RBI Assessment Basis. RBI techniques to determine the initial and subsequent inspection intervals; • overpressure events - probability and consequence of failure of pressure-relief devices to open on demand during emergency. • normal operation -probability that a pressure-relief device will leak in service and consequences associated with this leakage during Fion Zhang/ Charlie Chong
API572, 6.4.3 Frequency of Visual On-stream Inspections The maximum interval for visual on-stream inspections is five years. API510 6.6.2.2 (incl. E&P services) Pressure relief devices testing and inspection interval API576 6.4.3 Visual on-stream inspection interval Five years for typical process services; and Ten years for clean (non-fouling) and non-corrosive services. Five year Fion Zhang/ Charlie Chong
- Page 225 and 226: Fion Zhang/ Charlie Chong Rupture d
- Page 227 and 228: 6.2.10 Visual Inspection This inspe
- Page 229 and 230: 6.2.11 Dismantling of Valve. Disman
- Page 231 and 232: Fion Zhang/ Charlie Chong
- Page 233 and 234: Fion Zhang/ Charlie Chong
- Page 235 and 236: Fion Zhang/ Charlie Chong
- Page 237 and 238: Portable Test Separator Internal &
- Page 239 and 240: The pilot assembly and dome area co
- Page 241 and 242: 6.2.13 Reconditioning and Replaceme
- Page 243 and 244: Fion Zhang/ Charlie Chong Most test
- Page 245 and 246: Fion Zhang/ Charlie Chong
- Page 247 and 248: After the valve has been adjusted,
- Page 249 and 250: Check for leakage during pressuriza
- Page 251 and 252: Fion Zhang/ Charlie Chong
- Page 253 and 254: Fion Zhang/ Charlie Chong
- Page 255 and 256: Fion Zhang/ Charlie Chong
- Page 257 and 258: 6.2.17 Completion of Necessary Reco
- Page 259 and 260: when a valve operates in nonfouling
- Page 261 and 262: ASME BPVC Section I requires; • B
- Page 263 and 264: Fion Zhang/ Charlie Chong
- Page 265 and 266: Fion Zhang/ Charlie Chong
- Page 267 and 268: 6.2.20 Inspection, Testing, Mainten
- Page 269 and 270: 6.2.21 Inspection, Testing, Mainten
- Page 271 and 272: 6.3 Visual On-stream Inspection Vis
- Page 273 and 274: 6.4.2 Frequency of Shop Inspection/
- Page 275: Manufacturer’s Basis • Manufact
- Page 279 and 280: Routine • inspection least interf
- Page 281 and 282: 7.1 Objective The primary objective
- Page 283 and 284: 7.3 Responsibilities Some companies
- Page 285 and 286: Annex A (informative) Pressure-reli
- Page 287 and 288: API576 Charlie Chong/ Fion Zhang/ H
- Page 289 and 290: API576 Charlie Chong/ Fion Zhang/ H
- Page 291 and 292: A.1 Need and Function of Test Block
- Page 293 and 294: A.2 Testing with Air • Air is com
- Page 295 and 296: A.4 Description of Test Block The s
- Page 297 and 298: Key 1. test station 2. adaptor for
- Page 299 and 300: API576 Charlie Chong/ Fion Zhang/ H
RBI Assessment Basis.<br />
RBI techniques to determine the initial and subsequent<br />
inspection intervals;<br />
• overpressure events - probability and consequence of failure<br />
of pressure-relief devices to open on demand during emergency.<br />
• normal operation -probability that a pressure-relief device will<br />
leak in service and consequences associated with this leakage<br />
during<br />