ISPSoft User Manual
ISPSoft User Manual ISPSoft User Manual
Chapter 2 Starting and Setting Table of Contents 2.1 Guide to Starting ISPSoft and Introduction of the Environment .............2-2 2.1.1 First Step of Entering ISPSoft.............................................................2-2 2.1.2 Window Title and Status Bar ..............................................................2-5 2.1.3 Menu Bar............................................................................................2-6 2.1.4 Toolbars..............................................................................................2-8 2.1.5 Project Management Area and Message Display Area ......................2-9 2.1.6 Working Area....................................................................................2-11 2.2 Project Framework...............................................................................2-13 2.2.1 Single Project and Group of Projects ...............................................2-13 2.2.2 Integration of PMSoft into ISPSoft....................................................2-14 2.2.3 Managing a Single Project ...............................................................2-15 2.2.4 Managing a Group of Projects..........................................................2-20 2.2.5 Managing a PMSoft Project through ISPSoft....................................2-26 2.3 Basic Setting in ISPSoft .......................................................................2-30 2.3.1 System Setting and Environment Setting .........................................2-30 2.3.2 Importing and Exporting Preferences ...............................................2-35 2.4 Communication Setting........................................................................2-36 2.4.1 Starting/Closing COMMGR ..............................................................2-36 2.4.2 Managing Drivers .............................................................................2-37 2.4.3 Creating a Connection─Creating a Driver ........................................2-38 2.4.3.1 Setting Communication Parameters for RS232.....................2-39 2.4.3.2 Setting Communication Parameters for USB (Virtual COM)..2-40 2.4.3.3 Setting Communication Parameters for DirectLink (USB) .....2-41 2.4.3.4 Setting Communication Parameters for Ethernet ..................2-41 2.4.3.5 Setting Communication Parameters for DirectLink (Ethernet) ..............................................................................................2-42 2.4.3.6 Setting Communication Parameters for a DVP Simulator......2-43 2.4.3.7 Setting Communication Parameters for a AH Simulator ........2-43 2.4.4 Creating a Connection─Starting/Stopping a Driver...........................2-44 2.4.5 Creating a Connection─Configuring/Deleting a Driver .....................2-45 2.4.6 Creating a Connection Between ISPSoft and COMMGR .................2-45 2.4.7 Connecting a PLC and a Communication Port.................................2-47 2.4.8 Practical Connection Test.................................................................2-50 2-1
ISPSoft User Manual 2.1 Guide to Starting ISPSoft and Introduction of the Environment 2.1.1 First Step of Entering ISPSoft After ISPSoft is installed, shortcuts to the program are created on the desktop and the Start menu. Users can click the shortcut on the Start menu or double-click the shortcut on the desktop to start ISPSfot. Besides, several ISPSoft windows are allowed. Users can start ISPSoft again in the same way. After the welcome screen disappears, the Delta ISPSoft window appears. There are basic functions available to users. After on the toolbar is clicked, a new project is created. In the Create a New Project window, type a project name in the Project Name box and a path in the Drive/Path box, and select a PLC in the PLC Type drop-down list box. After users click Properties…, they can give a description of this project. Finally, click OK. 2-2
- Page 2 and 3: ISPSoft User Manual Preface ISPSoft
- Page 4 and 5: Chapter 1 Introduction of the Softw
- Page 6 and 7: Chapter 1 Introduction of the Softw
- Page 8 and 9: Chapter 1 Introduction of the Softw
- Page 10 and 11: Chapter 1 Introduction of the Softw
- Page 12 and 13: Chapter 1 Introduction of the Softw
- Page 16 and 17: Chapter 2 Starting and Setting Afte
- Page 18 and 19: Chapter 2 Starting and Setting Win
- Page 20 and 21: Chapter 2 Starting and Setting •
- Page 22 and 23: Chapter 2 Starting and Setting •
- Page 24 and 25: Chapter 2 Starting and Setting they
- Page 26 and 27: Chapter 2 Starting and Setting •
- Page 28 and 29: Chapter 2 Starting and Setting *1.
- Page 30 and 31: Chapter 2 Starting and Setting User
- Page 32 and 33: Chapter 2 Starting and Setting File
- Page 34 and 35: Chapter 2 Starting and Setting Afte
- Page 36 and 37: Chapter 2 Starting and Setting •
- Page 38 and 39: Chapter 2 Starting and Setting Afte
- Page 40 and 41: Chapter 2 Starting and Setting In t
- Page 42 and 43: Chapter 2 Starting and Setting Afte
- Page 44 and 45: Chapter 2 Starting and Setting •
- Page 46 and 47: Chapter 2 Starting and Setting •
- Page 48 and 49: Chapter 2 Starting and Setting *. I
- Page 50 and 51: Chapter 2 Starting and Setting Afte
- Page 52 and 53: Chapter 2 Starting and Setting ‣
- Page 54 and 55: Chapter 2 Starting and Setting 2.4.
- Page 56 and 57: Chapter 2 Starting and Setting Numb
- Page 58 and 59: Chapter 2 Starting and Setting they
- Page 60 and 61: Chapter 2 Starting and Setting (5)
- Page 62 and 63: Chapter 2 Starting and Setting Addi
Chapter 2<br />
Starting and Setting<br />
Table of Contents<br />
2.1 Guide to Starting <strong>ISPSoft</strong> and Introduction of the Environment .............2-2<br />
2.1.1 First Step of Entering <strong>ISPSoft</strong>.............................................................2-2<br />
2.1.2 Window Title and Status Bar ..............................................................2-5<br />
2.1.3 Menu Bar............................................................................................2-6<br />
2.1.4 Toolbars..............................................................................................2-8<br />
2.1.5 Project Management Area and Message Display Area ......................2-9<br />
2.1.6 Working Area....................................................................................2-11<br />
2.2 Project Framework...............................................................................2-13<br />
2.2.1 Single Project and Group of Projects ...............................................2-13<br />
2.2.2 Integration of PMSoft into <strong>ISPSoft</strong>....................................................2-14<br />
2.2.3 Managing a Single Project ...............................................................2-15<br />
2.2.4 Managing a Group of Projects..........................................................2-20<br />
2.2.5 Managing a PMSoft Project through <strong>ISPSoft</strong>....................................2-26<br />
2.3 Basic Setting in <strong>ISPSoft</strong> .......................................................................2-30<br />
2.3.1 System Setting and Environment Setting .........................................2-30<br />
2.3.2 Importing and Exporting Preferences ...............................................2-35<br />
2.4 Communication Setting........................................................................2-36<br />
2.4.1 Starting/Closing COMMGR ..............................................................2-36<br />
2.4.2 Managing Drivers .............................................................................2-37<br />
2.4.3 Creating a Connection─Creating a Driver ........................................2-38<br />
2.4.3.1 Setting Communication Parameters for RS232.....................2-39<br />
2.4.3.2 Setting Communication Parameters for USB (Virtual COM)..2-40<br />
2.4.3.3 Setting Communication Parameters for DirectLink (USB) .....2-41<br />
2.4.3.4 Setting Communication Parameters for Ethernet ..................2-41<br />
2.4.3.5 Setting Communication Parameters for DirectLink (Ethernet)<br />
..............................................................................................2-42<br />
2.4.3.6 Setting Communication Parameters for a DVP Simulator......2-43<br />
2.4.3.7 Setting Communication Parameters for a AH Simulator ........2-43<br />
2.4.4 Creating a Connection─Starting/Stopping a Driver...........................2-44<br />
2.4.5 Creating a Connection─Configuring/Deleting a Driver .....................2-45<br />
2.4.6 Creating a Connection Between <strong>ISPSoft</strong> and COMMGR .................2-45<br />
2.4.7 Connecting a PLC and a Communication Port.................................2-47<br />
2.4.8 Practical Connection Test.................................................................2-50<br />
2-1