3.3 Initial <strong>Enhancement</strong> Costs<br />
Removal <strong>of</strong> about 3000 m 3 <strong>of</strong> existing substrates<br />
excavation, grading and loading $3,000. @ $1/m 3<br />
trucking (assuming an <strong>of</strong>f-site location) $19,000. assuming: 9.5 m 3 /load, 1 hr turn<br />
around, $60/hr.<br />
dumping fee if required<br />
$6,400. @ $20/load<br />
Total $28,400.<br />
Placing <strong>of</strong> larger rocks<br />
It may be possible to use rocks turned up<br />
during clearing <strong>of</strong> the site, or some <strong>of</strong> the<br />
rocks currently bordering MU 16 to 18.<br />
3.4 Monitoring Schedule<br />
Every 5 years evaluate the need to control vegetation at the highest elevations, as per Section 3.2.<br />