Jan van der Akker - Subsea UK
Jan van der Akker - Subsea UK Jan van der Akker - Subsea UK
How do these nodes interconnect? • Level 3 nodes are defined in standards like SIIS and IWIS • Communication between level 1 and level 2 uses open architecture • But for intelligent and flexible power distribution, constraints on level 2 nodes have to be considered – Voltage conversion – Power limitations • By adding power switching functionality to the level 2 outputs, we can improve – Gateway connections can be made switchable by implementing remote power switching in the CDU – Current fields utilizing i the newest communication technology use switchable outputs for instruments 14 SUBSEA SYSTEMS
Examples of remote switching 15 SUBSEA SYSTEMS
- Page 1 and 2: Long step-outs, but avoiding increa
- Page 3 and 4: What do we want? Modular power and
- Page 5 and 6: What can we offer tomorrow? • Sys
- Page 7 and 8: Recent project examples Jack & St.
- Page 9 and 10: MCS EPU HPU UTA SCM SDU / SAM SCM S
- Page 11 and 12: Communications Distribution: Compar
- Page 13: Power Distribution 13 SUBSEA SYSTEM
- Page 17 and 18: Examples of remote switching • Mo
- Page 19 and 20: Cross Section Calculations Field sc
- Page 21 and 22: The Near Future: Higher Power Requi
- Page 23 and 24: More Calculation Examples Generic c
- Page 25 and 26: Summary • High-speed communicatio
Examples of remote switching<br />
15<br />
SUBSEA SYSTEMS