3.3.2 Management Unit Cost Summary<br />

The following costs are summarized from the individual management unit plans in Part 2. See the plans for more details.<br />

Summary <strong>of</strong> Initial Activities MU1 MU2 MU3 MU4 MU5 MU6 MU7 MU8 MU9 MU10 MU11 MU12 MU13 MU14 MU15 MU16 MU17 MU18 MU19 TOTAL<br />

Remove invasive plant species. incl. incl. volntrs incl. staff/vol. vol/staff incl. volntrs 0<br />

<strong>Plan</strong>t trees &/or shrubs (may include preparations) 3,900 3,523 9,296 1,050 3,825 6,159 16,980 75 1,204 46,012<br />

Renovate all or some <strong>of</strong> the fields 2,500 4,700 7,200<br />

<strong>Plan</strong>t wildflower mix (may include preparations) 1,250 1,250<br />

<strong>Plan</strong>t aquatic plants 3,270 3,270<br />

<strong>Plan</strong>t dune vegetation species (may include preparations) 235 685 920<br />

Trail management: close or create trails as required staff staff staff staff 1,000 staff/vol 1,000<br />

Investigate the suitability <strong>of</strong> the pilings to support nesting<br />

structures for purple martins or cliff swallows.<br />

0<br />

0<br />

Install nest boxes 200 100 300<br />

Construct viewing platform 5,000 5,000 10,000<br />

Conduct wildlife and/or user survey staff? 2,500 2,500<br />

Introduce logs (Large Woody Debris) staff 0 0<br />

• Discuss wildlife goals and habitat management<br />

objectives with tenants.<br />

• Take required steps, if required, to install facilities or<br />

enact procedures to meet second objective.<br />

0<br />

0<br />

Construct fencing for access control 250 250<br />

• Install signs<br />

• Move park benches<br />

200 200<br />

Create intertidal beach 28,400 *2,370 30,770<br />

Work with Naturescape BC to create native plant wildlife<br />

garden<br />

5,000 5,000<br />

Construct parking areas 4,740 4,740<br />

TOTAL 200 3,900 0 2,500 4,700 8,143 5,000 11,796 1,050 4,060 6,159 250 17,980 5,275 28,400 3,055 5,000 4,740 1,204 113,412<br />

* If MU 16 were done in conjunction with MU 15, overall trucking costs would be reduced by $5,500.<br />

<strong>Blackie</strong> <strong>Spit</strong> <strong>Park</strong>: <strong>Wildlife</strong> <strong>Habitat</strong> <strong>Enhancement</strong> <strong>Plan</strong> – PART 1: Background and Summary 14