02.09.2014 Views

ISPSoft User Manual

ISPSoft User Manual

ISPSoft User Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ISPSoft</strong> <strong>User</strong> <strong>Manual</strong><br />

16.4.10 Starting/Stopping the Execution of an Ether Link Online<br />

If the start mode of a node is SM Flag, users can make the node start or stop the execution of the<br />

Ether Link constructed by means of controlling the state of the related flag when the node is<br />

monitored online. If the node is not monitored online, the users can not make the node start or stop<br />

the execution of the Ether Link constructed by means of controlling the state of the related flag.<br />

<strong>User</strong>s can make a single node/multiple nodes start or stop the execution of the Ether Link<br />

constructed. The conditions for making a single node/multiple nodes start or stop the execution of<br />

the Ether Link constructed are the same as the conditions for enabling/disabling the function of<br />

monitoring a single node/multiple nodes online. Please refer to section 16.4.9 for more information.<br />

16.4.10.1 Starting the Execution of an Ether Link<br />

• Making a single node start the execution of an Ether Link<br />

‣ Method 1<br />

If users want to make a node start the execution of the Ether Link constructed, they have to<br />

select the node, and click on the toolbar. They can also make the node start the<br />

execution of the Ether Link constructed by selecting the node, clicking the PLC menu, pointing<br />

to Flag Control, and clicking Start Ether Link (Single PLC).<br />

‣ Method 2<br />

Select a node, right-click the node, and click Start Ether Link (Single PLC) on the context<br />

menu.<br />

16-75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!