Installation, Operation and Maintenance Manual - Data Aire
Installation, Operation and Maintenance Manual - Data Aire
Installation, Operation and Maintenance Manual - Data Aire
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6.0 GLYCOL SYSTEMS<br />
6.1 Glycol Concentration<br />
The system must be fi lled with water <strong>and</strong> the appropriate amount of ethylene or propylene glycol<br />
to protect against winter freezing. To achieve the approximate glycol concentration, it is necessary<br />
to know the total system volume. The total system volume consists of the fl uid cooler volume, the<br />
evaporator unit volume <strong>and</strong> the volume of the inter-connecting piping.<br />
The following tables can be used for arriving at an approximate system volume. After installation,<br />
the glycol percentage should be checked. The glycol percentage should be checked at regular<br />
intervals to ensure against freeze protection.<br />
6.2 Internal (Fluid) Volume<br />
Evaporator Model<br />
Volume (gallons) - no Energy<br />
Saver Coil<br />
Volume (gallons) – with Energy<br />
Saver Coil<br />
DAPG 2.5 1.0 2.5<br />
DAPG 03 1.0 2.5<br />
DAPG 04 2.5 4.0<br />
DAPG 05 2.5 4.0<br />
6.3 Fluid Cooler Internal Volume<br />
Fluid Cooler Volume (gallons) Fluid Cooler Volume (gallons)<br />
DAFC 06 2.5 DAFC 17 6.6<br />
DAFC 07 3.4 DAFC 21 7.4<br />
DAFC 09 4.2 DAFC 24 9.8<br />
DAFC 11 3.3 DAFC 29 12.3<br />
DAFC 15 4.9<br />
6.4 Copper Piping Internal Volume<br />
Pipe Diameter Inches O.D.<br />
Volume per 100 feet of Pipe (gallons)<br />
5/8 1.2<br />
3/4 1.8<br />
7/8 2.5<br />
1-1/8 2.5<br />
1-5/8 4.3<br />
2-1/8 9.2<br />
28