API-RP-576
API ICP Self Study Notes API ICP Self Study Notes
26.08.2014
Views
Fion Zhang/ Charlie Chong
Fion Zhang/ Charlie Chong
- Page 183 and 184: Rough handling can occur during;
- Page 185 and 186: The following table summarises the
- Page 187 and 188: Greater differentials between opera
- Page 189 and 190: 5.10 Improper Discharge Piping Test
- Page 191 and 192: Fion Zhang/ Charlie Chong When hydr
- Page 193 and 194: Fion Zhang/ Charlie Chong the bello
- Page 195 and 196: 5.11 Improper Handling, Installatio
- Page 197 and 198: Rupture disk problems are often ass
- Page 199 and 200: Fion Zhang/ Charlie Chong
- Page 201 and 202: Fion Zhang/ Charlie Chong
- Page 203 and 204: Fion Zhang/ Charlie Chong
- Page 205 and 206: Fion Zhang/ Charlie Chong
- Page 207 and 208: Fion Zhang/ Charlie Chong
- Page 209 and 210: 6.1 Reasons for Inspection and Test
- Page 211 and 212: 6.2.2 Safety 1. proper authority an
- Page 213 and 214: National Board approved ASME stamps
- Page 215 and 216: The Kdr or aW value can vary accord
- Page 217 and 218: 6.2.5 Removal of Device from System
- Page 219 and 220: Exercise; Dismantling of PSV Fion Z
- Page 221 and 222: Highly Reactive Materials Water-Rea
- Page 223 and 224: 6.2.7 Inspection of Adjacent Inlet
- Page 225 and 226: Fion Zhang/ Charlie Chong Rupture d
- Page 227 and 228: 6.2.10 Visual Inspection This inspe
- Page 229 and 230: 6.2.11 Dismantling of Valve. Disman
- Page 231 and 232: Fion Zhang/ Charlie Chong
- Page 233: Fion Zhang/ Charlie Chong
- Page 237 and 238: Portable Test Separator Internal &
- Page 239 and 240: The pilot assembly and dome area co
- Page 241 and 242: 6.2.13 Reconditioning and Replaceme
- Page 243 and 244: Fion Zhang/ Charlie Chong Most test
- Page 245 and 246: Fion Zhang/ Charlie Chong
- Page 247 and 248: After the valve has been adjusted,
- Page 249 and 250: Check for leakage during pressuriza
- Page 251 and 252: Fion Zhang/ Charlie Chong
- Page 253 and 254: Fion Zhang/ Charlie Chong
- Page 255 and 256: Fion Zhang/ Charlie Chong
- Page 257 and 258: 6.2.17 Completion of Necessary Reco
- Page 259 and 260: when a valve operates in nonfouling
- Page 261 and 262: ASME BPVC Section I requires; • B
- Page 263 and 264: Fion Zhang/ Charlie Chong
- Page 265 and 266: Fion Zhang/ Charlie Chong
- Page 267 and 268: 6.2.20 Inspection, Testing, Mainten
- Page 269 and 270: 6.2.21 Inspection, Testing, Mainten
- Page 271 and 272: 6.3 Visual On-stream Inspection Vis
- Page 273 and 274: 6.4.2 Frequency of Shop Inspection/
- Page 275 and 276: Manufacturer’s Basis • Manufact
- Page 277 and 278: API572, 6.4.3 Frequency of Visual O
- Page 279 and 280: Routine • inspection least interf
- Page 281 and 282: 7.1 Objective The primary objective
- Page 283 and 284: 7.3 Responsibilities Some companies
Fion Zhang/ Charlie Chong