26.08.2014 Views

Welding Inspection & Metallurgy API ICP Self Study Notes

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

c) 50% coarse pearlite + 25% bainite + 25% martensite: To do this, we will<br />

need to have a three step process. First, cool to a temperature above the<br />

nose of the IT curve and hold until you have converted 50% of the austenite<br />

to coarse pearlite. Second, rapidly cool to a temperature below the nose, but<br />

above the M start temperature, and hold until 50% of the remaining austenite is<br />

converted to bainite (this makes 50% of 50% = 25% bainite). Finally, rapidly<br />

quench through the Mf temperature to completely convert the remaining<br />

austenite to martensite

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!