04.09.2014 Views

Nepal Doorsanchar Company Limited Tender No ... - Nepal Telecom

Nepal Doorsanchar Company Limited Tender No ... - Nepal Telecom

Nepal Doorsanchar Company Limited Tender No ... - Nepal Telecom

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

<strong>Nepal</strong> <strong>Telecom</strong><br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68<br />

for<br />

Supply and Delivery<br />

of<br />

Underground Duct Cables<br />

July, 2010<br />

Material Management Department Tel. <strong>No</strong>. : 977 1 4227878<br />

Central office, <strong>Doorsanchar</strong> Bhawan Fax <strong>No</strong>. : 977 1 4227260<br />

Bhadrakali Plaza P.O. Box <strong>No</strong>. - 5406<br />

Kathmandu<br />

E-mail : ntc.mmd@ntc.net.np<br />

<strong>Nepal</strong>.<br />

Website : http://www.ntc.net.np<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 1 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Table of Content<br />

SN Section Description Page <strong>No</strong>.<br />

Commercial Specifications<br />

1 I Important <strong>No</strong>tice to Bidders (INB) 3<br />

2 II Invitation for Bids (IFB) 5<br />

3 III Instructions to Bidders (ITB) 6<br />

4 IV Conditions of Contract (COC) 18<br />

5 V Sample Forms<br />

Bid Form (Sample Form <strong>No</strong>. - 1) 29<br />

Bid Security Form (Sample Form <strong>No</strong>. - 2) 30<br />

Manufacturer's Authorization Letter (Sample Form <strong>No</strong>.-3) 31<br />

Performance Security Form (Sample Form <strong>No</strong>. - 4) 32<br />

Bank Guarantee for Advance Payment (Sample Form <strong>No</strong>. - 5) 33<br />

6 VI Schedule of Requirements for Underground Duct Cables 34<br />

7 VII Adjustment of unit price of copper cables for variation in price of copper 35<br />

8 VIII Price Schedule and Quantity Thereof for Underground Duct Cables 37<br />

Technical Specifications<br />

9 IX General Conditions for Technical Specifications 38<br />

10 X Technical Specification for Foam Skin type Polyethylene<br />

Insulated Polyethylene Sheathed Underground Duct Cables 42<br />

Tables<br />

11 Table – 1: Diameter, Resistance and Elongation of the Conductors 51<br />

12 Table – 2: Colour Code for Conductor Insulation 52<br />

13 Table – 3: Colour Scheme of the Tape or Binder for Identification 53<br />

14 Table – 4 54<br />

15 Table – 5: Drum Colour Code for <strong>Nepal</strong> <strong>Telecom</strong>'s respective stores 55<br />

21 Annex – I Type Test on Polyethylene Insulation and on Completed Cables 56<br />

22 Annex – II Tests for laminate and composite sheath. 58<br />

20 Annex – III Drawing <strong>No</strong>. DR – 1/NT/EP/300 59<br />

16 Annex – IV List of Banks 60<br />

17 Annex – V List of Bid Opening Documents 61<br />

18 Annex – VI Supply Records Format 62<br />

19 Annex – VII Satisfactory Performance Certificate 63<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 2 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section I: Important <strong>No</strong>tice to Bidders (INB)<br />

The Bid prepared by the Bidder, and all correspondence and documents relating to the Bid exchange by the<br />

Bidder and Purchaser, shall be written in English Language.<br />

Part A<br />

Bidders are requested to study the tender document carefully. Absence of any of the following document will<br />

result in the rejection of the Bid.<br />

(a)<br />

A clause by clause comments on Conditions of Contract and Technical Specifications.<br />

(b) All the pages containing Conditions of Contract and Technical Compliance Statement shall be signed and<br />

stamped with official seal by the bidder (Authorized Person).<br />

(c)<br />

Detailed technical description and the performance characteristics of all the offered goods shall be included<br />

along with the bid document.<br />

(d) Bidders Eligibility, Field proven-ness and Supply records of the offered goods as specified in Clause <strong>No</strong>. –<br />

16 of Section III: Instructions to Bidders (ITB).<br />

(e)<br />

(f)<br />

All documents supporting as evidence for the clauses of eligibility of products shall be Authentic Documents<br />

(true copy of certificates with the letter head of the issuing authority duly signed with date by the authorized<br />

person, stamped with official seal and with name, designation of the signatory in the letter) regarding<br />

Bidder’s/Manufacturer’s experience and field proven-ness of offered goods as mentioned in the Clause <strong>No</strong>. –<br />

16 of Section III: Instructions to Bidders (ITB) and attested by <strong>No</strong>tary Public. Attestation shall be in English<br />

Language<br />

Quality Assurance Certificate ISO 9000 Series Certificates relating to the manufacturing of the offered goods.<br />

The LME rate will be fixed as on the thirtieth (30th) day from the date of signing of contract for single lot as<br />

per clause <strong>No</strong> – 7.2.4 of section IV: Conditions of Contract (COC).<br />

Part B<br />

The Original Copies of the following documents shall be submitted by the bidders for bid opening purpose,<br />

without which the bid shall be rejected.<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

(g)<br />

Bid Form duly signed with date by the authorized person and stamped with official seal as per Sample Form<br />

<strong>No</strong>. - 1 “Bid Form” of Section V enclosed in the bid document.<br />

Bid Security furnished in accordance with Clause <strong>No</strong>. – 7 of Section III: Instructions to Bidders (ITB) and as<br />

per Sample Form <strong>No</strong>. - 2 “Bid Security Form” of Section V enclosed in the bid document.<br />

Price Schedule duly signed with date by the Authorized Person and stamped with official seal in accordance<br />

with Section VII: Price Schedule and Quantity Thereof for Underground Duct Cables.<br />

Manufacturer's Authorization Letter as specified in Clause <strong>No</strong>. – 16 of Section III: Instructions to Bidders<br />

(ITB) and certificates on proof of being the manufacturer of the offered goods in the form of Registrations<br />

certificates attested by <strong>No</strong>tary Public.<br />

Consortium agreement signed by all consortium members. (if Applicable)<br />

Back to Back agreement with O&M manufacturer of Offered Goods. (if Applicable)<br />

The Power of Attorney and signature specimen of the Authorized Person in a separate sheet shall be<br />

submitted along with the Bid.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 3 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Part C<br />

In order to simplify the process of Bid opening and also to economize the time consumed during the Bid<br />

opening, the Bidders are required to submit the above documents mentioned in Part -B in a separate sealed<br />

envelope marked as "DOCUMENT FOR BID OPENING". Otherwise, the Bidder shall be fully responsible<br />

for the probable consequences that may result therein after.<br />

Important Conditions of Contract (COC)<br />

Part D<br />

(a) The Bidder shall fully comply with the clauses related to Delivery (Clause <strong>No</strong>. 5) and Warranty (Clause <strong>No</strong>. 6)<br />

of Section IV: Conditions of Contract (COC).<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

The bid shall be rejected if the bidder fails to comply with Payment Terms as per clause <strong>No</strong>. 7 of Section IV:<br />

COC.<br />

The bid shall be rejected if the bidder fails to comply with Performance Security as per Clause <strong>No</strong>. - 4 of Section<br />

IV: COC.<br />

The bid shall be rejected if the bidder fails to comply with Taxes and Duties as per Clause <strong>No</strong>. - 11 of Section IV:<br />

Conditions of Contract.<br />

Bid with any deviation in the major clauses marked with asterisk (*), shall be rejected.<br />

Technical Compliance Statement<br />

Part E<br />

In order to assist the evaluation process, the bidders shall mention the relevant Clause <strong>No</strong>., Page <strong>No</strong>.,<br />

Chapter/Section/Volume of the offered bid document and/or the brochure and catalogue, wherever applicable, for<br />

the purpose of verification of their technical compliance statement.<br />

The bidders are also requested to furnish signed and sealed list of all the documents as per Annex V: List of Bid<br />

Opening Documents and documents to prove the Bidder's / Manufacturer's eligibility as per clause no. 16.2 of<br />

Section III: Instruction to Bidders (ITB) along with the bid opening document.<br />

End of Section I: Important <strong>No</strong>tice to Bidders (INB)<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 4 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section II : Invitation for Bids (IFB)<br />

Date: July 22, 2010<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68<br />

1. <strong>Nepal</strong> <strong>Telecom</strong> (<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong>) has been providing various telecom services to its<br />

customers using different networks- PSTN, GSM/3G, CDMA/IPCDMA, Internet and broadband networks.<br />

<strong>Nepal</strong> <strong>Telecom</strong> (<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong>) invites sealed bids for the <strong>Tender</strong> <strong>No</strong>. NDCL/01/067-<br />

68 for Supply and Delivery of Underground Duct Cables. The Bidders, who meets the eligibility criteria<br />

mentioned in the Clause <strong>No</strong> 16 of Section III: Instruction to Bidders can participate in this <strong>Tender</strong>. The<br />

evaluation shall be performed in three stages i.e. Preliminary Examination, Detail examination and Financial<br />

Evaluation. Responsiveness of the bids shall be determined after the Preliminary and Detail Evaluation of the<br />

Bids. Financial Evaluation determines ranking of the bids based on the evaluated price.<br />

2. Interested bidders may obtain further information from the office of:<br />

<strong>Nepal</strong> <strong>Telecom</strong> (<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong>),<br />

Material Management Department,<br />

Central Office, <strong>Doorsanchar</strong> Bhawan,<br />

Bhadrakali Plaza, Kathmandu, <strong>Nepal</strong>.<br />

Tel. <strong>No</strong>. : 977 1 4210309<br />

Fax <strong>No</strong>. : 977 1 4227260<br />

E-mail : ntc.mmd@ntc.net.np<br />

Website : http://www.ntc.net.np<br />

3. A complete set of bidding documents may be purchased by any interested bidder on the submission of a<br />

written application to the above and upon payment of a non-refundable fee of NRs. 15,000.00 (<strong>Nepal</strong>ese<br />

Rupees: Fifteen Thousand only) or US$210.00 (US Dollars: Two Hundred and Ten only) or Euro 160.00<br />

(Euro: One Hundred and Sixty only).<br />

If interested bidder wishes to collect the document by courier service, additional US$ 70.00 (US Dollars:<br />

Seventy only) or Euro 60.00 (Euro Sixty only) or NRs. 6,000.00 (<strong>Nepal</strong>ese Rupees: Six thousand only) will be<br />

charged to the bidder.<br />

4. Bids must be accompanied by a Bid Security of US$ 31,000.00 (In words: United States Dollars: Thirty One<br />

Thousand only) or Euro 24,000.00 (In words: Euro: Twenty Four Thousand only) or NRs 2,300,000.00 (In words:<br />

<strong>Nepal</strong>ese Rupees: Two Million and Three Hundred Thousand only).<br />

5. The Bid Security must be furnished or counter guaranteed by one of the banks listed in Annex IV: List of the<br />

Approved Banks by <strong>Nepal</strong> <strong>Telecom</strong>.<br />

The Bidder may submit the Bid Security issued or counter guaranteed by the bank not listed in Annex IV<br />

with the <strong>Nepal</strong> <strong>Telecom</strong>'s prior written consent. In such a case, Bidder shall make a request to accept the bank<br />

other than listed above, fifteen (15) days prior to the deadline for the submission of bids. However, <strong>Nepal</strong><br />

<strong>Telecom</strong> reserves the right to accept or reject the bidder's request without thereby incurring any liability to the<br />

affected bidder or any obligation to inform or explain the affected bidder of th grounds for <strong>Nepal</strong> <strong>Telecom</strong>'s<br />

action.<br />

6. If bidder wishes to submit the Bid Security in the form of cash, the cash should be deposited in Deposit<br />

Account of <strong>Nepal</strong> <strong>Telecom</strong> and submit the receipt of the deposited amount of cash along with the bid. Name<br />

of the bank and account number shall be provided as per the request of the potential bidder.<br />

7. Bid documents will be available in soft copy (in CD) as well as in hard copy. The offer shall also be provided<br />

in the hard copy (documentation form) as well as in the form of soft copy in CD (in Word, Excel and PDF<br />

Format). Soft copy will be used for the easiness of bid preparation and for the easiness of bid evaluation only.<br />

In case of discrepancy between the two, the hard copy shall prevail.<br />

End of Section II: Invitation for Bids (IFB)<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 5 of 63


1. Cost of Bidding<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section III: Instructions To Bidders (ITB)<br />

The Bidder shall bear all cost associated with the preparation and submission of its bid, and the <strong>Nepal</strong><br />

<strong>Telecom</strong> will in no case be responsible or liable for those costs, regardless of the conduct or outcome of the<br />

bidding process.<br />

2. Bidding Document<br />

2.1 The goods/ services required, bidding procedures and conditions of contract are prescribed in the bidding<br />

documents. In addition to the Invitation for Bids, the bidding document shall include:<br />

(a) Instruction to Bidders (ITB)<br />

(b) Conditions of Contract (COC)<br />

(c) Schedule of Requirements (SOR)<br />

(d) Technical Specifications<br />

(e) Bid Form and Price Schedule<br />

(f) Bid Security Form<br />

(g) Performance Security Form<br />

(h) Manufacturer’s Authorization Letter<br />

(i) Addendum/Calrifications issued in accordance with Clause <strong>No</strong>. 3, if any.<br />

The Bidder is required to examine all instructions, commercial terms and conditions, forms, technical<br />

specifications, schedule of requirements etc. as included in the bidding document. Failure to furnish all<br />

information as required by the bidding documents or submission of an incomplete and/ or partially quoted bid<br />

will remain at the bidder’s risk and may result in the rejection of its bid.<br />

The bidder shall be duly authorized by the producer or manufacturer of the goods to supply the goods in<br />

<strong>Nepal</strong>, in case the bidder did not manufacture or otherwise produce it.<br />

3. Clarification of Bidding Documents<br />

A prospective bidder requiring any clarification of the bidding documents may notify the <strong>Nepal</strong> <strong>Telecom</strong> in<br />

writing at the mailing address indicated in the invitation for bids. The <strong>Nepal</strong> <strong>Telecom</strong> will respond in writing<br />

to any request for clarification of the bidding documents received not later than fifteen (15) days prior to the<br />

deadline for the submission of bids. Written copies of the <strong>Nepal</strong> <strong>Telecom</strong>'s response (including an explanation<br />

of the query but without identifying the source of the inquiry) will be sent to all prospective bidders who have<br />

purchased the bidding document.<br />

4. Amendment of Bidding Document<br />

4.1 The <strong>Nepal</strong> <strong>Telecom</strong>, may, for any reason, whether at its own initiative or in response to a clarification<br />

requested by a prospective bidder, may issue clarification and corrections seven (7) days prior to the<br />

deadline for the submission of bids without affecting the condition and specifications.<br />

4.2 Such clarifications and corrections will be notified in writing to all prospective bidders who have<br />

purchased the bidding documents. Inclusion of such clarification and corrections will be binding on them.<br />

4.3 In order to provide bidders reasonable time in which to take the amendment into account in preparing<br />

their bids, the <strong>Nepal</strong> <strong>Telecom</strong> may at its discretion extend the deadline for submission of bids.<br />

5. Composition of Bid Document<br />

The bid documents shall comprise documents and forms duly filled with date and signed by Authorized<br />

Person as mentioned in the Section I: ‘Important <strong>No</strong>tice to Bidders’.<br />

5.1 Submission of the following documents and forms along with bid document are mandatory, without<br />

which, the bid shall be rejected.<br />

(a)<br />

(b)<br />

(c)<br />

Bid Form (Sample form <strong>No</strong>. - 1) in accordance with Section V: Sample Forms; duly filled with<br />

date and signed by Authorized Person.<br />

Bid Security furnished in accordance with Clause <strong>No</strong>. - 7 of Section III: Instructions to Bidders<br />

(ITB) and the Bid Security Form (Sample form <strong>No</strong>. - 2) duly filled with date and signed by<br />

Authorized Person.<br />

Price Schedule in accordance with Section VII and Clause <strong>No</strong>. – 6 of Section III: Instructions to<br />

Bidders (ITB) duly filled with date and signed by authorized person.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 6 of 63


(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

(i)<br />

(j)<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Manufacturer's Authorization Letter (as per Sample form <strong>No</strong>. - 3 of Section V) if the Bidder is<br />

not a manufacturer of the offered goods/ items and certificates on proof of being manufacturer of<br />

the offered products. (Please refer to Clause <strong>No</strong>. - d: Part-B of Section I: Important <strong>No</strong>tice to<br />

Bidders.)<br />

The Power of Attorney and Signature specimen of the Authorized Person in a separate sheet shall<br />

be submitted along with the Bid. (Please refer to Clause <strong>No</strong>. – g of Part-A and Part-B of Section I:<br />

Important <strong>No</strong>tice to Bidders.)<br />

A clause by clause comments on Conditions of Contract and Technical Specification. (Please refer<br />

to Clause <strong>No</strong>. - a.: Part-A and Part-E of Section I: Important <strong>No</strong>tice to Bidders.)<br />

Bidders Eligibility, Field Proven-ness and Supply records of the offered goods. (Please refer to<br />

Clause <strong>No</strong>. – 16 of Section III: Instructions to Bidders.<br />

All documents supporting as evidence for the clauses of eligibility of products shall be Authentic<br />

Documents (true copy of certificates with the letter head of the issuing authority duly signed with<br />

date by the authorized person, stamped with official seal and with name, designation of the<br />

signatory in the letter) regarding Bidder’s/Manufacturer’s experience and field proven-ness of<br />

offered goods as mentioned in the Clause <strong>No</strong>. – 16 of Section III: Instructions to Bidders (ITB). All<br />

the submitted certificates shall be attested by <strong>No</strong>tary Public and attestation shall be in English<br />

Language.<br />

All pages containing Conditions of Contract and Technical Compliance Statement shall be signed<br />

by the Bidder (Authorized Person) and stamped with official seal.<br />

Consortium agreement among the bidder and key manufacturers of underground duct cables (if<br />

Applicable).<br />

Teaming with back to back agreement document between the bidder and each of the technology<br />

partners, manufacturer participating in the bid (if Applicable).<br />

5.2 The Bidder shall submit the above documents from (a) to (e) in 3 rd envelope sealed and marked as<br />

“Document for bid Opening” and remaining documents shall be enclosed in 1 st envelope “Original” and<br />

2 nd envelope “Copy” as mentioned in Clause <strong>No</strong> – 9: of Section III : Instructions to Bidders.<br />

5.3 Compliance Statements to Commercial and Technical Requirement<br />

5.3.1 In the offer, the bidder shall include clause by clause statement and sufficient documentation such<br />

that the <strong>Nepal</strong> <strong>Telecom</strong> can validate the compliance statements. In the statement of compliance,<br />

the bidder shall state:-<br />

a. “Fully Compliant" if systems and functions offered fully meets the tender requirement.<br />

b. “Partially Compliant” if the systems and functions offered meets the requirement partially.<br />

The bidder shall state the reason why the offer is partially compliant. However, if the bidder is<br />

able to fulfill the specified requirement later, the time schedule for this shall be stated. In such<br />

cases, the bidder shall clearly mention the extent to which other requirements or specifications<br />

are affected.<br />

c. “<strong>No</strong>n Compliant” if the systems and functions cannot meet the requirements. The bidder shall<br />

also state reasons for it.<br />

d. Compliance statements such as ‘Agreed’, ‘<strong>No</strong>ted’, ‘OK’, Tick mark, Do (”) and<br />

‘Understood’ etc. shall not be acceptable and shall be considered “<strong>No</strong>n Compliant”<br />

Bidders shall mention, along with the compliance statement, the relevant Clause <strong>No</strong>., Page <strong>No</strong>.,<br />

Chapter/Section/Volume of the offered bid document and/or the brochure and catalogue, wherever<br />

applicable, for the purpose of verification of their commercial and technical compliance statement.<br />

5.3.2 In case of absence or unclear statements of compliance for any specified requirement, the <strong>Nepal</strong><br />

<strong>Telecom</strong> will interpret that particular requirement as being "<strong>No</strong>n Compliant ".<br />

5.3.3 If the bidder has stated ‘fully compliant’ against technical clauses with comments resulting in<br />

material deviation, such statement shall be considered as "<strong>No</strong>n Compliant ".<br />

5.3.4 If the bidder has stated partially or non compliant to some of the clauses, the successful bidder<br />

shall provision for all such requirements with alternative solutions and customizations and make<br />

the bid fully compliant to all NT requirements at the time of negotiation.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 7 of 63


6. Bid Price and Bid Currency<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

The bidder shall quote the unit prices and total bid prices of the goods it proposes to supply under the contract<br />

on the appropriate price schedule attached to this document.<br />

6.1 The prices shall be quoted in US Dollars or in EURO on CIF <strong>Nepal</strong> Border and total price of Inland<br />

Delivery to final destination in <strong>Nepal</strong>ese Rupees basis if applicable. For this purpose, “<strong>Nepal</strong> Border”<br />

means India/<strong>Nepal</strong> border of Jogbani/Biratnagar, Raxaul/Birgunj, Sunauli/Bhairahawa,<br />

Rupaidiya/<strong>Nepal</strong>gunj, Gaurifanta/Dhangadhi and China/<strong>Nepal</strong> border of Zhangmu (Khasa)/Tatopani.<br />

The prices shall be exclusive of taxes/duties such as VAT, Local Development Tax, Custom Duties, and<br />

Security Tax etc. applicable at the port of entry in <strong>Nepal</strong>.<br />

6.2 The Bidder shall be responsible to pay withholding tax (TDS – Tax Deduction at Source) as per the<br />

Income tax law of government of <strong>Nepal</strong> applicable at the time of the payment.<br />

6.3 The Bidders from <strong>Nepal</strong> shall quote in <strong>Nepal</strong>ese currency on CIP <strong>Nepal</strong> <strong>Telecom</strong>'s respective stores<br />

basis and payments will be made accordingly. This price shall be inclusive of taxes/duties such as VAT,<br />

Local Development Tax, Custom Duties, and Security Tax etc. applicable in <strong>Nepal</strong>. Such Bidder must<br />

submit up to date firm / company registration cerificate and tax clearance certificate from Government<br />

of <strong>Nepal</strong>.<br />

6.4 The Bidder from outside <strong>Nepal</strong>, if wishes to supply goods and/or services with <strong>Nepal</strong> as country of<br />

origin or wishes to quote in <strong>Nepal</strong>ese currency fully or partially, shall quote in <strong>Nepal</strong>ese currency. This<br />

price shall be inclusive of taxes/duties such as VAT, Local Development Tax, Custom Duties, and<br />

Security Tax etc. applicable in <strong>Nepal</strong>. Such Bidder must submit Tax Invoice with VAT number.<br />

6.5 If the Supplier who has quoted the price in foreign currency wishes to receive the payment in <strong>Nepal</strong>ese<br />

currency, the exchange rate applicable for such conversation shall be as per the exchange rate of the Bid<br />

Opening Date.<br />

6.6 In case of <strong>Nepal</strong>ese companies bidding on behalf of a Principal Manufacturer / Bidder (other than<br />

<strong>Nepal</strong>ese Manufacturer / Bidder), the <strong>Nepal</strong>ese Bidder:<br />

1. Shall furnish authenticated document showing the Bidder (<strong>Nepal</strong>ese <strong>Company</strong>) has been<br />

authorized to submit a Bid, and subsequently negotiate and sign the contract.<br />

2. Shall quote the prices as stated in clause no.-6.1 of Section III: Instructions To Bidders (ITB).<br />

3. Shall submit Power of Attorney to submit and sign the Bid offer (if applicable).<br />

4. The <strong>Nepal</strong>ese Bidder furnishing the Bid Security on behalf of the Principle Manufacturer/Bidder<br />

shall preferably state the Bidder’s name as “ M/S____ (Name of Bidder) bidding on behalf of<br />

M/S_____ (Name of Principal Manufacturer/Bidder)”. The name and address of principal<br />

company must be mentioned in the bid and the payments will be made accordingly to the principal<br />

company or the foreign company (not to the <strong>Nepal</strong>ese <strong>Company</strong>.<br />

5. <strong>Nepal</strong> <strong>Telecom</strong> shall open L/C in the name of Principle Manufacturer/Bidder and payment shall be<br />

made to the Principal Manufacturer/Bidder only after deducting TDS (Tax Deduction at Source)<br />

applicable at the time of payment as per Income Tax law of <strong>Nepal</strong>.<br />

6.7 The prices shall be fixed and will not be subjected to any variation<br />

6.8 The unit price of all goods, services and inland transportation (if applicable) shall be quoted in Section<br />

VIII: Price Schedule and Quantity Thereof for offered items. In column related to price in Price<br />

Schedule, except monetary value, Bidder shall not qoute any other text such as "Included Above", "<strong>No</strong>t<br />

Applicable", "<strong>No</strong>t Available", "Free of Cost" etc.<br />

6.9 “Discount” and “Free of Cost” goods, services, delivery etc, if any, offered by the Bidders shall not be<br />

considered. Therefore, Bidders desiring to offer discount or Free of Cost goods, services, delivery etc.<br />

shall modify their offers suitably while quoting and shall quote clearly net price taking all such factors<br />

like discount, free of cost etc. into account.<br />

6.10 The quoted unit prices of all the spares shall remain valid until two (2) years from the date of completion<br />

of Warranty Period as mentioned in the Clause <strong>No</strong>. 6 of Section IV: COC and applicable in all<br />

subsequent purchases on later dates within or after the warranty period.<br />

6.11 Unit Prices of the offered goods, services and inland transportation in all lots, phases and packages shall<br />

be same.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 8 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

6.12 The terms FOB, CIF, CIP, etc., shall be governed by the rules prescribed in the current edition of<br />

INCOTERMS published by the International Chamber of Commerce, Paris.<br />

Any bid not submitted as per the Clause <strong>No</strong>. - 6.1 - 6.7 shall be rejected.<br />

7. Bid Security<br />

7.1 Pursuant to clause <strong>No</strong>. - 4 of Section II, the bidder shall furnish, as part of its bid, Bid Security of US$<br />

31,000.00 (In words: United States Dollars: Thirty One Thousand only) or Euro 24,000.00 (In words:<br />

Euro: Twenty Four Thousand only) or NRs 2,300,000.00 (In words: <strong>Nepal</strong>ese Rupees: Two Million and<br />

Three Hundred Thousand only).<br />

The Bid Security must be furnished or counter guaranteed by one of the banks listed in Annex IV: List<br />

of the Approved Banks by <strong>Nepal</strong> <strong>Telecom</strong>.<br />

If bidder wishes to submit the Bid Security in the form of cash, the cash should be deposited in Deposit<br />

Account of <strong>Nepal</strong> <strong>Telecom</strong> and submit the receipt of the deposited amount of cash along with the bid.<br />

Name of the bank and account number shall be provided as per the request of the potential bidder.<br />

7.2 Bid Security shall remain valid up to February 6, 2011.<br />

7.3 Any bid not secured in accordance with clause <strong>No</strong>s. 7.1 and 7.2 shall be rejected.<br />

7.4 The bid security is required to protect the <strong>Nepal</strong> <strong>Telecom</strong> against the risk of bidder's non-performance.<br />

7.5 The Bid Securities of all the bidders will be discharged upon signing of the Contract and after furnishing<br />

the Performance Security by the Successful Bidder, pursuant to Clause <strong>No</strong>. – 4 of Section IV:<br />

Conditions of Contract (COC).<br />

7.6 The Bid Security shall be forfeited<br />

(a)<br />

(b)<br />

If the Bidder withdraws its bid during the period of bid validity specified by the bidder on the Bid<br />

Form;<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 9 of 63<br />

OR<br />

If the Bidder, having been notified of the acceptance of its’ bid by the <strong>Nepal</strong> <strong>Telecom</strong> during the<br />

period of bid validity, either fails or refuses to sign the contract agreement within fifteen (15) days<br />

from the date of issuance of Letter of Intent (LOI); or fails or refuses to furnish the Performance<br />

Security in accordance with clause <strong>No</strong>. - 4 of Section IV: Conditions of Contract.<br />

7.7 If due to certain reasons, bid submission date is extended, the validity of the Bid Security shall be<br />

extended accordingly without which bid shall be rejected.<br />

8. Period of Validity of Bids<br />

8.1 Bids shall remain valid up to January 7, 2011.<br />

Bids, not valid until the date mentioned above, shall be rejected.<br />

8.2 In exceptional circumstances, the <strong>Nepal</strong> <strong>Telecom</strong> may solicit the Bidder's consent to an extension of the<br />

period of validity. The request and the responses thereto shall be made in writing. The Bid Security<br />

provided under Clause <strong>No</strong>. - 7 of Section III: ITB shall also be suitably extended. A Bidder may refuse<br />

the request without forfeiting its Bid Security. A Bidder granting the request will not be required nor<br />

permitted to modify its bid.<br />

8.3 If due to certain reasons, bid submission date is extended the validity of the bid shall be extended<br />

accordingly without which bid shall be rejected.<br />

9. Formats, Sealing, Marking and Signing of Bids<br />

9.1 The Bidders are required to submit the bids in three (3) separate envelopes each envelope sealed<br />

properly as follows:<br />

(a)<br />

(b)<br />

(c)<br />

1st envelope with seal and marked as "Original", shall contain original documents as per Part - A<br />

of Section I: Important <strong>No</strong>tice to Bidders (INB).<br />

2nd envelope with seal and marked as "Copy", shall contain copy documents as per Part - A of<br />

Section I: Important <strong>No</strong>tice to Bidders (INB).<br />

3rd envelope with seal and marked as "Document for Bid Opening", shall contain original<br />

documents as per Part - B of Section I: Important <strong>No</strong>tice to Bidders.


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

In the event of any discrepancy between original and copy document, the original hard copy<br />

document shall prevail.<br />

9.2 The original and the copy or copies of the bid shall be typed or written in indelible ink and shall be<br />

signed by the Bidder or a person or persons duly authorized to bind the Bidder to the Contract. All pages<br />

of the bid, except for un-amended printed literature, shall be initialed by the authorized person or<br />

persons signing the bid. But, the pages containing conditions of contract and technical compliance<br />

statement shall be signed and stamped with official seal by the bidder (authorized person). Please refer<br />

to Clause <strong>No</strong>. - b: Part-A of Section I : Important <strong>No</strong>tice to Bidders also.<br />

9.3 Any interlineations, erasures, or overwriting shall be valid only if they are initialed by the authorized<br />

person or persons signing the bid. Please refer to Clause <strong>No</strong>. - b: Part-A of Section I : Important <strong>No</strong>tice<br />

to Bidder also.<br />

9.4 (a) The inner and outer envelopes shall be addressed to the <strong>Nepal</strong> <strong>Telecom</strong> at the following address:<br />

<strong>Nepal</strong> <strong>Telecom</strong>,<br />

(<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong>),<br />

Material Management Department,<br />

Bhadrakali Plaza, Kathmandu, <strong>Nepal</strong>.<br />

Tel. <strong>No</strong>. : 977 1 4210309<br />

Fax <strong>No</strong>. : 977 1 4227260<br />

(b) Bearing “Invitation for Bids <strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of<br />

Underground Duct Cables” and the words “Do <strong>No</strong>t Open Before Opening Date” i.e. September 9,<br />

2010 and indicate the name and address of the bidder to enable the bid to be returned unopened in case<br />

it is declared “LATE”.<br />

9.5 If the outer envelope is not sealed and marked as required by Clause <strong>No</strong>. – 9.4, the <strong>Nepal</strong> <strong>Telecom</strong> will<br />

assume no responsibility for the bid's misplacement or premature opening of the bid submitted. The bid<br />

thus received will be rejected.<br />

9.6 In order to facilitate evaluation of the bid, the bidder shall provide the complete bidding documents in<br />

hard copy as well as soft copy including Price Schedule, Schedule of Requirements, Compliance<br />

Statements of both Commercial and Technical requirements, other calculations etc. In case of<br />

discrepancy between hard copy and soft copy, hard copy shall prevail.<br />

10. Deadline for Submission of Bids<br />

10.1 Bids must be received by the <strong>Nepal</strong> <strong>Telecom</strong> at the address specified under Clause <strong>No</strong>. - 9.4 (a) not later<br />

than 11: 45 a.m. on September 9, 2010.<br />

However, if the submission date is declared to be public holiday, the submission date will be postponed<br />

for the next working day at the said time.<br />

10.2 <strong>Nepal</strong> <strong>Telecom</strong> may, at its discretion, extend this deadline for the submission of bids by amending the<br />

bidding documents at any time prior to opening date of the Bid.<br />

11. Modification, and Withdrawal of Bids<br />

11.1 The Bidder may modify or withdraw its Bid after the Bid's submission, provided that written notice of the<br />

modification or substiturion or withdrawal is received by the Purchaser prior to the deadline for<br />

submission of Bids prescribed in Clause 10 of this section.<br />

11.2 The bidder's modification or withdrawal notice shall be prepared, sealed and marked and dispatched in<br />

accordance with the provisions of Clause 9 and 11.1 of this section, with the outer and inner envelopes<br />

duly marked as "WITHDRAWAL" or "MODIFICATION" as appropriate.<br />

11.3 <strong>No</strong> Bid may be withdrawn, modified after the deadline of submission of Bids.<br />

11.4 <strong>No</strong> Bid may be withdrawn in the interval between the deadline for submission of Bids and the expiration<br />

of the period of Bid validity specified by the Bidder on the Bid Form. Withdrawal of a Bid during this<br />

interval may result in the Bidder's forfeiture of its Bid Security, pursuant to tlhe sub-clause 7.6 of this<br />

section.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 10 of 63


12. Late Bids<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Any bid received by <strong>Nepal</strong> <strong>Telecom</strong> after the date and the time of submission of bids pursuant to Clause <strong>No</strong>. -<br />

10 of Section III: Instructions to Bidders (ITB) shall be rejected.<br />

13. Opening of Bids by the <strong>Nepal</strong> <strong>Telecom</strong><br />

13.1 The <strong>Nepal</strong> <strong>Telecom</strong> will open bids, in the presence of bidder's representatives who choose to attend at<br />

12.00 noon on September 9, 2010 at the <strong>Nepal</strong> <strong>Telecom</strong>, Central Office, <strong>Doorsanchar</strong> Bhawan,<br />

Bhadrakali Plaza, Room <strong>No</strong>. - 201. In case, the bid opening date happens to be an official holiday, the<br />

<strong>Nepal</strong> <strong>Telecom</strong> will open the bids in the following working day. The bidder representatives who are<br />

present shall sign a bid opening checklists evidencing their attendance.<br />

13.2 First, envelopes marked "WITHDRAWAL" shall be opened, read out and recorded and the envelope<br />

containing the corresponding bid shall not be opened but return to the bidder. <strong>No</strong> bid shall be withdrawn<br />

unless the corresponding Withdrawal <strong>No</strong>tice contains a valid authorization to request the withdrawal and<br />

is read out and recorded at bid opening.<br />

13.3 Next, envelopes marked "MODIFICATION" shall be opened, read out and recorded with the<br />

corresponding bid. <strong>No</strong> bid shall be modified unless the corresponding Modification <strong>No</strong>tice contains a<br />

valid authorization to request the modification and is read out and recorded at bid opening. Only<br />

envelopes that are opened, read out and recorded at bid opening shall be considered further.<br />

13.4 The Bidder's names, bid prices, modifications, bid withdrawals and the presence or absence of the<br />

requisite bid security and such other details as <strong>Nepal</strong> <strong>Telecom</strong> at its discretion, may consider appropriate<br />

will be announced at the opening.<br />

13.5 The <strong>Nepal</strong> <strong>Telecom</strong> shall prepare minutes of the bid opening.<br />

14.1 Delivery Schedule<br />

Delivery of all the goods shall be made to the <strong>Nepal</strong> <strong>Telecom</strong>'s respective stores as mentioned in Clause <strong>No</strong>. –<br />

5 of Section IV: Conditions of Contract (COC) and quantity mentioned in Section VI: Schedule of<br />

Requirement for offered goods.<br />

If the offered delivery period is more than the period specified in clause no. 5.1 of Section IV: Conditions of<br />

Contract (COC), the price adjustment will be made by loading the bid price by one half (0.5%) percent of the<br />

total quoted price per week for the delayed period up to four (4) weeks.<br />

Bids with deviation in delivery period mentioned in Clause <strong>No</strong>. - 5 of Section IV: Conditions of Contract<br />

(COC) by more than four (4) weeks shall be rejected.<br />

14.2 Warranty<br />

The Bidder shall comply with the warranty clauses as mentioned in Clause <strong>No</strong>. – 6 of Section IV: Conditions<br />

of Contract (COC).<br />

15. Payment<br />

Bid with any deviation in payment term as mentioned in Clause <strong>No</strong>. – 7 of Section IV: Conditions of Contract<br />

(COC) shall be rejected.<br />

16. Bidder’s/Manufacturer’s eligibility and experience and Equipment Field Proven-Ness<br />

16.1 Bidders Eligibility.<br />

16.1.1 Bidder shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by<br />

Government of <strong>Nepal</strong>. The Bidder and Manufacturer who are black listed or are under the process of<br />

being black listed shall not be eligible to participate this bidding process. The bid offered by such Bidder<br />

and Manufacturer shall not be considered for the bid evaluation.<br />

16.1.2 The Bidder must have a minimum total sales turnover of and above USD 5 million in the last three<br />

(3) fiscal years which shall be supported by audited financial statements.<br />

16.1.3 Bidder shall not have ownership with competitors of <strong>Nepal</strong> <strong>Telecom</strong> in <strong>Nepal</strong> and must not have plan to<br />

have ownership until the completion of all the contractual obligations.<br />

16.1.4 Bidder found to be involved in fraudulent activity such as carteling in order to manipulate the bid price,<br />

submission of fake certificates and fake information may be blacklisted and Bid submitted shall be<br />

rejected<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 11 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

16.1.5 In case of global companies, the bid must be fully supported by the Head Quarters (HQ).<br />

16.2 Manufacturer’s Experience and Equipment Field Proven-ness<br />

16.2.1 The manufacturer must have a manufacturing experience of at least ten (10) years in manufacturing of<br />

offered goods. The bidder shall furnish the legal document to authenticate their manufacturing<br />

experience.<br />

16.2.2 The Bidder shall provide the manufacturing experience of offered goods for at least ten (10) years in<br />

the offered capacity range or higher.<br />

16.2.3 All Goods and related services to be supplied under the Contract shall have their origin. For purposes<br />

of this Clause, “origin” shall be considered to be the place where the Goods are mined, grown,<br />

produced or from which the Services are provided. Goods are produced when, through<br />

manufacturing, processing, or substantial and major assembly of components, a commerciallyrecognized<br />

product results that is substantially different in basic characteristics or in purpose or utility<br />

from its components.<br />

The Bidder shall submit the Country of Origin Certificate issued by Chamber of Commerce.<br />

16.2.4 If the Bidder, bidding for the offered goods which are manufactured by companies under the license or<br />

joint-venture with other company of renowned brand, the offered product shall be considered to be<br />

manufactured by the joint venture company or the company that actually manufactures the product and<br />

not of the parent company. Hence, manufacturing experience, supply records, user's satisfaction<br />

certificate, sales turnover etc. shall be considered only of the joint-venture company or the company that<br />

actually manufactures the product and not of the parent company.<br />

16.2.5 The offered goods shall have been used satisfactorily for a minimum period of five (5) years on the<br />

date of bid opening.<br />

16.2.6 The Bidder/Supplier/Manufacturer who has already supplied offered type of goods to <strong>Nepal</strong><br />

<strong>Telecom</strong>, within last five (5) years shall also furnish the Satisfactory Performance Certificate<br />

issued for this tender by Material Management Department, <strong>Nepal</strong> <strong>Telecom</strong>. Failure to furnish<br />

this certificate by the Bidder/Supplier/Manufacturer who has already supplied offered type of goods<br />

to <strong>Nepal</strong> <strong>Telecom</strong> may lead to the rejection of bid.<br />

16.2.8 Proof of Compliance: Beside the information submitted by the Bidder along with the bid, <strong>Nepal</strong><br />

<strong>Telecom</strong> may seek additional and adequate information about the operational experience and<br />

performance satisfaction of the users of identical enclosures, under operation in any two telecom or<br />

other organizations in the country other than the manufacturer's own country. Therefore, <strong>Nepal</strong><br />

<strong>Telecom</strong>, after documentary evaluation of the responsive bid, may notify the most competitive bidder<br />

to arrange for either field visit to at least two sites having identical systems in operation whose<br />

certificates have been provided or factory inspection to determine the physical, technical and<br />

production capability of the manufacturer to perform the contract or both. Based on the satisfactory<br />

evaluation and the report submitted by the technical team, <strong>Nepal</strong> <strong>Telecom</strong> may qualify / disqualify<br />

the offer and award bid accordingly.<br />

In close co-ordination with <strong>Nepal</strong> <strong>Telecom</strong>, the bidder shall facilitate to arrange for such visit. <strong>Nepal</strong><br />

<strong>Telecom</strong> shall bear all the expenses of <strong>Nepal</strong> <strong>Telecom</strong>'s Inspectors for such visit.<br />

16.3 Manufacturer’s Authorization Letters<br />

The Bidder shall submit Manufacturer’s Authorization Letter for the offered goods/ items (as per<br />

Section V: Sample Form <strong>No</strong>. - 3 “Manufacturers Authorization Letter” enclosed in the bid<br />

document) from the manufacturer of offered goods.<br />

If the Bidder itself claims to be the manufacturer of the goods/ items, such bidder shall provide the proof<br />

of being the manufacturer and need not provide the authorization for the goods/ items it manufactures.<br />

<strong>No</strong>n-submission of Manufacturer's Authorization Letter(s) from the Manufacturer(s) or shall<br />

result in rejection of the bid.<br />

16.4 Satisfactory Performance Certificate (SPC)<br />

Original certificates, incorporating adequate information as specified in Annex VII: Satisfactory<br />

Performance Certificate enclosed in the bid document and clause 16.2.5 of this section, from three (3)<br />

telecom operators (or user administrations) and two of them shall be from countries other than the<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 12 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

manufacturer's own country in certification of the satisfactory performance of the offered goods in actual<br />

service shall be furnished along with the bid.<br />

The <strong>Nepal</strong> <strong>Telecom</strong> reserves the right to verify with the said administrations, the satisfactory uses of the<br />

goods supplied to them.<br />

The Bidder shall provide the names and addresses of the three administrations whose certificates have<br />

been provided. The names, telephone numbers and fax numbers of the contact persons shall also be<br />

provided.<br />

17. Bid Evaluation and Award Criteria<br />

17.1 In case a bidder offers one or more alternate or optional offer(s) in addition to the main offer, the<br />

<strong>Nepal</strong> <strong>Telecom</strong> will consider only the main offer for evaluation purpose, and under no circumstances,<br />

evaluation will be influenced by anything mentioned in alternate or optional offer(s).<br />

However, based on cost-benefit and/ or technical analysis, the <strong>Nepal</strong> <strong>Telecom</strong>, if deemed necessary,<br />

may consider alternate or optional offer(s) during contract negotiation with the successful bidder.<br />

17.2 Preliminary Examination<br />

17.2.1 Preliminary Examination of the Bids shall be done in accordance with Clause <strong>No</strong>. 5.1 of<br />

Section III: ITB. <strong>Nepal</strong> <strong>Telecom</strong> will examine the bids to verify whether the bid is valid &<br />

complete, whether the bid is accompanied by valid bid securities, whether required sureties<br />

have been furnished, whether the documents have been properly signed, and whether the bids<br />

are generally in order.<br />

17.2.2 <strong>Nepal</strong> <strong>Telecom</strong> may waive any minor informality, nonconformity, or irregularity in a bid,<br />

which does not constitute a major material and quality deviation and without which the<br />

purpose of bidding will be fulfilled provided such waiver does not prejudice or affect the<br />

relative ranking of any bidder but bids with any deviations to the clauses marked with<br />

asterisk (*) shall be considered as major deviations and the bid with such major deviations<br />

shall be rejected.<br />

17.2.3 Prior to the detailed evaluation, <strong>Nepal</strong> <strong>Telecom</strong> will determine the substantial responsiveness<br />

of each bid to certain critical provisions stipulated in the <strong>Nepal</strong> <strong>Telecom</strong> tender document.<br />

For the purpose of this clause, a substantially responsive bid is the one, which conforms to all<br />

the terms and conditions of the bidding documents without major material deviations.<br />

Deviations from, or objections or reservations to critical provisions, such as those concerning<br />

Bid Security, Payment Terms, Applicable Law and Taxes and Duties and the technical<br />

requirements marked with asterisk (*) will be deemed to be major deviations as mentioned in<br />

Clause <strong>No</strong>. – e of Part – D of Section I : INB.<br />

Further, if there are many minor deviations to the bid, and if these items together constitute a<br />

major material deviation or affects the required purpose of a module/sub-module, such bid<br />

shall be rejected.<br />

<strong>Nepal</strong> <strong>Telecom</strong>’s determination of a bid’s responsiveness will be based on the contents of the<br />

bid itself without recourse to any extrinsic evidence.<br />

17.2.4 If a bid has one or more major deviations, it will be rejected by the <strong>Nepal</strong> <strong>Telecom</strong> and will<br />

not substantially be made responsive by the bidder by correction of the nonconformity.<br />

17.3 Detailed Technical Evaluation<br />

17.3.1 Detailed Technical evaluation shall be carried out for those bids, which are found to be<br />

responsive after preliminary examination as per above clause 17.2. Detailed Technical<br />

evaluation shall be based on clause by clause compliance statements or comments on<br />

Technical Specifications as well as technical details, catalogues, brochures etc. furnished by<br />

each bidder.<br />

17.3.2 If a bid has one or more major deviations, it will be rejected by the <strong>Nepal</strong> <strong>Telecom</strong> and will<br />

not substantially be made responsive by the bidder by correction of the nonconformity.<br />

17.4 Detail Commercial Evaluation<br />

17.4.1 Detailed Commercial Evaluation shall be carried out for those bids, which are found to be<br />

responsive after Detail Technical Evaluation as per above clause 17.3. Detailed Commercial<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 13 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Evaluation shall be based on clause by clause compliance statements on condition of contract<br />

(Section IV).<br />

17.5 Detail Financial Evaluation<br />

17.5.1 Once the bids are considered substantially responsive after detailed Technical and<br />

Commercial evaluation, all those responsive bids shall be judged from Financial Evaluation<br />

only and no weight-age shall be given to other technical details or parameters or additional<br />

features and facilities of the offered products.<br />

17.5.2 For the Financial Evaluation the following factors shall be taken into consideration for<br />

evaluation purpose:<br />

17.5.2.1 Arithmetical errors<br />

Arithmetical errors will be rectified on the following basis<br />

17.5.2.1.1 If there is a discrepancy between the unit price and the total price<br />

which is obtained by multiplying the unit price and quantity, the<br />

unit price shall prevail, and the total price will be corrected.<br />

17.5.2.1.2 If there is a discrepancy between words and figures, the amount in<br />

words will prevail.<br />

17.5.2.2 Offered Quantity<br />

If the offered quantity is not sufficient to meet the <strong>Nepal</strong> <strong>Telecom</strong>’s requirement,<br />

required quantity will be loaded to fulfill the requirement and price will be<br />

adjusted accordingly taking into consideration the offered unit price of the same<br />

bidder.<br />

If some required items are missing in the offer, then the highest price for such<br />

missing item(s) among the qualified bidder will be considered for evaluation<br />

purpose and loaded to bring all bidders in equal footing.<br />

However, if the bidder who misses/short supplies the required items happens to<br />

be the successful bidder, the missed/short supplied items shall be provided free of<br />

cost to the <strong>Nepal</strong> <strong>Telecom</strong>.<br />

If major items, without which the purpose of bidding will not be fulfilled, are<br />

missing, the bid shall be considered non-responsive and shall be rejected.<br />

17.5.2.3 Delivery Period<br />

If the offered delivery period is more than the period specified in clause <strong>No</strong>. – 5.1<br />

of Section IV: Conditions of Contract, the price adjustment will be made by<br />

loading the bid price by one half (0.5%) percent of the total quoted price per<br />

week for the delayed period up to four (4) weeks. Bids with deviation in<br />

delivery period by more than four (4) weeks will be rejected.<br />

17.5.2.4 Unit Price<br />

17.5.2.5 Discount<br />

Unit Prices of the offered goods, services and inland transportation in all lots,<br />

phases and packages shall be same. In case of discrepancies in the Unit prices, the<br />

highest Unit Price among the all shall be considered for all lots, phase and<br />

packages for evaluation purpose. However, lowest unit Price among the<br />

responsive Bidders shall be considered for the calculation and preparation of final<br />

Contract Price if the bidder happens to be the Successful Bidder.<br />

If the unit price is not quoted, the evaluation will be done with loading the highest<br />

price among the responsive bidders and the lowest unit price among the<br />

responsive Bidders shall be considered for the calculation and preparation of<br />

Final Contract Price if the bidder happens to be a Successful Bidder.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 14 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

If, in case, the bidder quote lump sum Discounts and “Free of Cost (FOC)” items<br />

in the Schedule of Price, the Discounts and Free of Cost shall not be considered<br />

and Unit Price of the discounted and FOC items shall be considered for the<br />

evaluation purpose. However, discounts and FOC shall be considered while<br />

calculating and preparing final contract amount if the bidder happens to be a<br />

Successful Bidder.<br />

If the Bidder does not accept the correction of the errors, its bid will be rejected, and its bid<br />

security shall be forfeited. The <strong>Nepal</strong> <strong>Telecom</strong> reserves the rights to award the tender to the<br />

next lowest bidder or may go for re-tender whichever is convenient<br />

17.6 Clarification of Bids<br />

To assist in the examination, evaluation and comparison of Bids, <strong>Nepal</strong> <strong>Telecom</strong> may ask the Bidder for a<br />

clarification/Additional Information/Proof of Authenticity of the submitted document. The request for<br />

clarification and the response to it shall be in writing, and no change in the prices and substance of the Bid<br />

shall be sought, offered, or permitted.<br />

If the Bidder fails to submit the requested clarification/Additional Information/Proof of Authenticity of the<br />

submitted document within a stipulated time, the clause for which the request is sought is considered to be<br />

non compliant by Bidder.<br />

7.7 Proof of Concept (POC) Test<br />

(<strong>No</strong>t Applicable)<br />

17.8 Contract Award<br />

17.8.1 Based on evaluation as per above clause <strong>No</strong>s. – 17.1, 17.2, 17.3, 17.4, 17.5, 17.6 and 17.7 the lowest<br />

responsive bid will be selected as the successful bid.<br />

As financial evaluation shall be done as per Clause <strong>No</strong>. – 17.5, total evaluated price may differ from the<br />

price quoted by the bidder in its price schedule. Financial comparison shall be based on “Evaluated Price”<br />

and not “Offered Price”. However, the final total contract price shall be finalized during contract<br />

negotiation with the successful bidder.<br />

17.8.2 The <strong>Nepal</strong> <strong>Telecom</strong> shall issue a Letter of Intent (LOI) to notify the concerned Bidder whose bid has been<br />

selected in accordance with ITB 17.8.1, in writing that the <strong>Nepal</strong> <strong>Telecom</strong> has intention to accept his/her bid<br />

and the information regarding the name, address and amount of selected bidder shall be given to all other<br />

bidders who submitted the bid.<br />

17.8.3 If no bidder submits an application for review within a period of seven days of the notice provided under ITB<br />

17.8.2, <strong>Nepal</strong> <strong>Telecom</strong> shall, accept the bid selected in accordance with ITB 17.8.1 and will subsequently<br />

issue a Letter of Acceptance (LOA) to furnish the performance security and to initiate negotiation between<br />

the bidder and the <strong>Nepal</strong> <strong>Telecom</strong> within fifteen days.<br />

17.8.4 Within Fifteen (15) days of the receipt of notification of award from <strong>Nepal</strong> <strong>Telecom</strong>, the successful Bidder<br />

shall furnish the performance security in accordance with the conditions of Contract using Sample Form as<br />

per Sample Form <strong>No</strong>. – 4 of Section V of tender document. Failure of the successful Bidder to submit the<br />

above-mentioned Performance Security or to sign the Contract Agreement within the period stipulated in<br />

clause ITB 17.8.4 shall constitute sufficient grounds for the annulment of the award and forfeiture of the bid<br />

security. In that event <strong>Nepal</strong> <strong>Telecom</strong> may award the Contract to the next lowest evaluated Bidder whose<br />

offer is substantially responsive. The process shall be repeated according to ITB 17.8.4.<br />

18. <strong>Nepal</strong> <strong>Telecom</strong>'s Right to accept or reject any or all Bids<br />

<strong>No</strong>t withstanding Clause <strong>No</strong>. – 17, the <strong>Nepal</strong> <strong>Telecom</strong> reserves the right to accept or reject partially or fully<br />

any bid, and to annul the bidding process and reject all bids, at any time prior to award of contract, without<br />

thereby incurring any liability to the affected bidder, or bidders or any obligation to inform the affected bidder<br />

or bidders of the grounds for the <strong>Nepal</strong> <strong>Telecom</strong>'s action.<br />

19. <strong>Nepal</strong> <strong>Telecom</strong>'s Right to Vary Quantities<br />

The <strong>Nepal</strong> <strong>Telecom</strong> reserves the right at the time of award of contract to increase or decrease by up to twenty<br />

percent (20%) of the quantity of goods and services specified in the Schedule of Requirement without any<br />

change in unit price or other terms and conditions.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 15 of 63


20. Signing of Contract<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

After the receipt of the Letter of Acceptance (LOA) from <strong>Nepal</strong> <strong>Telecom</strong>, the successful bidder shall send it’s<br />

authorized representatives within fifteen (15) days for contract negotiation and signing the contract. At the<br />

time of signing the contract, the Supplier shall submit a Performance Security in the form of bank guarantee<br />

for ten percent (10%) of the amount of the contract in the same currency as that of the contract or equivalent in<br />

US$.<br />

<strong>No</strong>n-submission of performance security at the time of signing the contract may lead to the cancellation of the<br />

contract.<br />

21 Local Agent<br />

21.1 A foreign Bidder wishing to have or already having a local agent should state the following:<br />

i. Name and address of the Agent/Representative,<br />

ii. The Agent/Representative providing type of services,<br />

iii. Amount of commission if the Agent/ Representative is entitled to get such payment and if he/she<br />

participate in the procedure of payment,<br />

iv. Other agreement with Agent/Representative, if any,<br />

v. Bidder should certify in the Letter of Authorization as follows:<br />

"We certify that the statement and disclosure made by us on the above are complete and true to the<br />

best of our knowledge and belief"<br />

If the agent has not been appointed:<br />

I. Source of information about tender invitation,<br />

II. The remuneration given to the individual or firm/company or organization to work on his behalf<br />

for submitting tender, representation in the bid opening and other required action in connection<br />

with the tender,<br />

III. Transfer or handover an evidence of foreign currency exchanged which required to be submitted<br />

with the tender,<br />

IV. If the bank account of any <strong>Nepal</strong>i citizen has been used for the exchange of foreign currency<br />

specify the name of the individual and his address. If the foreign currency has been exchanged by<br />

self then the certificate of currency exchange<br />

21.2 If a foreign Bidder in his Bid, has not provided the information mentioned in clause <strong>No</strong> 21.1 or has submitted<br />

his bid stating that the Bidder does not have a local agent and later it is proved that the bidder has a local agent<br />

or it is proved that the commission mentioned in the Bid is less than the commission received by the local<br />

agent then the Purchaser shall initiate proceedings to black list such bidder.<br />

22 One Bid per Bidder<br />

Each Bidder/Manufacturer shall submit only one bid, either individually or as a partner. A<br />

Bidder/Manufacturer who submits or participates in more than one bid shall cause all the proposals with the<br />

Bidder’s/Manufacturer’s participation to be disqualified.<br />

23 Corrupt or Fraudulent Practices<br />

23.1Government of <strong>Nepal</strong> requires that Purchaser, as well as Bidders observe the highest standard of ethics during<br />

the procurement and execution of such contracts. In pursuance of this policy, the Government of <strong>Nepal</strong>:<br />

a) defines, for the purposes of this provision, the terms set forth below as follows:<br />

(i)<br />

“corrupt practice” means the offering, giving, receiving or soliciting of any thing of value to<br />

influence the action of a public official in the procurement process or in contract execution;<br />

and<br />

(ii) “fraudulent practice” means a misrepresentation of facts in order to influence a procurement<br />

process or the execution of a contract to the detriment of the HMGN, and includes collusive<br />

practice among Bidders (prior to or after Bid submission) designed to establish Bid prices at<br />

artificial non-competitive levels and to deprive the Borrower of the benefits of free and<br />

open competition;<br />

b) will reject a proposal for award if it determines that the Bidder recommended for award has engaged in<br />

corrupt or fraudulent practices in competing for the contract in questions<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 16 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

c) will declare a firm ineligible for a stated period of time, to be awarded a GON/Donor funded contract<br />

if it at any time determines that the firm has engaged in corrupt or fraudulent practices in competing<br />

for, or in executing, a GoN/Donor funded contract.<br />

24 Conduct of Bidders<br />

24.1 The Bidder shall be responsible to fulfil his obligations as per the requirement of the Contract Agreement,<br />

Instruction to Bidders and GoN’s Procurement Act and Regulations.<br />

24.2 The Bidder shall not carry out or cause to carryout the following acts with an intention to influence the<br />

implementation of the procurement process or the procurement agreement :<br />

a. give or propose improper inducement directly or indirectly,<br />

b. distortion or misrepresentation of facts,<br />

c. engaging in corrupt or fraudulent practice or involving in such act,<br />

d. interference in participation of other competing bidders,<br />

e. coercion or threatening directly or indirectly to cause harm to the person or the property of any person to be<br />

involved in the procurement proceedings,<br />

f. collusive practice among bidders before or after submission of bids for distribution of works among<br />

bidders or fixing artificial/uncompetitive bid price with an intention to deprive the Purchaser the benefit<br />

of open competitive bid price.<br />

g. contacting the Purchaser with an intention to influence the Purchaser with regards to the bids or<br />

interference of any kind in examination and evaluation of the bids during the period from the time of<br />

opening of the bids until the notification of award of contract<br />

25 Blacklisting Bidders<br />

25.1 Without prejudice to any other rights of the Purchaser under this Contract , the Public Procurement Monitoring<br />

Office (PPMO) may blacklist a Bidder for his conduct up to three years on the following grounds and<br />

seriousness of the act committed by the bidder:<br />

a) if it is proved that the bidder committed acts contrary to the Sub - clause 30,<br />

b) if the bidder fails to sign an agreement pursuant to clause 20,<br />

c) if it is proved later that the bidder has committed substantial defect in implementation of the contract<br />

or has not substantially fulfilled his obligations under the contract or the completed work is not of the<br />

specified quality as per the contract ,<br />

d) if convicted by a court of law in a criminal offence which disqualifies the bidder from participating in<br />

the contract.<br />

e) if it is proved that the contract agreement signed by the bidder was based on false or misrepresentation<br />

of bidder’s qualification information,<br />

f) other acts mentioned in the Section III: ITB and Section IV: COC<br />

End of Section III: Instructions to Bidders (ITB)<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 17 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section IV : Conditions of Contract (COC)<br />

Clause <strong>No</strong>.<br />

Table of Clauses<br />

1 Definitions<br />

2 Country of origin<br />

3 Standards<br />

4 Performance Security<br />

5 Delivery<br />

6 Warranty<br />

7 Payment<br />

8 Contract Amendments<br />

9 Assignment<br />

10 Applicable Law<br />

11 Taxes and Duties<br />

12 Liquidated Damages<br />

13 Force Majeure<br />

14 Insurance<br />

15 Patent Rights<br />

16 Documents<br />

17 Inspection and Test<br />

18 Training<br />

19 Additional Orders<br />

20 Termination of Contract<br />

21 Arbitration<br />

22 IP Indemnification<br />

23 Country of Origin, Make and Model of the offered Goods<br />

24 <strong>Nepal</strong> <strong>Telecom</strong> reserves right to accept or Reject<br />

25 Confidentiality<br />

26 Contingency amount<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 18 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section IV : Conditions of Contract (COC)<br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirement.<br />

1 Definitions<br />

In this contract the following terms shall be interpreted as indicated:<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

(a) “The Contract” means the agreement entered into between the <strong>Nepal</strong><br />

<strong>Telecom</strong> and the Supplier, as recorded in the contract agreement form<br />

signed by the parties, including all amendments and appendices thereto<br />

and all documents incorporated by reference therein;<br />

(b) “The Contract Price” means the total contract price of all the goods and<br />

services included in the contract which will be payable to the supplier on<br />

the fulfillment of all obligations under the contract;<br />

(c) “The Goods” means all of the goods, which the Supplier is required to<br />

supply and deliver to the <strong>Nepal</strong> <strong>Telecom</strong> under the contract;<br />

(d) “<strong>Nepal</strong> <strong>Telecom</strong> (NT)” means the purchaser, <strong>Nepal</strong> <strong>Doorsanchar</strong><br />

<strong>Company</strong> <strong>Limited</strong><br />

(e) “MMD” means the Material Management Department of the <strong>Nepal</strong><br />

<strong>Telecom</strong><br />

(f) “The Supplier” means the individual or firm supplying the goods under<br />

this contract;<br />

2 Country of Origin<br />

The bidder shall mention country of origin of all the goods offered in<br />

accordance with the Section VIII: Price Schedule and Quantity thereof of<br />

the tender document and shall not be deviated from the offered country of<br />

origin in the offered bid.<br />

3 Standards<br />

The goods supplied under this contract shall conform to the standards<br />

mentioned in the Technical Specifications.<br />

4 Performance Security<br />

4.1 The successful bidder shall submit a bank guarantee equivalent to ten<br />

percent (10%) of the total contract amount (including inland transportation<br />

cost, if applicable) as Performance Security at the time of signing the<br />

Contract as per Sample Form <strong>No</strong>. – 4 of Section V of tender document,<br />

enclosed in the bid document. The currency of the bank guarantee shall be<br />

in currency of contract or equivalent amount in US$. The validity of the<br />

bank guarantee shall cover one month more than the warranty period as<br />

mentioned in the Clause <strong>No</strong>. – 6 "warranty" of Section IV: Conditions Of<br />

Contract of tender document.<br />

The Performance Security shall be issued or counter guaranteed by<br />

one of the banks as mentioned in clause <strong>No</strong>. – 5 of section II:<br />

Invitation for Bids of tender document.<br />

4.2 The proceeds of the Performance Security shall be payable to <strong>Nepal</strong><br />

<strong>Telecom</strong> as compensation for any loss resulting from the Supplier's failure<br />

to complete its obligations under the Contract. <strong>Nepal</strong> <strong>Telecom</strong> can<br />

terminate the Contract if the Supplier fails to fulfill the obligations as per<br />

the Contract. Upon termination of the Contract, the Performance Security<br />

submitted under the Contract will be forfeited and the loss incurred by<br />

<strong>Nepal</strong> <strong>Telecom</strong> due to termination of the Contract shall be borne by the<br />

Supplier.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 19 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirement.<br />

4.3 The Performance Security will be discharged by the <strong>Nepal</strong> <strong>Telecom</strong> not<br />

later than thirty (30) days following the date of completion of the<br />

Supplier's performance obligations, including any warranty obligations, as<br />

stated in the Clause <strong>No</strong>. - 6 "Warranty" of Section IV: Conditions Of<br />

Contract of tender document under the Contract.<br />

4.4 The bidder bidding on behalf of the principal company/ manufacturer<br />

(other than <strong>Nepal</strong>) shall furnish the performance bond/ guarantee/ security<br />

in the currency quoted in the bid price or in US$ from the principal<br />

company/ manufacturer.<br />

5 Delivery<br />

5.1 The delivery of all the goods shall be made to <strong>Nepal</strong> <strong>Telecom</strong>'s Central stores<br />

in one (1) lot as mentioned in Section VI: Schedule of Requirement of tender<br />

document within one hundred eight (180) days from the date of signing of<br />

Contract.<br />

5.2 Issuance of Certificates<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

Provisional Acceptance Certificate (PAC)<br />

<strong>No</strong>t Applicable<br />

Final Acceptance Certificate (FAC)<br />

<strong>No</strong>t Applicable<br />

Stabilization Completion Certificate (SCC)<br />

<strong>No</strong>t Applicable<br />

Warranty Completion Certificate (WCC)<br />

<strong>Nepal</strong> <strong>Telecom</strong> shall issue - Warranty Completion Certificate (WCC) within<br />

thirty (30) Days after the satisfactorily completion of warranty.<br />

Issuance of Delivery Completion Certificate (DCC)<br />

After complete successful delivery of goods, physical checking and testing<br />

shall be performed by the <strong>Nepal</strong> <strong>Telecom</strong>'s technical team within thirty (30)<br />

days to confirm that the delivered goods meet the technical specification as<br />

per Section X: Technical Specifications of tender document and meet the<br />

number of quantity as per Section VI: Schedule Of Requirements of tender<br />

document and issue the Delivery Completion Certificate (DCC).<br />

5.3 Physical Counting<br />

After successful delivery of goods, physical counting and checking will be<br />

performed by the <strong>Nepal</strong> <strong>Telecom</strong>'s physical verification team within fifteen<br />

(15) days to confirm that the delivered goods meet the number of quantity as<br />

per Section VI: Schedule Of Requirements and Section VII Schedule of<br />

Price.<br />

<strong>Nepal</strong> <strong>Telecom</strong> shall issue Lot wise Delivery completion Certificate, within<br />

30 days against, all the materials delivered for mentioned sites according to<br />

Packing List/Bill of quantity without any major deficiency.<br />

In case of non delivery of the minor hardware, <strong>Nepal</strong> <strong>Telecom</strong> shall issue the<br />

DCC mentioning list of the minor non delivered equipment and payment shall<br />

be made by deducting the price of the minor non delivered equipment. Please<br />

also refer to Clause <strong>No</strong>. 5.2.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 20 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirement.<br />

5.4 The Supplier shall arrange for Pre-Shipment Inspection by the internationally<br />

recognized surveyor, certifying/confirming the goods, their quantity and<br />

weight, prior to the packaging and loading in the container in case of<br />

containerized cargo or at the port of loading in case of break bulk cargo as per<br />

the shipping document (or commercial invoice) in accordance to the <strong>Nepal</strong><br />

<strong>Telecom</strong> contract document.<br />

The Supplier shall provide the detailed information related to the proposed<br />

Surveyor prior to opening of letter of credit.<br />

5.5 The Supplier shall use the conference vessels or liner vessels for the shipment<br />

of the goods.<br />

5.6 The Supplier shall engage bank listed/approved transporter and duly endorsed<br />

by the bank listed in Clause <strong>No</strong>. – 4 of Section II: Invitation for Bids (IFB) of<br />

tender document for the Inland transportation.<br />

6 Warranty<br />

6.1 The warranty shall remain valid for a period of twelve (12) months from<br />

the date of delivery completion.<br />

6.2 The <strong>Nepal</strong> <strong>Telecom</strong> shall promptly notify the Supplier in writing of any<br />

claims arising under this warranty.<br />

6.3 Upon receipt of such notice, the Supplier shall, with all reasonable speed,<br />

repair or replace the defective goods or parts thereof (as applicable),<br />

without any costs to the <strong>Nepal</strong> <strong>Telecom</strong> within sixty (60) days of receiving<br />

such notice.<br />

6.4 If the Supplier, having been notified of the claim, fails to remedy the<br />

defects(s) within a reasonable period, the <strong>Nepal</strong> <strong>Telecom</strong> shall take<br />

remedial action as may be necessary, at the supplier's risk and expense and<br />

without prejudice to any other rights which the <strong>Nepal</strong> <strong>Telecom</strong> may have<br />

against the supplier under the contract.<br />

6.5 During the delivery and testing, if some of the items found missing, shortsupplied<br />

or damaged, the Supplier shall supply / replace these items<br />

without any cost to the <strong>Nepal</strong> <strong>Telecom</strong>, and all the costs including customs<br />

and other local taxes shall be borne by the Supplier.<br />

6.6 During the warranty period, the supplier shall make goods (or replace with<br />

new items if applicable) all defects in the equipment (hardware and<br />

software, as applicable) as specified by the <strong>Nepal</strong> <strong>Telecom</strong>, with all<br />

reasonable speed and at no additional cost to <strong>Nepal</strong> <strong>Telecom</strong>.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

The cost of material, freight, insurance and any other duties and costs<br />

during the warranty period such as expert visit to <strong>Nepal</strong> site, cost of both<br />

way freight for repair of faulty component/system, custom duty for<br />

importation of repaired item or replacement item etc. shall be borne by the<br />

Supplier.<br />

The supplier shall provide expert staff onsite in <strong>Nepal</strong> as may be required<br />

during the warranty period to remedy any deficiency that may develop.<br />

Until the completion of the warranty period, the supplier shall at all times<br />

and under all conditions be entirely responsible for the satisfactory<br />

performance of the system.<br />

6.7 Warranty Completion Certificate (WCC)<br />

The warranty completion certificate (WCC) shall be issued only after<br />

successful completion of the warranty period.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 21 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>`s Requirements<br />

7 Payment<br />

7.1 100% payment of the foreign currency component for the goods and services<br />

shall be made through Irrevocable Letter of Credit (L/C) for the foreign<br />

currency component. The L/C for the amount of the Goods and Software only<br />

will be opened first. The amount for the service portion (if any) will be added<br />

afterwards by amending the original L/C.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

All payment under this contract shall be made only after deduction of<br />

withholding tax (TDS – Tax Deduction at Source) as per the Income tax law of<br />

Government of <strong>Nepal</strong> applicable at the time of the payment.<br />

<strong>Nepal</strong> <strong>Telecom</strong> shall open irrevocable L/C within fifteen (15) days from the<br />

date of signing the Contract, provided error free pro-forma invoice has been<br />

received within seven (7) days. Delay in submission of the correct pro-forma<br />

invoice may result in delay in opening of letter of credit which ultimately may<br />

delay the implementation of the system and shall attract liquidated damage.<br />

The Supplier shall provide separate pro-forma invoices for the goods and<br />

services. The breakdown costs of the freight and insurance along with the costs<br />

of goods to be delivered shall be clearly mentioned in the commercial invoice.<br />

7.2 Payment for goods:<br />

7.2.1 Advance Payment:<br />

Ten percent (10%) of the Contract price of the Goods only will be paid through<br />

Letter of Credit against submission of Advance Payment Guarantee as per<br />

Sample Form <strong>No</strong>. 5 for the equivalent amount by the Supplier to the NEPAL<br />

TELECOM. The validity of such bank guarantee shall be 12 months from its<br />

issuance date.<br />

7.2.2 On issuance of Delivery Completion Certificate:<br />

Eighty percent (80%) payment of the Price of the goods (equipment/software)<br />

shall be paid through Irrevocable Letter of Credit (L/C) open in favor of the<br />

Supplier in a bank in its country, after complete successful delivery of the<br />

goods to <strong>Nepal</strong> <strong>Telecom</strong>'s respective store within thirty (30) days from the<br />

date of issuance of Delivery Completion Certificate (DCC) as per clause no.<br />

5 of this section and submission of claim along with all documents as per<br />

clause 16.1 of this section.<br />

7.2.3 On the issuance of Warranty Completion Certificate (WCC)<br />

Ten percent (10%) payments of the Total Contract Price of the goods shall be<br />

made through irrevocable letter of credit (L/C) within thirty (30) days from the<br />

date issuance of the Warranty Completion Certificate (WCC) by the <strong>Nepal</strong><br />

<strong>Telecom</strong> and submission of the claim to release the twenty percent payment by<br />

Supplier.<br />

7.2.4 The final LME rate will be fixed as on the thirtieth (30th) day from the date of<br />

signing of contract as per section VII: Adjustment of unit price of copper cables<br />

for variation in price of copper. The value of contract price depends upon the<br />

LME rate which will be provided by supplier. The final LME rate shall be<br />

adjusted on 100% total contract price of goods and the payment to the supplier<br />

shall be adjusted accordingly on each installment as per clause <strong>No</strong>. -7.1 of section<br />

IV: COC. The actual date of LME shall be informed to supplier by <strong>Nepal</strong><br />

<strong>Telecom</strong>.<br />

7.3 Payment for Services<br />

7.3.1 In-Plant Test (Factory Inspection)<br />

100% payment of the In-plant Test shall be made through irrevocable L/C<br />

upon claim along with invoice and completion certificate presented by the<br />

Supplier after the successful completion of the In-plant Test. <strong>Nepal</strong> <strong>Telecom</strong><br />

will certify such claim within thirty (30) days of submission.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 22 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>`s Requirements<br />

7.3.2 Training<br />

100% payment of the training shall be made through irrevocable L/C upon<br />

claim along with invoice and completion certificate presented by the Supplier<br />

after the successful completion of the training. <strong>Nepal</strong> <strong>Telecom</strong> will certify such<br />

claim within thirty (30) days of submission.<br />

7.4 Payment for Local Currency Portion (if applicable)<br />

a) Payment of Inland Transportation:<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

100% Payment for local currency incurred in inland transportation of the<br />

goods in <strong>Nepal</strong> shall be made to the Supplier within Thirty (30) days upon<br />

a claim after the satisfactory receipt of all the goods at respective sites.<br />

b) Payment of the goods and services with country of origin <strong>Nepal</strong>:<br />

Payment for the Goods with Country of Origin <strong>Nepal</strong> shall be made in<br />

local currency. Payment shall be made against the issuance of Delivery<br />

Completion Certificate (DCC). The exchange rate applicable for<br />

conversation (if required) shall be as per the exchange rate of the Bid<br />

Opening Date.<br />

The Supplier may authorize its Local Agent/ any other supplier to receive the<br />

payment of <strong>Nepal</strong>ese Currency portion. The Bidder or authorized Local<br />

agent/any other supplier must submit Tax Invoice with VAT number.<br />

7.5 L/C Amendment and Effective Date<br />

In case the L/C has to be amended due to reasons attributable to the Supplier,<br />

the effective date of L/C will be the date on which L/C was originally<br />

established.<br />

If the L/C has to be amended due to reasons attributable to <strong>Nepal</strong> <strong>Telecom</strong>, the<br />

effective date of L/C will be the date on which L/C is amended.<br />

All the charges for L/C payable outside <strong>Nepal</strong> shall be borne by the Supplier.<br />

In case L/C amendment is requested by the Supplier for the reasons<br />

attributable to the Supplier, all bank charges for such amendment<br />

(reconfirmation charge, negotiation charge etc.) inside and outside <strong>Nepal</strong> shall<br />

be borne by the Supplier.<br />

8 Contract Amendments<br />

<strong>No</strong> variation in or modification of the terms of the Contract shall be made<br />

except by written amendment signed by the both parties.<br />

9 Assignment<br />

The Supplier shall not assign, in whole or in part, its obligations to another<br />

party to perform under this Contract, except with the <strong>Nepal</strong> <strong>Telecom</strong>'s prior<br />

written consent.<br />

10 Applicable Law<br />

The Contract shall be governed and interpreted in accordance with prevailing<br />

laws of <strong>Nepal</strong> Government.<br />

11 Taxes and Duties<br />

11.1 The Supplier shall be entirely responsible for all taxes/duties stamp duties,<br />

license fees and other such levies imposed outside <strong>Nepal</strong>. The taxes/ duties<br />

such as custom duties, VAT, local development tax, security tax etc. applicable<br />

at the time of importation of goods in <strong>Nepal</strong>, for the value not exceeding the<br />

total contract price will be borne by the <strong>Nepal</strong> <strong>Telecom</strong>.<br />

However, it will be the Supplier's responsibility to pay Taxes/duties as<br />

mentioned above for the amount increased beyond the total contract price.<br />

_____________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 23 of 63


Clause<br />

<strong>No</strong>.<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>`s Requirements<br />

11.2 This prices of goods /services with country of origin <strong>Nepal</strong> or quoted in<br />

<strong>Nepal</strong>ese Rupees, shall be inclusive of taxes/duties such as VAT, Local<br />

Development Tax, Custom Duties, and Security Tax etc. applicable in <strong>Nepal</strong>.<br />

11.3 The Supplier shall be responsible to pay withholding Tax (TDS-Tax Deducted<br />

at Source) as per the income tax law of Government of <strong>Nepal</strong> applicable at the<br />

time of payment.<br />

11.4 Taxes and deduction of Payment<br />

All the payment under this contract shall be made only after deduction of<br />

withholding tax amount (TDS- Tax deducted at Source) in accordance with the<br />

Clause <strong>No</strong>. – 11.2 of Section IV: Conditions of Contract (COC).<br />

Liquidated damages, short fall of goods and any other charges payable to the<br />

<strong>Nepal</strong> <strong>Telecom</strong> shall be deducted at the time of the payment.<br />

12 Liquidated Damages<br />

12.1 If the Supplier fails to complete the delivery within the time period specified in<br />

the contract as per Clause no. 5 of this section, the <strong>Nepal</strong> <strong>Telecom</strong> shall,<br />

without prejudice to its other remedies under the Contract, deduct from the<br />

Total Contract Price payable to the Contractor, as liquidated damages, a sum<br />

equivalent to 0.5% percent of the Contract Price of the goods and services,<br />

which could not be delivered/commissioned, for each week of delay until<br />

actual delivery/commissioning or up to a maximum deduction of 10% of the<br />

Total Contract Price. Once the maximum is reached, <strong>Nepal</strong> <strong>Telecom</strong> may<br />

consider termination of the Contract.<br />

The Liquidity damage clause is imposed for the timely delivery of the<br />

goods/services. The calculation of LQD shall be done in weekly basis and for<br />

this purpose one week shall constitute seven days or less (i.e. even a delay of<br />

one day will be considered as a delay by one week).<br />

13 Force Majeure<br />

13.1 The Supplier shall not be liable for forfeiture of its Performance Security,<br />

liquidated damages or termination for default, if and to the extent that, it's<br />

delay in performance or other failure to perform its obligations under the<br />

contract is the result of an event of Force Majeure.<br />

13.2 For purposes of this clause, "Force Majeure" means an event beyond the<br />

control of the Supplier or Purchaser and not involving the Supplier's or<br />

Purchaser's fault or negligence. Such events may include, but are not restricted<br />

to, acts to the <strong>Nepal</strong> <strong>Telecom</strong> either in its sovereign or contractual capacity,<br />

wars or revolutions, fires, floods, epidemics, quarantine restrictions and freight<br />

embargoes.<br />

13.3 If a Force Majeure situation arises, the Supplier shall promptly notify the<br />

<strong>Nepal</strong> <strong>Telecom</strong> in writing of such condition and the cause thereof. Unless<br />

otherwise directed by the <strong>Nepal</strong> <strong>Telecom</strong> in writing, the Supplier shall<br />

continue to perform its obligations under the Contract as far as is reasonably<br />

practical, and shall seek all reasonable alternative means for performance not<br />

prevented by the Force Majeure event.<br />

14 Insurance<br />

14.1 The goods supplied under the Contract shall be fully insured in a currency of<br />

Contract against any loss or damage incidental to manufacture or acquisition,<br />

transportation, storage and delivery in the manner specified in the Clause <strong>No</strong>. -<br />

14.3 of this section.<br />

14.2 The insurance policy shall be issued by the Internationally recognized or<br />

insurance company incorporated in <strong>Nepal</strong>. Name of the Insurance company<br />

and claim procedure shall be finalized during the contract negotiation.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 24 of 63


Clause<br />

<strong>No</strong>.<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>`s Requirements<br />

14.3 The insurance shall be in an amount equal to 110 % of the CIF value of the<br />

goods from "warehouse to warehouse" on "all risks" basis (as per Institute<br />

Cargo Clauses – A) including risks of theft, pilferage, non delivery (TPND),<br />

strike, riots, civil commotion (SRCC) and war clauses. All the items shall be<br />

fully insured by the Supplier up to the final destinations.<br />

14.4 The insurance policy shall remain valid till sixty (60) days after the delivery of<br />

all the goods at the <strong>Nepal</strong> <strong>Telecom</strong>'s respective stores.<br />

14.5 Any item/part damage/ lost shall be replaced by the Supplier free of charge at<br />

first and the insurance claim shall be made by the Consignee or the person<br />

authorized by the consignee to recover the cost of damaged/ lost goods.<br />

15 Patent Rights<br />

The Supplier shall indemnify the <strong>Nepal</strong> <strong>Telecom</strong> against all third - party claims<br />

of infringement of patent, trademark or industrial design rights arising from<br />

use of the goods (equipment and software) or any part thereof in <strong>Nepal</strong>.<br />

16 Documents<br />

16.1 Upon shipment, the Supplier shall notify the <strong>Nepal</strong> <strong>Telecom</strong> and the Insurance<br />

company by fax and email the full details of the shipment including contract<br />

number, description of goods, quantity, the airway bill/ bill of lading, or truck<br />

receipt number and date, port of loading, date of shipment, port of discharge,<br />

L/C number etc. The Supplier shall send by courier service a copy of following<br />

documents to the <strong>Nepal</strong> <strong>Telecom</strong> with a copy to the Insurance company:<br />

i. Five (5) copies of the Supplier's invoices showing goods description,<br />

quantity, unit price, total amount and L/C number.<br />

ii. Original and four (4) copies of the negotiable clean airway bill, bill of<br />

lading, or truck receipt marked freight prepaid and four (4) copies of<br />

non-negotiable airway bill/ bill of lading or truck receipt with LC<br />

number.<br />

iii. Five (5) copies of packing list identifying contents of each package;<br />

iv. Insurance Certificate;<br />

v. Manufacture’s /Supplier’s guarantee certificate;<br />

vi. Certificate of origin issued by Chamber of Commerce<br />

vii. Manufacturer's factory test report<br />

viii. Inspection certificate issued by the Manager of Material Management<br />

Department (MMD), <strong>Nepal</strong> <strong>Telecom</strong> as per the Inspection Report<br />

submitted by <strong>Nepal</strong> <strong>Telecom</strong> Inspector.<br />

ix. Pre-Shipment Inspection Certificate issued by the recognized<br />

International Surveyor.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

However, the requirement of the certificate and name of the international<br />

surveyor will be finalized during contract negotiation.<br />

16.2 A set of above mentioned non-negotiable documents shall be received by the<br />

<strong>Nepal</strong> <strong>Telecom</strong> within seven (7) days from the date of dispatch of goods and if<br />

not received, the supplier shall be responsible for any consequential expenses<br />

and effects.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 25 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>`s Requirements<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

17 Inspection and Test<br />

17.1 The inspection and testing of the goods shall be conducted by the <strong>Nepal</strong><br />

<strong>Telecom</strong> Inspector (technical personnel) at the manufacturer’s site at the<br />

manufacturing stage in accordance with the manufacturer's standard inspection<br />

and acceptance test procedures as mutually agreed before the signing of the<br />

contract. The delivery of the goods shall be accepted only after receiving their<br />

inspection report certifying the quantity of goods.<br />

17.2 <strong>Nepal</strong> <strong>Telecom</strong> shall depute two (2) inspectors (technical personnel) for the inplant<br />

acceptance test (factory inspection) of the goods for a period of seven (7)<br />

working days (excluding traveling time) on the Supplier's invitation. The<br />

Supplier/ Contractor shall notify the <strong>Nepal</strong> <strong>Telecom</strong>, the starting date of the<br />

inspection by the <strong>Nepal</strong> <strong>Telecom</strong> Inspectors at least one (1) month prior to the<br />

shipment.<br />

17.3 The <strong>Nepal</strong> <strong>Telecom</strong>’s right to inspect, test and where necessary, reject the<br />

goods after the goods arrival in <strong>Nepal</strong> shall in no way be limited or waived by<br />

reason of the goods having previously been inspected, tested and passed by the<br />

<strong>Nepal</strong> <strong>Telecom</strong> or its representative prior to the goods’ shipment from the<br />

country of origin.<br />

17.4 The Supplier shall provide all the necessary test equipment, tools and help to<br />

test the goods without any cost to the <strong>Nepal</strong> <strong>Telecom</strong>. Any non-compliance<br />

found during the testing shall be corrected by the Supplier before the shipment.<br />

17.5 The Supplier shall provide the round trip air ticket, accommodation, local<br />

transport, medical insurance and any other applicable charges for the <strong>Nepal</strong><br />

<strong>Telecom</strong>’s Inspector. However, per diem allowance for the <strong>Nepal</strong> <strong>Telecom</strong>’s<br />

inspector shall be arranged by the <strong>Nepal</strong> <strong>Telecom</strong>.<br />

18 Training<br />

<strong>No</strong>t Applicable<br />

19 Additional Order<br />

<strong>Nepal</strong> <strong>Telecom</strong> shall have the right to order additional goods and services up to<br />

twenty percent (20%) of the total contract price during the contract validity<br />

period i.e. until expiry of warranty. The unit prices for additional orders shall<br />

not exceed the contract unit prices.<br />

20 Termination of Contract<br />

20.1.0 Terminations for Default<br />

<strong>Nepal</strong> <strong>Telecom</strong> may, without prejudice to any other remedy for the breach of<br />

contract, by written notice of default sent to Supplier, terminate this contract in<br />

whole or in part:<br />

(a) If the bidder fails to sign an agreement<br />

(b) If the supplier fails to deliver any or all of the Goods within the time<br />

period (s) specified in the Contract, or any extension thereof granted by<br />

the purchaser.<br />

(c) If the Supplier fails to perform any other contractual obligation (s) under<br />

the contract;<br />

(d) If the Supplier, in either of the above circumstances, does not cure its<br />

failure within a period of thirty (30) days (or such longer period as the<br />

Purchase may authorize in writing) after the receipt of the default notice<br />

from the Purchaser.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 26 of 63


Clause<br />

<strong>No</strong>.<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>`s Requirements<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

(e) If it is proved that the Contractor has committed substantial defect in<br />

implementation of the contract or has not substantially fulfilled his<br />

obligations under the contract or the completed work is not of the<br />

specified quality as per the contract ,<br />

(f) If convicted by a court of law in a criminal offence which disqualifies the<br />

bidder from participating in the contract.<br />

(g) If it is proved that the contract agreement signed by the bidder was based<br />

on false or misrepresentation of bidder’s qualification information,<br />

Other acts mentioned in the Bidding documents.<br />

20.1.1 After this, necessary action will be carried out to black list the Supplier and the<br />

notice of black listed shall be circulated to all departments of <strong>Nepal</strong> <strong>Telecom</strong>.<br />

The Supplier who has been black listed shall not be eligible to participate in<br />

any tender and sealed quotations of the <strong>Nepal</strong> <strong>Telecom</strong>.<br />

20.1.2 <strong>Nepal</strong> <strong>Telecom</strong> shall also forward the necessary paper to the Public<br />

Procurement Monitoring Office (PPMO) to black-list the Contractor. Without<br />

prejudice to any other rights of the Purchaser under this Contract, the PPMO<br />

may blacklist a Bidder for his conduct up to three years.<br />

20.2 Terminations for Convenience<br />

<strong>Nepal</strong> <strong>Telecom</strong>, by written notice sent to the Supplier, may terminate the<br />

Contract, in whole or in part, at any time for its convenience. The notice of<br />

termination shall specify that termination is for the Purchaser’s convenience,<br />

the extent to which performance of the Supplier under the Contract is<br />

terminated, and the date upon which such termination becomes effective.<br />

The Goods that are complete and ready for shipment within seven (7) days<br />

after the Supplier’s receipt of notice of termination shall be accepted by the<br />

Purchaser at the Contract terms and prices. For the remaining Goods, the<br />

Purchaser may elect:<br />

to have any portion completed and delivered at the Contract terms and prices;<br />

and/or<br />

to cancel the remainder and pay to the Supplier an agreed amount for partially<br />

completed Goods and Services and for materials and parts previously procured<br />

by the Supplier.<br />

20.3 Termination for Insolvency<br />

<strong>Nepal</strong> <strong>Telecom</strong> may at any time terminate the Contract by giving written<br />

notice to the Supplier if the Supplier becomes bankrupt or otherwise insolvent.<br />

In this event, termination will be without compensation to the Supplier,<br />

provided that such termination will not prejudice or affect any right of action<br />

or remedy which has accrued or will accrue thereafter to the <strong>Nepal</strong> <strong>Telecom</strong>.<br />

21 Arbitration<br />

21.1 If any dispute arises between the contracting parties in connection with or<br />

arising out of contract or the execution of the contract, whether the execution<br />

of works after the completion of works and whether before or after the<br />

repudiation or termination of the contract including any disagreement by either<br />

party with any action, inaction certification, the matter shall be settled by<br />

arbitration under United Nation Commission on International and Trade Law<br />

(UNCITRAL) Arbitration Rules.<br />

21.2 Arbitration shall take place in Kathmandu, <strong>Nepal</strong> and shall be conducted in<br />

English Language.<br />

21.3 The Arbitral Tribunal shall consists of three arbitrators appointed as follows:<br />

(a) Each contracting parties shall appoint only one arbitrator from their sides<br />

(b) The third arbitrator shall be appointed by agreement of the above<br />

mentioned two arbitrators.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 27 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>`s Requirements<br />

22 IP Indemnification:<br />

Unless otherwise agreed upon in writing between the parties, the Supplier shall<br />

provide Goods free from any infringement of third party’s intellectual property<br />

right or copyright, including but not limited to patents, trade secrets<br />

(hereinafter called "Intellectual Property Rights") in the country of the place of<br />

destination. In the event a third party asserts legitimate claims against the NT<br />

based on an infringement of an Intellectual Property Rights with respect to the<br />

Goods provided by Supplier and then used in compliance with this Contract,<br />

the Supplier shall be liable to the Purchaser (NT) as follows:<br />

The Supplier shall at his own option and expenses either acquire the legal right<br />

to use the Goods, modify the Goods so as not to infringe the Intellectual<br />

Property Rights or replace the relevant Goods. If Supplier fails to correct the<br />

infringement, the Purchaser (NT) is entitled to terminate the Contract in whole<br />

or in part. In the event the purchaser terminates the contract in part the<br />

purchaser may procure goods and services similar to those required goods and<br />

the supplier shall be liable to the Purchaser for any excess cost for such similar<br />

goods and services. In such a case Supplier shall compensate the revenue loss<br />

incurred during the period of interruption. However the supplier shall continue<br />

the performance of the contract to the extent not terminated. In case of<br />

complete termination of Contract, supplier shall refund Purchaser (NT) the<br />

Contract Price and one year revenue loss or interruption period whichever is<br />

longer calculated as per <strong>Nepal</strong> <strong>Telecom</strong>’s calculation.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

b) Supplier's aforesaid obligations shall apply only if the Purchaser (NT)<br />

has notified the Supplier in writing of the claims asserted by the third party.<br />

23 Country of Origin, Make and Model of the offered Goods<br />

Bidder shall not deviate from the Country of Origin, Model Number, Part<br />

Number and Manufacturing <strong>Company</strong>, Country of Shipment mentioned in the<br />

Section VII: Price Schedule (SOP) until and unless manufacturer discontinues<br />

the manufacturing of the equipment or the equipment is upgraded to higher<br />

version. Supplier shall submit sufficient documents that prove the<br />

manufacturing of the good is discontinued or good is upgraded to higher<br />

version. <strong>Nepal</strong> <strong>Telecom</strong> reserves right to accept or reject the deviation.<br />

24 <strong>Nepal</strong> <strong>Telecom</strong>’s right to Reject or Accept Lots under Phases<br />

<strong>No</strong>t Applicable<br />

25 Confidentiality<br />

Supplier shall not disclose to third parties, and shall use their best efforts to<br />

ensure that their employees keep secret, all the proprietary information<br />

obtained directly or indirectly by the Supplier, including without limitation,<br />

documents or improvements or design, processes, know-how and other<br />

unpublished information, except as may be authorized in writing by <strong>Nepal</strong><br />

<strong>Telecom</strong>.<br />

26 Contingency amount<br />

Ten Percent (10 %) of total Contract Price shall be provisioned for contingency<br />

fund. The Contingency fund shall be used to procure the goods and services<br />

not covered in the scope of this Contract but required for the unexpected upgradation<br />

(not covered in the Contract) of the system in course of operation.<br />

The contingency fund shall also be used for the Bonus scheme and the<br />

extension of the Pre-Warranty and Warranty service due to reasons attributable<br />

to <strong>Nepal</strong> <strong>Telecom</strong>.<br />

End of Section IV: Conditions of Contract (COC)<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 28 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section V: Sample Forms<br />

Bid Form<br />

Sample Form <strong>No</strong>. - 1 Date : _____, 2010<br />

<strong>Tender</strong> <strong>No</strong>: NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables.<br />

To:<br />

<strong>Nepal</strong> <strong>Telecom</strong><br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong>,<br />

Material Management Department,<br />

Central Office, <strong>Doorsanchar</strong> Bhawan,<br />

Bhadrakali Plaza, Kathmandu,<br />

NEPAL .<br />

Gentlemen:<br />

Having examined the bidding documents including addenda <strong>No</strong>s.: ------------(Insert number), the receipt of which is<br />

hereby duly acknowledged, we, the undersigned, offer to Supply and Delivery of Underground Duct Cables in<br />

conformity with the said Bidding Documents for the sum of ------------------- (Specify bid price in figure and words)and<br />

Inland transportation in NRs. (if applicable) ------------------ (Specify bid price in figure and words) or such other sums as<br />

may be ascertained in accordance with the Schedule of Prices attached herewith and made part of this bid.<br />

We undertake, if our bid is accepted, to complete delivery of all the items specified in the Contract within -----(specify<br />

days) days calculated from the date of signing of the Contract.<br />

If our bid is accepted we will obtain the guarantee of a Bank in a sum equivalent to Ten (10) % of the Contract Sum for<br />

the due Performance of the Contract.<br />

Commission and gratuities, if any, paid to or to be paid by us to agents-relating to this Bid, and to contract execution if we<br />

are awarded the Contract, are listed below :<br />

Name and Address of Local Agent Amount & Currency Purpose of Commission Gratuities<br />

____________________ ______________ ______________<br />

(if none, state “none”)<br />

Our bid is valid up to<br />

expiration of this validity.<br />

, 2011 and it shall remain binding upon us and may be accepted at any time before the<br />

Until a formal contract is prepared and executed, this bid, together with your written acceptance thereof in your<br />

notification of award shall constitute a binding contract between us.<br />

We understand that you are not bound to accept the lowest or any bid you may receive.<br />

Dated: ----------------(Specify date)<br />

Signature : ______________ Signature : ______________<br />

Name : ______________ Name : ______________<br />

Designation : ______________ Designation : ______________<br />

(Witness)<br />

Duly Authorised to sign<br />

Address : ______________ bid for and on behalf of<br />

Official Seal : ______________ (In the Capacity of),<br />

Official Seal : ______________<br />

_________________________________________________________________________________________________<br />

<strong>No</strong>te :<br />

This Bid Form shall be duly filled, signed, dated and stamped with official seal. Bid Form not duly filled and without<br />

signature, date and official stamp shall be rejected and will not be considered for evaluation.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 29 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Sample Form <strong>No</strong>. - 2<br />

Section V: Sample Forms<br />

Bid Security Form<br />

Whereas --------(name of the Bidder) [ hereinafter called "the Bidder"] has submitted its Bid dated -----(date of<br />

submission of bid) for tender <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

(hereinafter called "the Bid").<br />

KNOW ALL PEOPLE by these presents that WE,---------(Name of Bank) of <strong>Nepal</strong>, having our registered office at ---<br />

----(Address of Bank) [hereinafter called "the Bank"], are bound unto <strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

[hereinafter called "the Purchaser"] in the sum of ------(currency and amount) for which payment well and truly to<br />

be made to the said Purchaser, the Bank binds itself, its successors, and assigns by these presents. Sealed with the<br />

common seal of the said Bank this--------(specify date).<br />

THE CONDITIONS of this obligation are:<br />

1. If the Bidder withdraws its Bid during the period of Bid validity specified by the Bidder on the Bid Form;<br />

OR<br />

2. If the Bidder, having been notified of the acceptance of its Bid by the Purchaser during the period of Bid validity:<br />

(a) Fails or refuses to sign the Contract agreement within stipulated time, or<br />

(b) Fails or refuses to furnish the Performance Security, in accordance with the clause <strong>No</strong>. - 4 of Section IV:<br />

Conditions of Contract (COC),<br />

We undertake to pay to the Purchaser up to the above amount upon receipt of its first written demand, without the<br />

Purchaser having to substantiate its demand, provided that in its demand the Purchaser will note that the amount<br />

claimed by it is due to its owing to the occurrence of one or both of the two conditions, specifying the occurred<br />

condition or conditions.<br />

This guarantee will remain in force up to<br />

later than the above date.<br />

, 2011 and any demand in respect there of shall reach the Bank not<br />

________________________________<br />

[Signature and Official Seal of the Bank]<br />

<strong>No</strong>te:<br />

1. The list of banks located in <strong>Nepal</strong> as per Annex – IV have been short listed and acceptable to <strong>Nepal</strong> <strong>Telecom</strong><br />

for the purpose of Bid security.<br />

2. The Bidder/Manufacture shall furnish the Bid Security as per the format given above.<br />

3. The <strong>Nepal</strong>ese bidder bidding on behalf of Principle Manufacturer/Bidder are requested to modify the first<br />

paragraph of the Bid Security Form as following:<br />

Whereas _________ (Name of the Bidder) bidding on behalf of ____________ (Name of the Principle<br />

Manufacturer/Bidder) has submitted its Bid dated -----(date of submission of bid) for tender <strong>No</strong>. NDCL/xx/066-67<br />

for Supply and Delivery of Underground Duct Cables (hereinafter called "the Bid").<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 30 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section V: Sample Forms<br />

Manufacturer's Authorization Letter<br />

Sample Form <strong>No</strong>. - 3<br />

TO:<br />

<strong>Nepal</strong> <strong>Telecom</strong><br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Material Management Department,<br />

Central Office, <strong>Doorsanchar</strong> Bhawan,<br />

Bhadrakali Plaza,<br />

Kathmandu, <strong>Nepal</strong><br />

WHEREAS ------------------------------------------- (Specify name of the Manufacturer or Producer) who are established<br />

and reputable manufacturers or producers of ---------------------------------------------------------------- (Specify name<br />

and/or description of goods) having factories at ------- (Specify Address of Factory or Producing House)<br />

Do hereby authorise -------------------------------(Specify Name and Address of Bidder/Agent) to submit a Bid, and<br />

subsequently negotiate and sign the Contract with you against Invitation for bids (IFB) <strong>No</strong>. NDCL/01/067-68 for<br />

Supply and Delivery of Underground Duct Cables for the above goods manufactured by us.<br />

We hereby extend our full guarantee and warranty for the Goods offered for supply by the above firm against this<br />

Invitation for Bids.<br />

______________________________________<br />

[Signature for and on behalf of Manufacturer or Producer]<br />

[Name] ----------------------<br />

[Designation] ------------------<br />

Date :<br />

_______________________________________________________________________________<br />

<strong>No</strong>te :<br />

The Manufacturer’s Authorization Letter shall be on the letterhead of the manufacturing concern and shall be<br />

signed by a person competent and having the power of attorney to bind the manufacturer.<br />

It is mandatory to submit Manufacturer’s Authorization Letter for the Mobile Diesel Generating Set as per<br />

clause 16 of Section-III, Instruction to Bidders.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 31 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section V: Sample Forms<br />

Performance Security Form<br />

Sample Form <strong>No</strong>. - 4<br />

<strong>Nepal</strong> <strong>Telecom</strong><br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Material Management Department,<br />

Central Office, <strong>Doorsanchar</strong> Bhawan<br />

Bhadrakali Plaza, Kathmandu, <strong>Nepal</strong><br />

WHEREAS ------(name of supplier) [hereinafter called "the Supplier"] has undertaken, in pursuance of Contract<br />

<strong>No</strong>. NDCL/01/067-68 to Supply and Delivery of Underground Duct Cables.<br />

[hereinafter called "the Contract"]<br />

AND WHEREAS it has been stipulated by you in the said Contract that the Supplier shall furnish you with a bank<br />

guarantee by a reputable bank for the sum specified therein as security for compliance with the Supplier's<br />

performance obligations in accordance with the Contract<br />

AND WHEREAS we have agreed to give the Supplier a guarantee:<br />

THEREFORE WE hereby affirm that we are guarantors and responsible to you, on behalf of the Supplier, up to a<br />

total of ------(specify currency and amount of guarantee in figure and words), and we undertake to pay you, upon<br />

your first written demand declaring the Supplier to be in default under the Contract and without cavil or argument,<br />

any sum or sums within the limits of ------(specify currency and amount of guarantee) as aforesaid, without your<br />

needing to prove or to show grounds or reasons for your demand for the sum specified therein.<br />

This guarantee is valid until the ----------------- (Specify Date)<br />

Signature and Official Seal of the Guarantors<br />

[Name] --------------------------<br />

[Designation] --------------------------<br />

[Date]--------------------<br />

[Address]---------------<br />

_______________________________________________________________________________________<br />

The list of banks located in <strong>Nepal</strong> as per Annex – IV have been short listed and acceptable to <strong>Nepal</strong> <strong>Telecom</strong> for the<br />

purpose of Performance Security.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 32 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section V: Sample Forms<br />

Bank Guarantee for Advance Payment<br />

Sample Form: 5<br />

To:<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> Co. Ltd.(<strong>Nepal</strong> <strong>Telecom</strong>),<br />

Material Management Department,<br />

Central Office, <strong>Doorsanchar</strong> Bhawan, Bhadrakali Plaza,<br />

Kathmandu, NEPAL.<br />

[Name of Contract]<br />

Gentlemen and/or Ladies:<br />

In accordance with the payment provision included in the Conditions of Contract to provide for advance payment, ……….<br />

[Name and address of Supplier] (hereinafter called "the Supplier") shall deposit with the Purchaser a Bank Guarantee to<br />

guarantee its proper and faithful performance under the said Conditions of Contract in an amount of ……… [Amount of<br />

guarantee in figures and words].<br />

We, the bank, agree unconditionally and irrevocably to guarantee as primary obligator and not as Surety merely, the payment<br />

to the Purchaser on its first demand without whatsoever right of objection on our part and without its first claim to the<br />

Supplier, in the amount not exceeding ……. [Amount of guarantee in figures and words].<br />

We further agree that no change or addition to or other modification of the terms of the Contract to be performed thereunder<br />

or of any of the Contract documents which may be made between the Purchaser and the Supplier, shall in any way release us<br />

from any liability under this guarantee, and we hereby waive notice of any such change, addition, or modification.<br />

This guarantee shall remain valid and in full effect from the date of the advance payment under the Contract until …. [<br />

Specify date].<br />

Yours truly,<br />

Signature and seal of the Guarantors:________________________________________________<br />

[Name of bank or financial institution]________________________________________________<br />

[Address]___________________________________________<br />

[Date]____________<br />

________________________________________________________________________________<br />

The list of banks located in <strong>Nepal</strong> as per Annex – IV have been short listed & acceptable to <strong>Nepal</strong> <strong>Telecom</strong> for the<br />

purpose of Bank Guarantee for Advance Payment.<br />

End of Section V: Sample Forms<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 33 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section VI :<br />

Schedule of Requirement<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

<strong>Nepal</strong> <strong>Telecom</strong>'s respective stores in Km<br />

SN<br />

Description<br />

Central<br />

Store,<br />

Kathmandu<br />

Regional<br />

Store,<br />

Biratnagar<br />

Regiona<br />

l Store,<br />

Birgunj<br />

Regional<br />

Store,<br />

Bhairahwa<br />

Regional<br />

Store,<br />

Pokhara<br />

Regional<br />

Store,<br />

<strong>Nepal</strong>gunj<br />

Regional<br />

Store,<br />

Dhangadhi<br />

Grand<br />

Total in<br />

Km<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

1800 x 0.4 x 2 0.75 0.75 0.75 0.5 0.25 0.75 0.75 4.50<br />

1500 x 0.4 x 2 0.75 0.75 0.75 0.5 0.25 0.75 0.75 4.50<br />

1200 x 0.4 x 2 1.25 1.25 1.25 0.625 0.625 1.25 1.25 7.50<br />

900 x 0.4 x 2 1.25 1.25 1.25 0.625 0.625 1.25 1.25 7.50<br />

600 x 0.4 x 2 5 5 5 2.5 2.5 5 5 30.00<br />

300 x 0.4 x 2 5 5 5 2.5 2.5 5 5 30.00<br />

200 x 0.4 x 2<br />

2<br />

2 2 1 1 2 1 11.00<br />

<strong>No</strong>te:<br />

The actual delivery of goods shall be finalized during contract negotiation.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 34 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section VII:<br />

Adjustment of Unit Price of Copper Cables for Variation in Price of Copper<br />

(1) This tender is for supply of copper cables of different types (conductor gauge) and sizes (cable pairs). Because of the<br />

large copper content of these cables, the prices of these cables are substantially affected by and dependent on the<br />

price of copper in the world market which can fluctuate significantly between the date of bid submission and the<br />

date of manufacture and the delivery of cables. In order that neither the purchaser nor the selected contractor is<br />

affected adversely or favourably by variations in the price of cables due to fluctuations in the unit price of copper<br />

between the date of submission of bids and the date of delivery, it is necessary that the price quoted by the bidder in<br />

his bid for copper conductor cables is based on the unit price of the copper at about the time of bid submission and<br />

that the price to be paid to the selected contractor for the cables supplied is based on the unit price of copper at about<br />

the time of opening of the letter of credit.<br />

(2) Further, to ensure that all the bidders base their bid price for copper cables on the same unit price of copper, the<br />

following criteria are specified for bidders to quote for the cables and for calculation of payment to the contractor for<br />

cables delivered.<br />

(a) The bid price of cables shall be quoted on the basis of unit price of copper and quoted as follows:<br />

(i) The bid prices shall be quoted for conductor gauge of 0.4 mm and for each size (number of pairs) of cable.<br />

(ii)The bid prices of all cables shall be quoted in the currency of bid in terms of unit price per kilometre of cable.<br />

(iii)The bid price shall be based on the unit price per metric tonne of copper in Pound Sterling quoted on the<br />

London Metal Exchange (LME) on the date thirty (30) days prior to the date of submission of bids; the<br />

currency exchange rate used in quoting the bid price shall be indicated in the bid; and<br />

(iv) For conductor gauge of 0.4 mm cable, the weight of copper in metric tonne for one cable pair per kilometre<br />

shall be indicated in the bid.<br />

(b) In addition, the bidder shall quote the total bid price of the conductor size of 0.4 mm and size (number of pairs) of<br />

copper cable for the respective quantity specified in the schedule of requirements. These total bid prices (after<br />

adjustments for any computation errors) shall be considered in evaluation of bids.<br />

(c) In order that neither the purchaser nor the contractor is affected adversely by the variation in price of cable due to<br />

fluctuations in the unit price of copper between the date of bid submission and the time of delivery, for payments<br />

to the contractor the following formula shall be used to calculate the unit price of cables delivered from the unit<br />

bid price of the cable quoted in the bid.<br />

P C = P b + A<br />

Where,<br />

P C = unit price per kilometre of cable in the currency of bid to be paid at the time of delivery of goods<br />

P b = unit bid price of cable per kilometre of cable in the currency of bid quoted in the bid<br />

N = number of copper pairs in the cable<br />

A = N x W x (C C x E C – C b x Eb)<br />

W = weight of copper in metric tonne per cable pair per kilometre<br />

C b = unit cost of copper per metric tonne in Pound Sterling quoted on the London Metal Exchange (LME) at the<br />

closing time of thirty (30) days prior to the date of submission of bid, which shall be used by all bidders in<br />

quoting their bid prices.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 35 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

C C = unit cost of copper per metric tonne in Pound Sterling quoted on the London Metal Exchange (LME) thirtieth<br />

(30 th ) day from the date of signing of contract. The actual date of LME shall be informed to supplier by the<br />

<strong>Nepal</strong> <strong>Telecom</strong>.<br />

E b = currency exchange rate between Pound Sterling and the currency of bid quoted by the national bank of the<br />

purchaser on a date thirty (30) days prior to the date of submission of bids and expressed as follows:<br />

( ) bid currency<br />

E b =<br />

one pound sterling<br />

EC = currency exchange rate between Pound Sterling and the currency of bid quoted by the national bank of the<br />

purchaser on the date thirtieth (30th) day from the date of signing of contract and expressed as follows:<br />

( ) bid currency<br />

E c =<br />

one pound sterling<br />

The bidders must submit with their bids authenticated document listing the unit price of copper quoted on<br />

London Metal Exchange (LME) thirty (30) days before the date of submission of bid. Failure to submit such<br />

authenticated document with the bid will render the bid non-responsive and liable to disqualification.<br />

<strong>No</strong>te: If the date on which the LME rate for copper has to be quoted is a holiday, the next working day shall be<br />

considered for the purpose of quoting LME rate.<br />

End of section VII : Adjustment of unit price of copper cables<br />

for variation in price of copper<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 36 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section VIII :<br />

Price Schedule and Quantity Thereof for Underground Duct Cables<br />

Name of Bidder:<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01//067-68 for Supply and Delivery of Underground Duct Cables<br />

SN<br />

Description<br />

(with Model <strong>No</strong>.<br />

and Make)<br />

Country of<br />

Origin<br />

Quantity<br />

Unit<br />

1 1800 x 0.4 x 2 4.50 Km<br />

2 1500 x 0.4 x 2 4.50 Km<br />

3 1200 x 0.4 x 2 7.50 Km<br />

4 900 x 0.4 x 2 7.50 Km<br />

5 600 x 0.4 x 2 30.00 Km<br />

6 300 x 0.4 x 2 30.00 Km<br />

7 200 x 0.4 x 2 11.00 Km<br />

8 Inspection 1 Lot<br />

Total<br />

Unit price<br />

FOB port or<br />

specify port of<br />

loading in<br />

US$ or<br />

EURO<br />

Unit<br />

price for<br />

Insurance<br />

in US$ or<br />

EURO<br />

Unit<br />

price for<br />

freight in<br />

US$ or<br />

EURO<br />

Unit<br />

price CIF<br />

<strong>Nepal</strong><br />

Boarder<br />

in US$<br />

or EURO<br />

Unit price<br />

Total price<br />

CIF <strong>Nepal</strong><br />

CIF <strong>Nepal</strong><br />

Boarder in<br />

Boarder in<br />

US$ or<br />

US$ or<br />

EURO in<br />

EURO<br />

words<br />

Unit price<br />

of Inland<br />

delivery to<br />

final<br />

destination<br />

in NRs.<br />

Total price<br />

of Inland<br />

delivery to<br />

final<br />

destination<br />

in NRs<br />

Total price CIF <strong>Nepal</strong> Boarder in US$ or EURO (in figures) : _______________________ _________<br />

(in words) : __________________________________________________________________________<br />

Total price for inland delivery to final destination in NRs. (in figures) : _______________________<br />

(in words) : ____________________________<br />

Signature of the bidder : _________________ Bidder's official seal :<br />

Full Name : ____________________________ Date :<br />

____________________<br />

designation : __________________________<br />

<strong>No</strong>te:<br />

a. In case of discrepancy between unit price and total price, the unit price shall prevail.<br />

b. In case of discrepancy between the amount in words and figures, the amount in words shall prevail.<br />

c. Bidder from <strong>Nepal</strong> shall furnish the price schedule as per Section-III: ITB, Clause <strong>No</strong>. 6.3 indicating custom,<br />

VAT, and other taxes applicable at the entry point.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 37 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section IX :<br />

General<br />

Conditions<br />

for<br />

Technical<br />

Specifications<br />

(NT/00)<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 38 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section IX :<br />

General Conditions for Technical Specifications (NT/00)<br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

1 General<br />

This specification has been framed to be a part of the technical specification<br />

drawn up by <strong>Nepal</strong> <strong>Telecom</strong> unless stated otherwise. Every specification drawn<br />

up by <strong>Nepal</strong> <strong>Telecom</strong> shall make reference to this specification.<br />

1.1 Scope<br />

1.1.1 This specification consists of general conditions or clauses which are common<br />

to almost all the individual technical specifications. Unless stated otherwise in<br />

the individual technical specification of different items, requirements specified<br />

herein must be complied.<br />

1.1.2 Some of the clauses stated under this specification might not be identical to that<br />

of an individual specification or may even be contradictory. In such cases, the<br />

product should comply to the clauses as given in the individual specification.<br />

1.1.3 Where same topic is dealt with in the individual technical specification, the<br />

requirements there are termed as additional clauses.<br />

2 General Requirement<br />

2.1 The tender document offered by bidders should consists of the following<br />

technical documents :<br />

(a) Standard product catalogue for the item being tendered. This catalogue<br />

should clearly indicate the item being offered with various technical and<br />

physical features of the offered item. The model number shown in this<br />

catalogue and the model number mentioned in the price list in the tender<br />

response document should be the same.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

(b) Detailed technical specification of the offered item along with the drawings<br />

of components and subassemblies.<br />

(c) All the information sought for in the invitation to the tender document must<br />

be available in the detailed offer including the technical specification.<br />

(d) A clause-wise statement of compliance giving clause by clause answer to<br />

the <strong>Nepal</strong> <strong>Telecom</strong> technical requirements mentioned in the technical<br />

specification. The statement of compliance shall clearly indicate the extent<br />

of compliance to <strong>Nepal</strong> <strong>Telecom</strong> requirements in its specification. This<br />

becomes extremely important in case the manufacturer does not already<br />

have his own full-fledged specification for his product.<br />

If there are deviations in the offered product from <strong>Nepal</strong> <strong>Telecom</strong>'s<br />

requirements, the same should be clearly high lighted in the compliance<br />

statement, with any explanations or comments, the manufacturers or suppliers<br />

would like to offer.<br />

If the technical requirements of the offered item are not clear from the<br />

documents provided as per this clause, the tender offered will be treated as not<br />

responsive. For example: Statements such as `<strong>No</strong>ted', 'will be met' or 'will be<br />

satisfactory' are not acceptable.<br />

2.2 This specification covers only the general condition governing the supply of<br />

materials but does not include all the provisions of technical specification and<br />

commercial contract.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 39 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

2.3 Test Certificates<br />

The manufacturer or supplier shall, when so required by the <strong>Nepal</strong> <strong>Telecom</strong>,<br />

supply a test certificate giving the results of the chemical, physical and other<br />

tests batch wise indicating that the materials used in the manufacture of the<br />

cable, comply with the requirements of the specification.<br />

2.4 Supply Record<br />

The manufacturer shall also provide supply record of his product to two<br />

telecom administrations where they are in regular service. Implementation of<br />

the product during development and or on test basis may not be accepted.<br />

2.5 Expected Cable Life<br />

The Cable shall be designed for a life expectancy as given in the individual<br />

technical specification for the product, without any serious degradation of the<br />

performance or reliability when maintained in accordance with the contactors<br />

recommendation and when operated in the environmental conditions as stated<br />

in the clause 2.6.<br />

2.6 Performance Conditions<br />

2.6.1 Climatological Conditions of <strong>Nepal</strong><br />

Climatological conditions at major places of <strong>Nepal</strong> are mostly observed to be:-<br />

mean of daily maximum (annual)<br />

= 31.1 degree Celsius<br />

mean of daily maximum in Summer = 38.1 degree Celsius<br />

,, minimum (annual) = 11.4 degree Celsius<br />

,, ,, in Winter = 2.0 degree Celsius<br />

maximum temperature reached<br />

= 43.7 degree Celsius<br />

minimum temperature reached<br />

= - 4.2 degree Celsius<br />

maximum vapour pressure reached = 40.0 mb<br />

2.6.2 The cable shall be capable of maintaining its performance for 24 hours daily<br />

throughout the year under the following climatological conditions.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

(a) Temperature<br />

(b) Humidity<br />

(c) Dust<br />

(d) Altitude<br />

(e) Wind Pressure<br />

: -10 degree C to +55 degree C<br />

: Relative humidity (R.H.) upto 100% within the<br />

temperature range 0 degree to 35 degree<br />

centigrade and upto 75% R.H. at temperature<br />

above 40 degree centigrade.<br />

: With a built-up of dust on operational surfaces to a<br />

level such as may occur because of imperfections<br />

in sealing of cable housing.<br />

: At any altitude upto 5000 m. above sea level.<br />

: The Cable shall be able to withstand the wind<br />

pressure of 110 Kg. f/sq. m.<br />

(f) Ultraviolet Ray : The matersidals of the Cable, their strength and<br />

appearance shall not be affected by ultraviolet ray<br />

exposure.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 40 of 63


Clause<br />

<strong>No</strong>.<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

2.6.3 The cables are classified into following categories depending upon their<br />

environment of use and design.<br />

Category location and exposure conditions of cable<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

(a) Buried or installed in duct pipes and manholes.<br />

(b) Exposed completely to the open environment.<br />

2.6.4 The cable shall be capable of maintaining its performance for 24 hours daily<br />

throughout the year under the following temperature ranges in accordance to<br />

their categories.<br />

Cable type will be indicated in the individual specification.<br />

Guaranteed operational<br />

Cable survival condition<br />

condition<br />

Category<br />

Lowest Highest Lowest Highest<br />

Temperature Temperature Temperature Temperature<br />

E −10 0 C 55 0 C −15 0 C 55 0 C<br />

3 Material and finish<br />

The design, workmanship, material and finish of all the cables shall be free<br />

from defect and shall be capable of functioning perfectly and be able to<br />

withstand the rigours of long service in the climatological condition mentioned<br />

in clause <strong>No</strong>. - 2.6<br />

4 Marking<br />

Each length of Cable shall be marked legibly and indelibly with the<br />

manufacturer's trade mark or the name of manufacturer and year of<br />

manufacture.<br />

End of section IX : General Conditions for Technical Specifications (NT/00)<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 41 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section X :<br />

Technical<br />

Specification<br />

For<br />

Foam Skin type<br />

Polyethylene Insulated<br />

Polyethylene Sheathed<br />

Underground Duct Cables<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 42 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Section X :<br />

Technical Specification for Foam Skin type Polyethylene Insulated Polyethylene Sheathed Underground Duct<br />

Cables<br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

1 General<br />

Multiple pair foam-skin polyethylene insulated copper conductor cables<br />

ranging from 10 to 1800 pairs are used by <strong>Nepal</strong> <strong>Telecom</strong> as underground<br />

cables. These cables are polyethylene sheathed with a poly-Al moisture<br />

barrier and are fully filled with water resistant jelly compound. This<br />

specification covers the technical requirements of underground duct cables.<br />

1.1 Scope<br />

1.1.1* This specification deals with the constructional requirements, and electrical<br />

properties of telecommunication multi pair underground duct cables with<br />

twisted pairs of conductors, fully filled with water resistant compound and<br />

having a bonded poly-Al laminate moisture barrier bonded to the polyethylene<br />

sheath. This is applicable to cables of 10 pairs, upto 1800 pairs. This cable shall<br />

be un-armoured. The cables may be ordered as 10, 20, 30, 50 70, 100, 150, 200,<br />

300, 600, 900, 1200, 1500 and 1800 pair cables. The insulation of conductor<br />

shall be of foam skin type. The maximum no. of pair of cables of 0.4 diameter<br />

conductors shall be 1800 pairs, while for 0.5 mm conductors the number of<br />

pairs shall be limited to 600 pairs.<br />

1.1.2 All requirements stated in the general conditions for technical specification are<br />

integral part of this specification.<br />

1.1.3 This specification covers the technical provision governing the supply of<br />

materials but does not include all the provisions of commercial contract.<br />

1.2* Reference<br />

This specification requires reference to the following standard specification.<br />

(Latest issue)<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

(a) NT/00 - General conditions for <strong>Nepal</strong> <strong>Telecom</strong> specification<br />

(b) BS 6234 : 1987 - Polythene Insulation and sheath of electric cables.<br />

(c) BS 3573-1972-Polyethylene insulated conductor for telecommunication<br />

distribution cable.<br />

1.3* The cable shall be designed for a life expectancy of at least 25 years without<br />

serious degradation of the performance or reliability.<br />

2* Component<br />

2.1* Conductor<br />

2.1.1* Each conductor in the completed cable shall consist of a solid wire of annealed<br />

high conductivity (Grade A) copper which is smoothly drawn, circular in<br />

section, uniform in quality and free from defects.<br />

2.1.2* The diameter, resistance and elongation requirements of the conductor shall be<br />

in accordance with Table 1.<br />

2.1.3* The electrical resistance unbalance shall not exceed the values listed below :<br />

Conductor size<br />

Percentage unbalance<br />

(Diameter) Average Individual<br />

0.40mm 1 2.5<br />

0.50mm 1 2.5<br />

The resistance unbalance between conductors is defined as (R1-R2)/(R1+R2) x<br />

100, where R1 and R2 in ohms are values for the measured values of resistance<br />

of the two conductors of the pair.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 43 of 63


Clause<br />

<strong>No</strong>.<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

2.1.4* Joints in the conductors shall be kept to a minimum and shall be made in such a<br />

manner that the tensile strength of a test piece of conductor, not less than 250<br />

mm long containing a joint shall be not less than 90% of that of an adjacent<br />

length of conductor not containing a joint.<br />

2.2* Insulation<br />

2.2.1* Each conductor shall be insulated with foam skin polyethylene insulation. The<br />

polyethylene used for both the skin and the foam shall be of high density type<br />

having density range of 0.94~0.96 gm/cm 3 . The melt flow index shall be less<br />

than 0.5. The minimum insulation thickness shall not be less than the value<br />

given in Table 1.<br />

2.2.2* The degree of blowing of insulation shall be between 25% to 35%. The cells<br />

produced by the expanding process shall be uniformly distributed<br />

circumferentially and shall be substantially non-intercommunicating.<br />

2.2.3* The colour of insulation shall be readily identifiable under normal lighting<br />

conditions. The grade of pigment used for colouring the polyethylene shall be<br />

such that the coloured insulation meets the specific requirements of Table 2.<br />

2.3* Filling Compound<br />

The cable shall be fully filled with a water resistant compound which is fully<br />

compatible with the foam-skin insulation of the conductor. The compound shall<br />

be stable, shall not harm any cable component e.g. copper, poly-Al laminate<br />

tapes, polyethylene sheath. The compound shall not obscure the identification<br />

colours of the insulated conductors and shall be readily removed from the<br />

insulated conductors by wiping. The compound shall not have any hazardous<br />

effect on personnel jointing or handling the cable. The compatibility between<br />

foam skin insulation and the filling compound shall be established by Type<br />

tests as given in Annexure I.<br />

2.4* Core Wrapping<br />

After application of water resistant compound, at least one close helical or<br />

longitudinal application of non-hygroscopic and non wicking plastic tape shall<br />

be applied over the cable core. The inside and outside of the core wrapping tape<br />

shall be flooded with the compound.<br />

2.5* Moisture Barrier<br />

2.5.1* An aluminium tape coated with polyethylene co-polymer on both sides shall be<br />

longitudinally applied over the cable core. The thickness of aluminium shall be<br />

0.2 mm and polyethylene/co-polymer coating on each side 0.05 mm. The polyal<br />

moisture barrier shall completely cover the cable core with an overlap of not<br />

less than 10 mm for cables having cable core diameter less than or equal to 45<br />

mm.. Similarly the overlap shall not be less than 15mm for cables with cable<br />

core diameter more than 45 mm.<br />

2.5.2* The aluminium tape shall be sealed and bonded to the inner surface of the<br />

polyethylene sheath extended over it. The tape shall be electrically continuous<br />

throughout the length of the cable.<br />

2.5.3* The peel strength of the polyethylene/co-polymer coating to the aluminium<br />

tape shall be as per Annexure - II.<br />

2.6* Sheath<br />

2.6.1* The cable shall be sheathed with polyethylene type 03C in accordance with the<br />

requirements of BS 6234-1987.<br />

2.6.2* The sheath shall be free of pin holes, joints and other defects. It shall be circular<br />

in shape.<br />

2.6.3* The radial thickness of the sheath shall not be less than value given in Table - 4.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 44 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

3* Constructional Requirements<br />

3.1* The plain copper conductor complying with clause <strong>No</strong>. - 2.1 shall be insulated<br />

in accordance with clause <strong>No</strong>. - 2.2, such that the requirements of this<br />

specification are met.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

The colour of the insulation shall be chosen to meet the requirements of Table<br />

2.<br />

3.2* Pairing<br />

Two appropriately coloured insulated conductors Table - 2 shall be uniformly<br />

twisted together under light tension to form a pair. The length of lay shall be<br />

such that the two wires forming a pair shall not dissociate by normal handling.<br />

The various pairs shall be so arranged that the capacitance unbalance as per<br />

clause <strong>No</strong>. - 4.5 is met.<br />

3.3* Stranding<br />

3.3.1* Upto 100 pairs<br />

10 pairs shall be stranded to form a group called a unit. The colour scheme of<br />

the assembly will be as per Table - 2. Each unit shall have a helical lapping of<br />

polyester/ polypropylene/polythene tape of thickness 0.02mm minimum and<br />

width of 3mm. The tapes shall be coloured as per the Table - 3 to identify the<br />

units. The colour of the tape shall be distinguishable under normal lighting<br />

condition. Polythene strings may be used as fillers for circular core formation.<br />

2,3,5,7 and 10 numbers of 10 pair units shall be assembled to form 20, 30,50 70<br />

and 100 pair cable respectively. The numbering of the cable units shall be<br />

clockwise from the running end.<br />

3.3.2* Cables upto 300 pairs<br />

5 units of 10 pair shall be stranded to make a super unit of 50 pair. Each super<br />

unit shall have a suitably coloured lapping of tape as shown in table 3 to<br />

indicate the super unit number e.g. a 300 pair cable shall have 6 super units.<br />

3.3.3* Cables upto 1800 pairs<br />

10 units of 10 pair shall be stranded to make a super unit of 100 pair. Each<br />

super unit shall have a suitably coloured plastic lapping as shown in table 3 to<br />

indicate the super unit number e.g. a 600 pair and an 1800 pair cable shall have<br />

6 and 18 super units respectively .<br />

Alternatively 300 pairs super units as stated in table 3.3.2 shall be stranded to<br />

form the cables of 1200, 1500 and 1800 pairs. Each super unit shall have a<br />

suitable coloured plastic lapping as shown in table 3 to indicate the super unit<br />

number.<br />

3.4* Identification<br />

Following information shall be embossed or printed on the cable sheath at<br />

intervals of 1 m throughout the whole length of the cable to enable the<br />

identification of cable. The embossed or printed marking shall be distinct to<br />

naked eye from a distance of not less than 50 cm.<br />

(i) Size of cable<br />

(ii) Type of insulation<br />

(iii) Progressive length marking<br />

(iv) Year of manufacturing<br />

(v) Manufacturer's name<br />

(vi) <strong>Nepal</strong> <strong>Telecom</strong><br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 45 of 63


Clause<br />

<strong>No</strong>.<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

3.5* Sheath<br />

The cable shall be sheathed with polyethylene in accordance with clause <strong>No</strong>. -<br />

2.6. It shall be circular, free from defects and of thickness in accordance with<br />

Table - 4.<br />

3.6* Sealing and marking ends<br />

After testing, the ends of each length of cable shall be enclosed in securely<br />

attached, tightly fitting caps having wall thickness and overall length of not less<br />

than 2mm and 50 mm respectively.<br />

3.7* Pulling Eye<br />

Cables of 1200, 1500 and 1800 pairs shall be fitted with Pulling Eyes to draw<br />

the cables in duct.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

The Pulling eye shall be constructed in such a way that a force of 2000 Kg can<br />

be applied to it without the pulling eye detaching itself from the cable. The<br />

diameter of pulling eye shall not exceed 90 mm.<br />

4* Electrical Test<br />

4.1* General<br />

Tests on the finished cables shall be made to prove compliance with all<br />

requirements of this specification.<br />

4.2* Conditions of measurement and test<br />

All the measurements shall be carried out at a temperature 20 + 5 degree C.<br />

Before the measurement is done, the test cable shall be stored at the measuring<br />

temperature for a sufficient time to allow the cable to reach this temperature. If<br />

measurement is done at different temperature, the result shall be corrected to 20<br />

degree C.<br />

4.3* Conductor Resistance<br />

4.3.1* The resistance of the conductor shall be in accordance with Table - 1.<br />

4.3.2* All the conductors in the completed cable shall be tested for continuity and<br />

absence of crossed pair.<br />

4.3.3* The cable shall be tested for Resistance unbalance and shall conform to clause<br />

<strong>No</strong>. - 2.1.3.<br />

4.4* Mutual Capacitance<br />

The mutual capacitance shall be measured at 800 Hz. During this measurement,<br />

the screen and all conductors other than those under test shall be connected to<br />

earth. The average mutual capacitance of pairs shall not exceed the value<br />

shown below:<br />

Conductor size<br />

Average mutual capacitance per KM<br />

0.40 mm 50 nF<br />

0.50 mm 50 nF<br />

However, the realization of above value of capacitance with insulation<br />

thickness lower than the value mentioned in table 1 will not be acceptable.<br />

4.5* Capacitance unbalance<br />

4.5.1* Pair to pair capacitance unbalance measured at 800 Hz between adjacent and<br />

alternate pairs in each unit of a super unit or cable shall not exceed the<br />

following limits.<br />

Average (for the super unit) - 50 pF/Km<br />

Individual combination - 275 pF/Km.<br />

4.5.2* Pair to ground capacitance unbalance at 800 Hz shall not exceed the value<br />

shown below:<br />

Average<br />

Individual<br />

- 750 pF/Km.<br />

- 3000 pF/Km.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 46 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

4.5.3* The measurements of capacitance unbalance for length other than 1 Km shall<br />

be corrected as follows :<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

1/2{L/1000 + (L/1000) 1/2 } Where, L is the length of cable under test in meters.<br />

4.6* Insulation resistance<br />

After steady electrification with not less than 500 volts DC for not less than 60<br />

sec., the insulation resistance of each conductor in the cable measured with all<br />

the other conductors and screen connected together shall be not less than 10<br />

Giga ohm for a length of 1000 m at room temperature.<br />

4.7* Dielectric Strength<br />

4.7.1* The insulation between conductors shall be capable of withstanding for 3 sec a<br />

DC potential of 2.4 kV for 0.40 mm and 3.0 kV for 0.50 mm conductor.<br />

4.7.2* The insulation between the shield and conductors in the core shall be capable of<br />

withstanding for 3 sec a DC potential of 10 KV for 0.4 and 0.5 mm conductor.<br />

4.8* Attenuation<br />

The average attenuation of the pairs at 0.8KHz shall not exceed the values<br />

listed below at 20 degree C.<br />

0.40mm<br />

1.65db/km<br />

0.50mm<br />

1.3 db/km<br />

Temperature correction for attenuation will be done by the formula.<br />

Attenuation..<br />

t o C<br />

Attenuation at 20 degree C =<br />

1+ 0.0018.( t − 20)<br />

5* Mechanical Test<br />

5.1* Conductor<br />

5.1.1* Elongation Test<br />

Samples of conductor, when tested as shown below, shall give an elongation<br />

before fracture in accordance with Table - 1.<br />

The elongation test using a nominal gauge length of 250 mm shall be carried<br />

out on a machine such that the load shall be applied gradually and the rate of<br />

separation of the jaws of the testing machine shall be not greater than 100<br />

mm/min and shall be so adjusted that the total time of testing from the moment<br />

of application of the load until fracture is between 15 and 60 sec.<br />

5.1.2* Tensile strength of jointed conductor<br />

The condition of test shall be the same as that applicable to the elongation test<br />

of conductor taken from the finished cable. The requirements shall be as<br />

specified in clause <strong>No</strong>. - 2.1.4<br />

5.2* Insulation<br />

5.2.1* Elongation<br />

A length of insulation carefully removed from the conductor shall be inserted in<br />

a suitable tensile testing machine such that there are 50 + 5 mm between the<br />

grips, when extended at a rate of 250 + 20 mm / minute, the minimum<br />

elongation at break shall be not less than 150%.<br />

5.2.2* Breaking Force<br />

The breaking force of the test piece so tested as in 5.2.1 shall not be less than<br />

1.5 N for insulation of a 0.4 mm conductor and 2.0 N for insulation of 0.5 mm<br />

conductor.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 47 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

5.2.3* Spark Test<br />

The manufacturer shall have continuous record of spark test with at least 1<br />

KVA during production and shall make available these records at the time of<br />

inspection and acceptance of cables. Pin holes are not permitted.<br />

5.2.4* Resistance to compression<br />

Two lengths of insulated conductor shall be uniformly twisted together under<br />

light tension so that there are ten 360 degree twists in a final length of<br />

approximately 100mm. <strong>No</strong>t more than 50 mm in the middle portion of the<br />

twisted pair shall be placed between two flat rigid metal plates coated with<br />

polyethylene on the inside surfaces. The polyethylene coating shall be a film of<br />

a nominal thickness 250 micro meters. A compressive force of not less than 65<br />

N shall be applied to the plates.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

One minute after the application of force, and with the force still applied; there<br />

shall be no electrical contact between the insulated conductors. The tests for<br />

contact shall be made using a DC voltage between 1.5 V and 12 V and a<br />

suitable indicator.<br />

5.2.5* Retraction:<br />

When cut at a point not less than 1 metre from the end, the retraction of the<br />

insulation on the conductor shall not exceed 2.5 mm after 1 minute.<br />

5.3* Sheath<br />

5.3.1* The minimum radial thickness of the sheath measured at any traverse section<br />

shall be in accordance with table - 4.<br />

5.3.2* The test method and the test requirements shall be as per Annexure - II.<br />

6* Tensile force<br />

The cables shall be capable of withstanding tensile force upto the limits<br />

tabulated below:<br />

Maximum tensile force (N)<br />

Number of pairs<br />

6*<br />

10<br />

20<br />

30<br />

50<br />

70<br />

100<br />

Number of pairs<br />

150<br />

200<br />

300<br />

600<br />

900<br />

1200<br />

1500<br />

1800<br />

0.4 mm 0.5 mm<br />

200<br />

300<br />

250<br />

400<br />

320<br />

500<br />

450<br />

700<br />

650<br />

1000<br />

900<br />

1400<br />

Maximum tensile force (N)<br />

0.4 mm 0.5 mm<br />

1300<br />

1700<br />

1700<br />

2200<br />

3250<br />

4750<br />

6250<br />

9250<br />

9250<br />

12250<br />

15250<br />

18250<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 48 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

7* Cable drum information<br />

7.1* The cable shall be coiled on wooden or synthetic drum, the size of which shall<br />

conform to those given in table below. Strong battens shall be fixed on to the<br />

circumference of the flanges of the drum so as to protect cable from damage<br />

during transportation and storage. 1 or 2 layers of card board with total<br />

thickness of 6mm shall cover the cable circumferentially for the further<br />

protection of cable. The manufacturer shall ensure that the battens shall not be<br />

removable except with the use of tools. The minimum barrel (core) diameter D<br />

of each drum shall be given by D = k x d where k, a constant dependent on<br />

cable type, d is the outer cable diameter. For laminated sheath cable k = 15. The<br />

nominal drum dimensions should be as tabulated below:<br />

7.2* The manufacturer shall supply the cable in fixed length in each cable drum for<br />

every size of the cable as desired by <strong>Nepal</strong> <strong>Telecom</strong>. The cable length will be<br />

provided either in the tender document itself or during the signing of the<br />

contract. In case the supplied length in the drum is less than the ordered length,<br />

the drum will either be rejected or the price will be deducted at the rate of twice<br />

the unit price for each shortage metre of the cable. However, <strong>Nepal</strong> <strong>Telecom</strong><br />

will not pay more in case the supplied cable length in the drum is more than the<br />

order length.<br />

Flange Diameter<br />

(mm)<br />

900<br />

Barrel Diameter<br />

(mm)<br />

385<br />

Overall Width of<br />

Drum (mm)<br />

Minimum<br />

Maximum 2200<br />

1400<br />

500<br />

1200<br />

7.3* To assist the manufacturer in judging the total number of drums to be<br />

supplied, following information shall be helpful. However, the requirement<br />

made in para - 7.2 shall be the determining factor.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

Cable Size and Guage<br />

Standard Length (Meter)<br />

(a) 10 pairs to 100 pair cable of 0.4 1000<br />

or 0.5 diameter conductor<br />

(b) 150 pair to 600 pair cable of 0.4 500<br />

or 0.5 diameter conductor.<br />

(c) 900 pair to 1800 pair cable of 0.4 250<br />

diameter conductor.<br />

7.4* It is important that in all cases, only a single length of cable should be<br />

delivered on a cable drum. It is also suggested that the gross weight of the<br />

drum including the single length of cable wound on it shall not exceed 3<br />

Metric ton. The overall width of the drum shall not be more than 1.20 meter.<br />

7.5* Both the ends of the cable on a drum should be accessible for tests and hence<br />

may be embedded in specially made recess on the sides of the drum.<br />

7.6* The running end of the cable shall be provided with a pulling eye as specified<br />

here in, if necessary in such a way as to allow it being pulled. The suppliers<br />

shall also ensure that the ends are properly sealed.<br />

7.7 The manufacturers shall provide the information regarding the overall<br />

diameter and weight per km of the cable being supplied in each case.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 49 of 63


Clause<br />

<strong>No</strong>.<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

7.8 The following information shall be painted on both sides of the drum by<br />

indelible painting. As a part of delivery information, the manufacturers shall<br />

have a patch of colour in a 75 mm strip as shown in the diagram DR-<br />

1/NT/EP/300 to signify a particular regional depot of <strong>Nepal</strong> <strong>Telecom</strong> in<br />

<strong>Nepal</strong>. The colour code information to be painted on the drum is given in table<br />

- 5. Pasting of the notice or attachment of cardboard or sticker is not<br />

permissible.<br />

(a) The Managing Director<br />

<strong>Nepal</strong> <strong>Telecom</strong><br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Ministry of Information and Communications<br />

HMG of <strong>Nepal</strong><br />

(b) Delivery Site : Central/Regional/Site Store Depot<br />

<strong>Nepal</strong> <strong>Telecom</strong><br />

Site Name :<br />

(c) Type and Size of Cable :<br />

(d) First Meter Reading :<br />

Last Meter Reading :<br />

Length of Cable :<br />

(e) <strong>Nepal</strong> <strong>Telecom</strong>'s Drum <strong>No</strong>. :<br />

(f) Exchange Code :<br />

(g) Manufacturer's Drum <strong>No</strong>. :<br />

(h) Manufacturer's Name :<br />

Date of Manufacturer :<br />

(i) <strong>Nepal</strong> <strong>Telecom</strong>'s order <strong>No</strong>. :<br />

(j) Net Weight :<br />

Gross Weight :<br />

(k) Point of Entry :<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

<strong>No</strong>te :<br />

• Delivery site and point of entry details is provided in schedule of<br />

requirements.<br />

• Typical notice on the flange of the cable drum is drawn in the attached<br />

drawing DR-1/NT/EP/300. This will be displayed on the outside of<br />

both flanges of the drum which are visible outside.<br />

End of Section X : Technical Specification for Foam Skin type Polyethylene<br />

Insulated Polyethylene Sheathed Underground Duct Cables<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 50 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Table – 1<br />

Diameter, Resistance and Elongation of the Conductors<br />

Conductor<br />

diameter<br />

(mm.)<br />

Maximum value of<br />

Resistance/ km of cable<br />

conductor at 20 o C in ohms<br />

Minimum thickness of<br />

insulation in mm.<br />

Minimum %<br />

elongation of<br />

conductor<br />

Overall<br />

diameter (mm)<br />

0.40 140 0.20 15 0.8<br />

0.50 90 0.24 15 0.98<br />

End of Table – 1 : Diameter, Resistance and Elongation of the Conductors<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 51 of 63


Table – 2<br />

Colour Code for Conductor Insulation<br />

NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Pair <strong>No</strong>.<br />

Colour<br />

A Wire<br />

B Wire<br />

1 White Blue<br />

2 White Orange<br />

3 White Green<br />

4 White Brown<br />

5 White Grey<br />

6 Red Blue<br />

7 Red Orange<br />

8 Red Green<br />

9 Red Brown<br />

10 Red Grey<br />

End of Table – 2 : Colour Code for Conductor Insulation<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 52 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Table – 3<br />

The Colour Scheme of the tape or binder for identification<br />

Unit <strong>No</strong>./Super unit no. <strong>No</strong>. of Pairs Colour of the tape or binder<br />

1 10/50/100 Blue<br />

2 10/50/100 Orange<br />

3 10/50/100 Green<br />

4 10/50/100 Brown<br />

5 10/50/100 Grey<br />

6 10/50/100 Blue-Red<br />

7 10/50/100 Orange-Red<br />

8 10/50/100 Green-Red<br />

9 10/50/100 Brown-Red<br />

10 10/50/100 Grey-Red<br />

11 10/50/100 Blue-White<br />

12 10/50/100 Orange-White<br />

13 10/50/100 Green-White<br />

14 10/50/100 Brown-white<br />

15 10/50/100 Grey-white<br />

16 10/50/100 Blue-Black<br />

17 10/50/100 Orange-Black<br />

18 10/50/100 Green-Black<br />

End of Table – 3 : The Colour Scheme of the tape or binder for identification<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 53 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Table – 4<br />

Polyethylene Sheath Thickness (Excluding Poly-Al laminate)<br />

Conductor Diameter (m) Number of Pairs Minimum radial thickness of sheath (mm)<br />

0.4 10/20/30 1.2<br />

0.4 50/70 1.4<br />

0.4 100/150 1.5<br />

0.4 200/300/400/600 1.8<br />

0.4 900/1200/1500/ 1800 2.1<br />

0.5 10/20/30 1.4<br />

0.5 50/70/100/150 1.6<br />

0.5 200/300/600 1.9<br />

End of Table – 4 : Polyethylene Sheath Thickness (Excluding Poly-Al laminate)<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 54 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Table – 5<br />

Drum Colour Code for respective <strong>Nepal</strong> <strong>Telecom</strong>`s stores<br />

SN Delivery site (respective <strong>Nepal</strong> <strong>Telecom</strong>`s stores) Colour code<br />

1 Central store, Chhauni, Kathmandu Red<br />

2 Regional store, Biratnagar Blue<br />

3 Regional store, Birgunj, Green<br />

4 Regional store, Bhairahawa Orange<br />

5 Regional store, <strong>Nepal</strong>gunj Chocolate<br />

6 Regional store, Dhangadhi White<br />

End of Table – 5 : Drum Colour Code for Respective <strong>Nepal</strong> <strong>Telecom</strong>`s stores<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 55 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Annexure - I<br />

Type Tests on Polyethylene and Filling Compound and on Completed Cables<br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

1 Test on Compound<br />

1.1 Stability<br />

When held at a temperature of 65 o C + 1 o C for 5 days, the compound shall not<br />

show any separation of the constituents of the filling compound. For this test,<br />

about 5 gms of filling compound is filled in a glass container, with both ends<br />

open and held with the axis of the container in a horizontal plane. The outer<br />

surface of the glass tube is covered with a copper wire mesh to ensure uniform<br />

temperature and prevent local hot spots. The test tube is maintained in a<br />

constant temperature bath at 65 o C + 1 o C for 120 hours and temperature<br />

monitored by a thermometer.<br />

1.2 The compound shall not obscure the identification of colours of insulation of<br />

conductors.<br />

1.3 The compound shall be readily removable from the insulated conductors by<br />

wiping. It shall be free from unpleasant odours and shall have no toxic or<br />

dermatic hazards.<br />

1.4 Permittivity at 1 MHz shall not be greater than 2.3 when measured at 20 o C<br />

2 Tests on Insulated Wires<br />

2.1 Thermal Stress Cracking<br />

10 lengths of insulated conductor of 15 cm, each shall be wrapped on their own<br />

diameter with a minimum of 10 continuous turns in a length of 2 cm of the<br />

insulated samples. It shall be suspended in an air oven maintained at 70 o C +<br />

1 o C for 14 days. After the period, they shall be removed from the oven and<br />

observed at ambient temperature for cracks with naked eye. There shall be no<br />

cracks.<br />

2.2 The following tests shall be conducted on all colours of insulation. Subsequent<br />

changes of colour master batch of a different grade / manufacturer / strength<br />

may involve a repetition of tests.<br />

2.2.1 Absorption of Filling Compound<br />

15 cm. length of insulation removed from any conductor shall be weighed<br />

(about 2 gm) correct to 1 mg. The length shall be placed in a test tube or beaker<br />

full of filling compound with its ends 1 cm. above the level of the filling<br />

compound and maintained at 70 o C + 1 o C for 14 days. Increase in weight of<br />

insulation shall not be more than 15%.<br />

2.2.2 Elongation and Tensile strength<br />

10 long lengths of insulation shall be carefully removed from the conductor and<br />

made into two sets of 10 half lengths. The first set shall be tested in a Tensile<br />

Testing machine for elongation. The percentage elongation on average basis<br />

and tensile strength shall not be less than 150% and 5N/mm 2 respectively. The<br />

second set of 10 samples is aged at 70 o C + 1 o C for 14 days and then tested as<br />

above. The average tensile strength of 10 samples so tested shall not change by<br />

more than 15% and the average percentage elongation at break shall not change<br />

by more than 30% of the average value of the first set.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 56 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

2.2.3 200 mm specimen shall be cut from the centre of 1500mm length and then<br />

reduced to 150mm by trimming each end of the specimen. The 150mm<br />

specimen shall be placed in a convection type air circulating oven for 24 hours<br />

at a temperature of 100 o C + 1 o C. The total shrinkage from both ends shall be<br />

measured at ambient temperature. The average shrinkage of 6 samples shall not<br />

exceed 6.35 mm.<br />

2.2.4 Environmental Stress Cracking<br />

10 lengths of insulated conductor of 150mm each shall be immersed in filling<br />

compound for 24 hours at 70 o C + 1 o C. The insulated conductor will then be<br />

removed from the compound, and wiped clean at ambient temperature. Each<br />

conductor will then be wrapped round its own diameter for a minimum of 10<br />

continuous turns in a length of 2 cm. and kept at oven at 70 o C + 1 o C for 14<br />

days. At the end of this period they shall show no cracks when seen with naked<br />

eye.<br />

3 Tests on Cables<br />

3.1 Drip Test<br />

There shall be no dripping of filling compound, when a 30 cm. length of<br />

completed cable is cut, the sheath stripped for approx. 5 cm. the conductor<br />

wiped clean and then flared and vertically suspended for 24 hours at 65 o C +<br />

1 o C.<br />

3.2 Water Penetration Test<br />

A test piece of one metre length of cable shall be cut from one end of the cable.<br />

The sample under test is kept straight in a horizontal plane. One end of the<br />

sample shall be connected suitably through a water tight gland to a water pipe<br />

containing 1 metre head of water. The connection shall be such that the cable<br />

sheath shall not be squeezed tight nor shall it allow leakage of water at this<br />

point. The other end of the cable shall be free.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

1 metre height of water shall be applied for 14 days at ambient temperature. <strong>No</strong><br />

air bubbles shall remain trapped in this pipe. Any bubbles that may be present<br />

initially should be removed by agitating the water column using a thin wire for<br />

this purpose.<br />

The test shall be deemed to have started after ensuring that the head of water is<br />

1 metre and all air bubbles have been eliminated. The sample shall not be<br />

disturbed during the period under test. During this period, no water shall have<br />

seeped from the cable sample.<br />

End of annexure - I : Type Tests on Polyethylene and Filling Compound and on Completed Cables<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 57 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Annexure - II<br />

Clause<br />

<strong>No</strong>.<br />

Particulars of <strong>Nepal</strong> <strong>Telecom</strong>'s Requirements<br />

1 Tests for laminate and composite sheath.<br />

A parallel sided test piece 150mm long and 13 to 16mm wide of the laminate or<br />

sheath shall be cut longitudinally from the laminate or sheath in one operation<br />

using a sharp punch.<br />

Bidder shall state as<br />

Fully Compliant/<br />

Partially Compliant/<br />

<strong>No</strong>n-compliant<br />

Test piece taken for testing the strength of the bond between the sheath and<br />

aluminium tape shall exclude the overlap of aluminium foil. For small diameter<br />

cables, it may not be possible to get sheath test pieces 13mm width. In such<br />

cases test pieces of less width may be taken (excluding the poly-all over alp).<br />

Test piece taken for testing the strength of the bond between the interface of the<br />

aluminium tape at the seal shall include only the over lap of the tape.<br />

(a) For testing peel strength of laminate only, separate the aluminium and<br />

copolymer tape at one end. Insert the aluminium in the fixed grip and<br />

copolymer in the moving grip of the tensile tester.<br />

(b) For testing bond strength of sheath, insert the aluminium in the fixed grip<br />

and polythene sheath in the moving grip.<br />

(c) For testing bond strength of laminate at the over lap, insert the aluminium<br />

tape in the fixed grip and the cable sheath (other edge) in the other grip. For<br />

a, b, c the grip can be brought closer upto 3cms. and electric operated<br />

tensile tester shall be used. Rate of separation between the grips shall be<br />

100 to 125mm/min and the steady force required to separate the material<br />

shall be noted.<br />

Initial separation of the laminate or laminated sheath to facilitate insertion in<br />

the grips can be made by immersing about 25mm at the end of the test piece in<br />

boiling industrial alcohol for about 30 seconds.<br />

Sampling and Requirements<br />

(a) Peel strength of the laminate raw material shall be 20gms/ mm (minimum) 5<br />

samples shall be tested.<br />

(b) Bond strength of the laminate to sheath shall be 40gms/mm (minimum)<br />

and 60gms/mm width (average) on 5 samples.<br />

(c) Peel strength of the laminate at overlap shall be the same as (b) above on 5<br />

samples.<br />

2 Samples of polythene material removed from the cable sheath shall meet the<br />

following requirements when tested in accordance with Appendix D of BS<br />

6234. Minimum tensile strength shall be 10N/mm 2 and minimum elongation at<br />

break 300%.<br />

End of annexure – II<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 58 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Annexure -III<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 59 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

List of the Approved Banks by <strong>Nepal</strong> <strong>Telecom</strong><br />

Annexure – IV<br />

SN Bank Name<br />

1 Standard Chartered Bank Ltd.<br />

2 Nabil Bank Ltd.<br />

3 <strong>Nepal</strong> Investment Bank Ltd.<br />

4 Himalayan Bank Ltd.<br />

5 Kumari Bank Ltd.<br />

6 Bank of Kathmandu Ltd.<br />

7 NIC Bank Ltd.<br />

8 Siddhartha Bank Ltd.<br />

9 Laxmi Bank Ltd.<br />

10 Lumbini Bank Ltd.<br />

11 NCC Bank Ltd.<br />

12 Machhapuchhre Bank Ltd.<br />

13 Everest Bank Ltd.<br />

14 Global Bank Ltd. Ltd.<br />

15 Development Credit Bank Ltd.<br />

16 NMB Bank Ltd.<br />

17 <strong>Nepal</strong> SBI Bank Ltd.<br />

18 Kist Bank Ltd.<br />

19 Prime Commercial Bank Ltd.<br />

20 Bank Of Asia <strong>Nepal</strong> Ltd.<br />

21 Sunrise Bank Ltd.<br />

22 Citizen Bank International Ltd.<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 60 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

List of the Bid Openning Documents<br />

Description of the document<br />

SN<br />

Bid Form duly signed with date by the authorized person and<br />

1<br />

stamped<br />

2 Bid Security furnished in accordance with clause <strong>No</strong>. – 7<br />

Price schedule duly signed with date by the authorized person<br />

3<br />

and stamped with official seal<br />

4 Manufacturer's Authorization Letter<br />

The Power of attorney and signature specimen of the authorized<br />

5<br />

person<br />

6 Quality Assurance Certificate ISO-9000<br />

7<br />

Documents to prove the bidder’s/manufacturer eligibility as per<br />

clause 16<br />

8 16.1.1<br />

9 16.1.2<br />

10 16.1.3<br />

11 16.1.4<br />

12 16.1.5<br />

13 16.2.1<br />

14 16.2.2<br />

15 16.2.3<br />

16 16.2.4<br />

17 16.2.5<br />

18 16.2.6<br />

19 16.2.7<br />

20 16.2.8<br />

21 16.4<br />

<strong>No</strong> of<br />

pages<br />

Annexure –V<br />

Remarks<br />

Signature of the Bidder: __________________________<br />

Full Name: __________________________________<br />

Designation: ________________________<br />

Bidder's official seal and date: __________________<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 61 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Supply Record<br />

Annexure VI<br />

SN<br />

Description<br />

(with Model <strong>No</strong>. and<br />

Make)<br />

1 UG Closure 150/50 P<br />

UG Closure 30/20/10<br />

2<br />

P<br />

Qty Received Date in operation<br />

till (date)<br />

Purchaser's<br />

Name<br />

Purchas<br />

er's<br />

Country<br />

Address,<br />

Name, Tel.,<br />

Fax, e-mail of<br />

the Contact<br />

Person<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 62 of 63


NEPAL TELECOM<br />

<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong><br />

Annexure –VII<br />

Satisfactory Performance Certificate<br />

Date: -----<br />

To,<br />

<strong>Nepal</strong> <strong>Telecom</strong><br />

(<strong>Nepal</strong> <strong>Doorsanchar</strong> <strong>Company</strong> <strong>Limited</strong>),<br />

Material Management Department,<br />

Central Office, <strong>Doorsanchar</strong> Bhawan,<br />

Bhadrakali Plaza, Kathmandu, <strong>Nepal</strong>.<br />

Tel. <strong>No</strong>. : 977 1 4227878, 4210309<br />

Fax <strong>No</strong>. : 977 1 4227260<br />

Website : http://www.ntc.net.np<br />

Satisfactory Performance Certificate<br />

We, _____________________ (specify the name of the <strong>Company</strong>), having our offices at _____________ (Specify Address of the<br />

<strong>Company</strong>) have been using the following Heat Shrink Enclosures manufactured by M/S _____________ (Specify name of the<br />

Manufacture) having the factory in _____________ (Specify address of the Manufacture)<br />

S.N.<br />

1<br />

2<br />

3<br />

4<br />

Description<br />

(with Model <strong>No</strong>. and Make)<br />

From<br />

in operation<br />

upto<br />

___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________<br />

___________ ___________ ___________ ___________ ___________ ___________ ___________ ______ (Performance<br />

description and recommendation by the User)<br />

Mr./Mrs. .....................<br />

Designation<br />

<strong>Company</strong> Name<br />

<strong>Company</strong> Address<br />

(<strong>Company</strong> Seal)<br />

Details of the contact person.<br />

Mr./Mrs. .....................<br />

Designation<br />

Phone <strong>No</strong>.<br />

Fax. <strong>No</strong>.<br />

e-mail address:<br />

___________________________________________________________________________________________<br />

<strong>Tender</strong> <strong>No</strong>. NDCL/01/067-68 for Supply and Delivery of Underground Duct Cables<br />

Page 63 of 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!