Blackie Spit Park: Wildlife Habitat Enhancement Plan - City of Surrey
Blackie Spit Park: Wildlife Habitat Enhancement Plan - City of Surrey Blackie Spit Park: Wildlife Habitat Enhancement Plan - City of Surrey
3.4 Monitoring Schedule • Monitor the success of wildflower growth. Most wildflowers are annuals (lupin and most lilies are perennial) that grow best on disturbed sites, so periodic disturbance, such as scarifying, every 2 to 4 years, may be required. Also add new seed, as required. • If the wildflowers do poorly because grasses are too aggressive, try shallow rototilling and planting low-growing grasses, such as Chewing’s fescue and creeping red fescue. • Monitor aquatic plant growth annually until established, then every 5 years. If extent of growth becomes a problem, impeding water flow in the south ditch, or obscuring open water in the north ditch, remove some areas of plants, as required. Blackie Spit Park: Wildlife Habitat Enhancement Plan – Management Unit 6 41
Blackie Spit Park: Wildlife Habitat Enhancement Plan – Management Unit 6 42
- Page 1 and 2: Blackie Spit Park: Wildlife Habitat
- Page 3 and 4: Table of Contents Executive Summary
- Page 5 and 6: 3.1 Initial Enhancement Requirement
- Page 7 and 8: 2.0 Goals and Objectives ..........
- Page 9 and 10: List of Figures Part 1 Figure 1: Lo
- Page 11 and 12: List of Drawings in Part 2 Drawing
- Page 13 and 14: passerines, and to a much lesser ex
- Page 15 and 16: 2.3 Local Blackie Spit, situated in
- Page 17 and 18: species include Scotch broom (Cytis
- Page 19 and 20: Figure 3: Blackie Spit Trails: Exis
- Page 21 and 22: MANAGEMENT UNIT 3. Community Garden
- Page 23 and 24: MANAGEMENT UNIT 11. Dog-offleash WI
- Page 25 and 26: 3.3.2 Management Unit Cost Summary
- Page 27 and 28: 3.3.3 Management Priorities First p
- Page 29 and 30: 3.3.4.2 Systematic Surveys All syst
- Page 31 and 32: The method entails searching along
- Page 33 and 34: Management Unit MU 8 MU 9 MU 10 Mon
- Page 35 and 36: PART 2: DETAILED MANAGEMENT UNIT MA
- Page 37 and 38: 3.2 Ongoing Maintenance Requirement
- Page 39 and 40: Management Unit 2: Rail Side 1.0 Ex
- Page 41 and 42: 3.2 Ongoing Maintenance Requirement
- Page 43 and 44: Management Unit 3: Community Garden
- Page 45 and 46: 2.0 Goals and Objectives Species Ma
- Page 47 and 48: Blackie Spit Park: Wildlife Habitat
- Page 49 and 50: 3.3 Initial Enhancement Costs Cutti
- Page 51: • Plant wildflower mix: • mow g
- Page 55 and 56: 3.2 Ongoing Maintenance Requirement
- Page 57 and 58: 2.0 Goals and Objectives Species Ma
- Page 59 and 60: Blackie Spit Park: Wildlife Habitat
- Page 61 and 62: 3.3 Initial Enhancement Costs Broom
- Page 63 and 64: Management Unit 10: Dune, Grassland
- Page 65 and 66: 3.2 Ongoing Maintenance Requirement
- Page 67 and 68: Management Unit 11: Dog-off-leash A
- Page 69 and 70: 3.3 Initial Enhancement Costs • I
- Page 71 and 72: Management Unit 12: East Pod 1.0 Ex
- Page 73 and 74: Blackie Spit Park: Wildlife Habitat
- Page 75 and 76: 3.0 Management Prescriptions 3.1 In
- Page 77 and 78: Blackie Spit Park: Wildlife Habitat
- Page 79 and 80: 3.0 Management Prescriptions 3.1 In
- Page 81 and 82: Management Unit 15: Intertidal Bay
- Page 83 and 84: Blackie Spit Park: Wildlife Habitat
- Page 85 and 86: • Along the outer edge, facing th
- Page 87 and 88: Management Unit 18: Parking Lot 1.0
- Page 89 and 90: Blackie Spit Park: Wildlife Habitat
- Page 91 and 92: 3.3 Initial Enhancement Costs Plant
- Page 93 and 94: Figure 8: Cannery Point, MU 1, show
- Page 95 and 96: Figure 13: East end of hedgerow in
- Page 97 and 98: Figure 17: Main drainage ditch sout
- Page 99 and 100: Figure 21: The deciduous woodlot (M
- Page 101 and 102: Figure 29: Most of the shrub growth
<strong>Blackie</strong> <strong>Spit</strong> <strong>Park</strong>: <strong>Wildlife</strong> <strong>Habitat</strong> <strong>Enhancement</strong> <strong>Plan</strong> – Management Unit 6 42