The <strong>Construction</strong> Project — In Brief<br />
Where Health and <strong><strong>Safe</strong>ty</strong> Planning Fits and Who is<br />
Responsible<br />
Area of work to be considered<br />
Planning and design<br />
Preparation of health and safety plans<br />
Selection of designers and contractors<br />
Planning and scheduling of the work<br />
Responsibility (‘the team’)<br />
Client, designers/advisers<br />
Client, designers/advisers, contractors<br />
Client, designers/advisers<br />
Designers/advisers, contractors<br />
The <strong>Construction</strong> Project — In Brief<br />
Carrying out the construction work* or<br />
parts of it<br />
Advisers, contractors<br />
Before You Start<br />
The Team: Client, Designers/Advisers, Contractors<br />
The client decides to go ahead with construction work (this may include repairing,<br />
refurbishing, demolishing or maintaining a structure). Decisions are made regarding<br />
the overall plan, initial design, and construction methods that will affect health and<br />
safety throughout the project.<br />
<strong>Construction</strong> <strong><strong>Safe</strong>ty</strong> <strong>Management</strong> <strong>Guide</strong> 11