API 510 ICP Self Study Note-My preexam self study note
API 510 ICP Self Study Note-My preexam self study note API 510 ICP Self Study Note-My preexam self study note
3.18 ET: Eddy current examination technique. 3.19 engineer: Pressure vessel engineer. Fion Zhang/ Charlie Chong
3.20 examiner: A person who assists the inspector by performing specific nondestructive examination (NDE) on pressure vessel components but does not evaluate the results of those examinations in accordance with API 510, unless specifically trained and authorized to do so by the owner/user. Fion Zhang/ Charlie Chong
- Page 19 and 20: 其 他 规 范 覆 盖 特 定 行
- Page 21 and 22: 1.1.3 限 制 因 素 此 规 范
- Page 23 and 24: 1.2 Specific Applications 1.2.1 Exp
- Page 25 and 26: 勘 探 和 生 产 E&P 第 九 章
- Page 27 and 28: 1.2.2 除 外 / 赦 免 和 可 选
- Page 29 and 30: APPENDIX A—ASME CODE EXEMPTIONS.
- Page 31 and 32: APPENDIX A—ASME CODE EXEMPTIONS.
- Page 33 and 34: Fion Zhang/ Charlie Chong 交 通
- Page 35 and 36: 工 艺 管 道 Fion Zhang/ Charlie
- Page 37 and 38: Fion Zhang/ Charlie Chong 旋 转
- Page 39 and 40: APPENDIX A - ASME CODE EXEMPTIONS,
- Page 41 and 42: . All classes of containers listed
- Page 43 and 44: 5. Piping components such as pipe,
- Page 45 and 46: Water under pressure with or withou
- Page 47 and 48: 7. 不 超 过 以 下 限 制 的
- Page 49 and 50: d (c) . 当 压 力 容 器 不 超
- Page 51 and 52: 当 压 力 容 器 不 超 过 下
- Page 53 and 54: 1.3 认 可 的 技 术 概 念 API
- Page 55 and 56: The most recent editions of the fol
- Page 57 and 58: National Board • NB-23 National B
- Page 59 and 60: For the purposes of this code, the
- Page 61 and 62: 以 下 不 应 被 视 为 改 变
- Page 63 and 64: 3.5 authorization: Approval/agreeme
- Page 65 and 66: 3.7 authorized pressure vessel insp
- Page 67 and 68: http://www.twi.co.uk/news-events/bu
- Page 69: 3.15 defect: An imperfection, whose
- Page 73 and 74: Why the Examiner does not evaluate
- Page 75 and 76: 3.25 imperfections: Flaws or other
- Page 77 and 78: 3.30 inspection: The external, inte
- Page 79 and 80: MAWP MAWP + static head Fion Zhang/
- Page 81 and 82: 3.41 non-pressure boundary: The por
- Page 83 and 84: 3.48 pressure vessel engineer : A p
- Page 85 and 86: PWHT: Postweld heat treatment. 焊
- Page 87 and 88: 3.53 repair 修 复 : 必 要 的
- Page 89 and 90: 3.54 repair organization 维 修
- Page 91 and 92: 3.55 required thickness 所 需 的
- Page 93 and 94: 3.59 temper embrittlement : The red
- Page 95 and 96: SECTION 4— OWNER/USER INSPECTION
- Page 97 and 98: 4.1 General The owner/user shall ex
- Page 99 and 100: 值 得 注 意 的 是 , 当 考
- Page 101 and 102: An owner/user organization is respo
- Page 103 and 104: Quality assurance inspection/repair
- Page 105 and 106: Quality assurance inspection/repair
- Page 107 and 108: 检 查 / 维 修 质 量 保 证
- Page 109 and 110: 4.2.2 Engineer The engineer is resp
- Page 111 and 112: 确 保 只 有 符 合 适 用 施
- Page 113 and 114: 4.2.4 Inspector • 授 权 检 验
- Page 115 and 116: 4.2.5 Examiners 检 查 员 4.2.5.1
- Page 117 and 118: 4.2.6 Other Personnel Operating, ma
- Page 119 and 120: SECTION 5—INSPECTION, EXAMINATION
3.18 ET: Eddy current examination technique.<br />
3.19 engineer: Pressure vessel engineer.<br />
Fion Zhang/ Charlie Chong