6.2.22 Inspection and Replacement of Rupture Disks • Do not reinstall the disk once it has been removed from its holder. • rupture disks should be replaced on a regular schedule based on their application, the manufacturer’s recommendations. • Reverse-buckling rupture disks may be used to facilitate and allow onstream testing of pressure-relief valves. Fion Zhang/ Charlie Chong
6.3 Visual On-stream Inspection Visual checks should include; • Leakages • Visual inspection on parts visible. • Rupture disk orientations. • Verify that there is no pressure buildup between the rupture disk and pressure-relief valve (gauge reading). • Supports and vibrations. • Tagging and correct valve (type/location) installation. • Ensure block valve is in its proper position including locking devices Fion Zhang/ Charlie Chong
- Page 219 and 220: Exercise; Dismantling of PSV Fion Z
- Page 221 and 222: Highly Reactive Materials Water-Rea
- Page 223 and 224: 6.2.7 Inspection of Adjacent Inlet
- Page 225 and 226: Fion Zhang/ Charlie Chong Rupture d
- Page 227 and 228: 6.2.10 Visual Inspection This inspe
- Page 229 and 230: 6.2.11 Dismantling of Valve. Disman
- Page 231 and 232: Fion Zhang/ Charlie Chong
- Page 233 and 234: Fion Zhang/ Charlie Chong
- Page 235 and 236: Fion Zhang/ Charlie Chong
- Page 237 and 238: Portable Test Separator Internal &
- Page 239 and 240: The pilot assembly and dome area co
- Page 241 and 242: 6.2.13 Reconditioning and Replaceme
- Page 243 and 244: Fion Zhang/ Charlie Chong Most test
- Page 245 and 246: Fion Zhang/ Charlie Chong
- Page 247 and 248: After the valve has been adjusted,
- Page 249 and 250: Check for leakage during pressuriza
- Page 251 and 252: Fion Zhang/ Charlie Chong
- Page 253 and 254: Fion Zhang/ Charlie Chong
- Page 255 and 256: Fion Zhang/ Charlie Chong
- Page 257 and 258: 6.2.17 Completion of Necessary Reco
- Page 259 and 260: when a valve operates in nonfouling
- Page 261 and 262: ASME BPVC Section I requires; • B
- Page 263 and 264: Fion Zhang/ Charlie Chong
- Page 265 and 266: Fion Zhang/ Charlie Chong
- Page 267 and 268: 6.2.20 Inspection, Testing, Mainten
- Page 269: 6.2.21 Inspection, Testing, Mainten
- Page 273 and 274: 6.4.2 Frequency of Shop Inspection/
- Page 275 and 276: Manufacturer’s Basis • Manufact
- Page 277 and 278: API572, 6.4.3 Frequency of Visual O
- Page 279 and 280: Routine • inspection least interf
- Page 281 and 282: 7.1 Objective The primary objective
- Page 283 and 284: 7.3 Responsibilities Some companies
- Page 285 and 286: Annex A (informative) Pressure-reli
- Page 287 and 288: API576 Charlie Chong/ Fion Zhang/ H
- Page 289 and 290: API576 Charlie Chong/ Fion Zhang/ H
- Page 291 and 292: A.1 Need and Function of Test Block
- Page 293 and 294: A.2 Testing with Air • Air is com
- Page 295 and 296: A.4 Description of Test Block The s
- Page 297 and 298: Key 1. test station 2. adaptor for
- Page 299 and 300: API576 Charlie Chong/ Fion Zhang/ H
6.2.22 Inspection and Replacement of Rupture Disks<br />
• Do not reinstall the disk once it has been removed from its holder.<br />
• rupture disks should be replaced on a regular schedule based on their<br />
application, the manufacturer’s recommendations.<br />
• Reverse-buckling rupture disks may be used to facilitate and allow onstream<br />
testing of pressure-relief valves.<br />
Fion Zhang/ Charlie Chong