<strong>Chip</strong>BLASTER, Inc. 105<br />

27.0. OPTIONAL EQUIPMENT (Cont.):<br />

27.19. PRESET PRESSURES:<br />

27.19.1. Preset pressures add the flexibility of four pre programmed drive speeds to give<br />

four separate operating pressures by the use of “M” codes from the machine<br />

tool. The machine tool control must be capable of a total of 4 sets of<br />

maintained (on and off) “M” codes total for a single outlet <strong>Chip</strong>BLASTER or<br />

5 sets of maintained (on and off) for a two outlet <strong>Chip</strong>BLASTER. The<br />

machine tool must also be capable of supplying two maintained “M” codes at<br />

the same time for pressures of 750, 500 and 250 to 300 psig. The call for<br />

coolant “M” code used to energize CR1 and/or CR2 (if used) alone will be<br />

used for pressure number 1 typically 1000 PSIG (68.9 Bar). The call for<br />

coolant “M” code used to energize CR1 and/or CR2 (if used) and CR21 will be<br />

used for pressure number 2 typically 750 PSIG (51.7 Bar). The call for coolant<br />

“M” code used to energize CR1 and/or CR2 (if used) and CR22 will be used<br />

for pressure number 3 typically 500 PSIG (34.4 Bar). The call for coolant “M”<br />

code used to energize CR1 and/or CR2 (if used) and CR23 will be used for<br />

pressure number 4 typically between 250 and 300 PSIG (17.2 and 20.6 Bar).<br />

Refer to figure 21 for chart.<br />

NOTE: OTHER PRESSURE SETTINGS ARE AVAILABLE BETWEEN THE MINIMUM<br />

AND MAXIMUM RANGE OF THE <strong>Chip</strong>BLASTER UNIT. FOR OTHER SETTING PLEASE<br />

ADVISE <strong>Chip</strong>BLASTER Inc. AT THE TIME OF ORDER.<br />

IT IS RECOMMENDED THAT PRESET PRESSURES BE PURCHASED<br />

AT THE SAME TIME THE <strong>Chip</strong>BLASTER UNIT IS PURCHASED.<br />

CR 1<br />

AND/OR<br />

CR2<br />

CR 21 CR22<br />

Figure 21.<br />

CR23<br />

PRESSURE<br />

PSIG<br />

SPEED #1 1 0 0 0 1000 FASTEST<br />

SPEED #2 1 1 0 0<br />

SPEED #3 1 0 1 0<br />

SPEED #4 1 0 0 1<br />

750<br />

500<br />

250 - 300<br />

SLOWEST<br />

A "1" INDICATES WHICH RELAY IS ENERGIZED.<br />

IF MAINTAINED “M” CODES ARE NOT AVAILABLE PLEASE CONTACT<br />

<strong>Chip</strong>BLASTER SALES FOR AN INTERFACE TO CONVERT PULSED OR MONENTARY<br />

“M” CODES TO MAINTAINED. PLEASE PROVIDE THE FOLLOWING INFORMATION:<br />

27.19.2. Voltage of signal i.e. 24 VDC or 110 VAC.<br />

27.19.3. Is acknowledgement “ACK” or finish “FIN” signal is required by machine tool.<br />

27.19.4. Will one “M” code turn on each of the call for coolant and / or pressure requests<br />

and than use one “M” code to shut all “M” codes off.<br />

27.19.5. Also any special considerations that may be required.<br />

DO NOT EXCEED THE MACHINE TOOL MANUFACTURERS<br />

MAXIMUM OPERATING PRESSURE.