- Page 37 and 38: 3.2 Ongoing Maintenance Requirement
- Page 39 and 40: Management Unit 2: Rail Side 1.0 Ex
- Page 41 and 42: 3.2 Ongoing Maintenance Requirement
- Page 43 and 44: Management Unit 3: Community Garden
- Page 45 and 46: 2.0 Goals and Objectives Species Ma
- Page 47 and 48: Blackie Spit Park: Wildlife Habitat
- Page 49 and 50: 3.3 Initial Enhancement Costs Cutti
- Page 51 and 52: • Plant wildflower mix: • mow g
- Page 53 and 54: Blackie Spit Park: Wildlife Habitat
- Page 55 and 56: 3.2 Ongoing Maintenance Requirement
- Page 57 and 58: 2.0 Goals and Objectives Species Ma
- Page 59 and 60: Blackie Spit Park: Wildlife Habitat
- Page 61 and 62: 3.3 Initial Enhancement Costs Broom
- Page 63 and 64: Management Unit 10: Dune, Grassland
- Page 65 and 66: 3.2 Ongoing Maintenance Requirement
- Page 67 and 68: Management Unit 11: Dog-off-leash A
- Page 69 and 70: 3.3 Initial Enhancement Costs • I
- Page 71 and 72: Management Unit 12: East Pod 1.0 Ex
- Page 73 and 74: Blackie Spit Park: Wildlife Habitat
- Page 75 and 76: 3.0 Management Prescriptions 3.1 In
- Page 77 and 78: Blackie Spit Park: Wildlife Habitat
- Page 79 and 80: 3.0 Management Prescriptions 3.1 In
- Page 81 and 82: Management Unit 15: Intertidal Bay
- Page 83 and 84: Blackie Spit Park: Wildlife Habitat
- Page 85 and 86: • Along the outer edge, facing th
- Page 87: Management Unit 18: Parking Lot 1.0
- Page 91 and 92: 3.3 Initial Enhancement Costs Plant
- Page 93 and 94: Figure 8: Cannery Point, MU 1, show
- Page 95 and 96: Figure 13: East end of hedgerow in
- Page 97 and 98: Figure 17: Main drainage ditch sout
- Page 99 and 100: Figure 21: The deciduous woodlot (M
- Page 101 and 102: Figure 29: Most of the shrub growth
- Page 103 and 104: Figure 34: Looking northwest throug
- Page 105 and 106: Figure 39: Dunegrass grows above th
- Page 107 and 108: Figure 44: Currently used for parki
- Page 109: Figure 48: Native shrubs are propos
• Install concrete abutment(s) in central areas to create pair(s) <strong>of</strong> rows <strong>of</strong> parking (as space<br />
permits).<br />
3.2 Ongoing Maintenance Requirements<br />
None.<br />
3.3 Initial <strong>Enhancement</strong> Costs<br />
Concrete curbs<br />
$4740. for 65, 1.4 m abutments (90 m length) @ $74 ea incl. taxes<br />
3.4 Monitoring Schedule<br />
None required.<br />