St. Vincent’s Healthcare Group Limited - Annual Review 2007 St. Vincent's Private Hospital Laundry Service As part of improving the hygiene services throughout the Hospital there are now smaller trolleys in use to deliver linen to and from the ward areas. The linen contractor now washes the new trolleys each day. Household service staff in conjunction with infection control visited the linen company and reviewed the procedures in place. The linen delivery time has also been changed to 7.30am to facilitate congestion in the back yard delivery area. New scrub suits were rolled out to the required clinical areas in June. Recycling The household team also did some very good work in supplying recycling bins to 87 areas throughout the Hospital. There have been huge improvements in the level of recycling taking place. Cleaning and Hygiene A revised cleaning specification was issued in July. Additional hours were allocated to daycare and patient floors. A representative from BSAP Ltd carried out two audits during the year. The audits were in March and November and covered areas listed in the national hygiene services assessment scheme. Action plans were compiled to meet standards. The team continues to work closely with general refurbishment and facility enhancement projects that are carried out. Maintenance Department There are a total of 87 external contractors who service and maintain equipment on a regular basis. There are two on site personnel who work over six days. Non-routine work and projects are organised separately by using reputable outside firms who continue to complete the majority of our project work. Approximately 2,684 requisition dockets were completed in 2007. In keeping with Health and Safety Regulations an External Contractors Form is completed by all contractors and kept in the relevant project files. Projects External contractors carried out a total of 17 projects. All projects are monitored through our maintenance administration office. Some of the projects completed last year include: • A new Dishwashing System was put in place in the tray room. • Air Conditioning Units installed in Admissions. • Newbridge Engineering installed a ladder to the lift motor room. • Gents changing room enhancement. Return to Contents 96
St. Vincent’s Healthcare Group Limited - Annual Review 2007 St. Vincent's Private Hospital • Maple Unit room 136 refurbishment to PFT Lab. • Hawthorn Ward new sluice Sterilizer. • Rowan Ward new sluice Sterilizer. • External storage area in place for finance documentation. • CT upgrade in Radiotherapy. • Air Conditioning Units installed in Day Oncology. • Car park exit and entrance barriers replaced. • Refurbishment of Chaplains office, Pastoral care office. • New storage area put in place for BOC oxygen supply. • Air conditioning units installed in Radiotherapy. • In the MRI room new Air Conditioning Units were installed. • St Joseph’s Air Conditioning Units installed. • 4th Floor Air Conditioning Units installed in bedrooms and treatment rooms. • Extensive work was carried out in the coffee shop in January. The sandwich bar was relocated to enhance customer flow. • William Farrell & Co carried out exploratory work on the electrical board in the kitchen in July. Fire Prevention Apex Fire have completed the following upgrade works: The Fire alarm sound was checked to comply with the 65 decibels regulation. The Fire Register & Fire Service folders were reviewed and have been updated. Michael Slattery Associates Fire Advisor, Brendan Kavanagh assisted the Hospital in carrying out 4 Fire Evacuations in patient areas, Theatre and Day care. Fire training sessions were available for all staff through the year. Catering Department The Catering Department services the needs of 162 in-patients, 30 day-care patients and approximately 400 staff and visitors daily here in the Hospital. The Department also caters for various functions throughout the year as well as in-house meetings. The team consists of 68 staff lead by Yvonne Byrne and Geraldine O’ Nolan. The Catering Department has a fully implemented HACCP system and an ISO 22000: 2005 and IS 343 accreditation. The Kitchen prepares and cooks the food on the day for all areas and is supervised by our Senior Chef Michele Pounch. The Coffee Shop opens from 7.00am – 5.00pm and seats 110 people. This department is very quality focused and promotes a culture of continuous improvements through out the year. Return to Contents 97
- Page 46 and 47: In collaboration with Prof. Kingsto
- Page 48 and 49: Education & Research Poster Present
- Page 50 and 51: St. Vincent’s Healthcare Group Li
- Page 52 and 53: St. Vincent’s Healthcare Group Li
- Page 54 and 55: St. Vincent’s Healthcare Group Li
- Page 56 and 57: Education & Research Pharmaceutical
- Page 58 and 59: St. Vincent’s Healthcare Group Li
- Page 60 and 61: Prestigious Invitations/Honours for
- Page 62 and 63: St. Vincent’s Healthcare Group Li
- Page 64 and 65: St. Vincent’s Healthcare Group Li
- Page 66 and 67: St. Vincent’s Healthcare Group Li
- Page 68 and 69: St. Vincent’s Healthcare Group Li
- Page 70 and 71: St. Vincent’s Healthcare Group Li
- Page 72 and 73: St. Vincent’s Healthcare Group Li
- Page 74 and 75: 74 Quality
- Page 76 and 77: St. Vincent’s Healthcare Group Li
- Page 78 and 79: St. Vincent’s Healthcare Group Li
- Page 80 and 81: St. Michael’s Hospital Nursing Th
- Page 82: St. Vincent’s Healthcare Group Li
- Page 85 and 86: St. Vincent's Private Hospital Cons
- Page 87 and 88: St. Vincent's Private Hospital A mo
- Page 89 and 90: St. Vincent's Private Hospital Nurs
- Page 91 and 92: St. Vincent’s Healthcare Group Li
- Page 93 and 94: St. Vincent's Private Hospital Nati
- Page 95: St. Vincent's Private Hospital Supp
- Page 99 and 100: St. Vincent's Private Hospital Trai
- Page 101 and 102: St. Vincent's Private Hospital Occu
- Page 103 and 104: St. Vincent’s Healthcare Group Li
- Page 105 and 106: St. Vincent's Private Hospital The
- Page 107 and 108: St. Vincent’s Healthcare Group Li
- Page 109 and 110: St. Vincent’s Healthcare Group Li
- Page 111 and 112: Report from the Director of Operati
- Page 113 and 114: St. Vincent’s Healthcare Group Li
- Page 115 and 116: St. Vincent’s Healthcare Group Li
- Page 117 and 118: Department - Chaplaincy/Pastoral Ca
- Page 119 and 120: St. Vincent’s Healthcare Group Li
- Page 121 and 122: Department - Library & Information
- Page 123 and 124: St. Vincent’s Healthcare Group Li
- Page 125 and 126: St. Vincent’s Healthcare Group Li
- Page 127 and 128: St. Vincent’s Healthcare Group Li
- Page 129 and 130: St. Vincent’s Healthcare Group Li
- Page 131 and 132: St. Vincent’s Healthcare Group Li
- Page 133 and 134: St. Vincent’s Healthcare Group Li
- Page 135 and 136: St. Vincent’s Healthcare Group Li
- Page 137 and 138: St. Vincent’s Healthcare Group Li
- Page 139 and 140: Allied Health Professionals - Occup
- Page 141 and 142: Allied Health Professionals - Pharm
- Page 143 and 144: Allied Health Professionals - Pharm
- Page 145 and 146: St. Vincent’s Healthcare Group Li
<strong>St</strong>. Vincent’s Healthcare Group Limited - Annual Review 2007<br />
<strong>St</strong>. <strong>Vincent's</strong> Private <strong>Hospital</strong><br />
Laundry Service<br />
As part of improving the hygiene services throughout the <strong>Hospital</strong> there are now smaller trolleys in use to<br />
deliver linen to and from the ward areas. The linen contractor now washes the new trolleys each day.<br />
Household service staff in conjunction with infection control visited the linen company and reviewed the<br />
procedures in place. The linen delivery time has also been changed to 7.30am to facilitate congestion in the<br />
back yard delivery area. New scrub suits were rolled out to the required clinical areas in June.<br />
Recycling<br />
The household team also did some very good work in supplying recycling bins to 87 areas throughout the<br />
<strong>Hospital</strong>. There have been huge improvements in the level of recycling taking place.<br />
Cleaning and Hygiene<br />
A revised cleaning specification was issued in July. Additional hours were allocated to daycare and patient<br />
floors.<br />
A representative from BSAP Ltd carried out two audits during the year. The audits were in March and<br />
November and covered areas listed in the national hygiene services assessment scheme. Action plans were<br />
compiled to meet standards.<br />
The team continues to work closely with general refurbishment and facility enhancement projects that are<br />
carried out.<br />
Maintenance Department<br />
There are a total of 87 external contractors who service and maintain equipment on a regular basis. There<br />
are two on site personnel who work over six days. Non-routine work and projects are organised separately<br />
by using reputable outside firms who continue to complete the majority of our project work. Approximately<br />
2,684 requisition dockets were completed in 2007. In keeping with Health and Safety Regulations an<br />
External Contractors Form is completed by all contractors and kept in the relevant project files.<br />
Projects<br />
External contractors carried out a total of 17 projects. All projects are monitored through our maintenance<br />
administration office.<br />
Some of the projects completed last year include:<br />
• A new Dishwashing System was put in place in the tray room.<br />
• Air Conditioning Units installed in Admissions.<br />
• Newbridge Engineering installed a ladder to the lift motor room.<br />
• Gents changing room enhancement.<br />