26.08.2014 Views

Welding Inspection & Metallurgy API ICP Self Study Notes

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11.2.4 <strong>Inspection</strong><br />

<strong>Inspection</strong> tasks typically associated with hot tapping or welding on in-service<br />

equipment should include:<br />

a. Verifying adequate wall thickness along the lengths of the proposed welds<br />

typically using UT or RT.<br />

b. Verifying the welding procedure. Often, plants have welding procedures<br />

qualified specifically for hot taps and in-service welding.<br />

c. Verifying flow conditions.<br />

d. Specifying the sequence of welding full encirclement sleeves and fittings<br />

(circumferential and longitudinal welds).<br />

e. Verifying fit-up of the hot tap fitting.<br />

f. Auditing welding to assure the welding procedure is being followed.<br />

g. Perform NDE of completed welds. Typically this includes VT, UT shear<br />

wave using special procedures for the joint configuration, MT or PT as<br />

applicable for material and temperature.<br />

h. Witness leak testing of fitting, if specified.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!