- Page 1:
Welding Inspection & Metallurgy API
- Page 6 and 7:
http://myicp.api.org/DirectorySearc
- Page 8:
This recommended practice provides
- Page 11 and 12:
http://www.smt.sandvik.com/en/searc
- Page 13 and 14:
Content: 1 SCOPE 2 REFERENCES 2.1 C
- Page 15 and 16:
6 WELDING PROCEDURE 6.1 General 6.2
- Page 17 and 18:
10 METALLURGY 10.1 General 10.2 The
- Page 19 and 20:
1 Scope
- Page 21 and 22:
This recommended practice provides
- Page 23 and 24:
This recommended practice provides
- Page 25 and 26:
This recommended practice provides
- Page 27 and 28:
This recommended practice provides
- Page 29 and 30:
API 577 is to aid the inspector in
- Page 31 and 32:
API Std 653 Tank Inspection, Repair
- Page 33 and 34:
How this API Standard relates with
- Page 35 and 36:
API 510: 8.1 SCOPE AND SPECIFIC EXE
- Page 50 and 51: The level of learning and training
- Page 52: Study Harder
- Page 55 and 56: Problems encountered during welding
- Page 57: Welds selected for inspection, and
- Page 61 and 62: A welding engineer should be consul
- Page 65 and 66: 2 References
- Page 67 and 68: API • API 510 Pressure Vessel Ins
- Page 69 and 70: AWS • A2.4 Standard Symbols for W
- Page 71 and 72: API • RP 572 Inspection of Pressu
- Page 73: 3 Definitions
- Page 77 and 78: Fillet Weld Actual throat Theoretic
- Page 79 and 80: Arc strike
- Page 81 and 82: Arc blow
- Page 83 and 84: 3.12 burn-through: A non-standard t
- Page 85 and 86: 3.16 defect: A discontinuity or dis
- Page 87 and 88: 3.22 fillet weld size: For equal le
- Page 89: Electrodes
- Page 93 and 94: 3.26 heat input: the energy supplie
- Page 95 and 96: Hot cracking
- Page 97 and 98: Hot cracking http://en.wikipedia.or
- Page 99 and 100: 3.31 inspector: An individual who i
- Page 101 and 102: Qualified & Certified Inspectors ht
- Page 103 and 104: Qualified & Certified Inspectors
- Page 106 and 107: Figure A-1—Joint Types and Applic
- Page 108 and 109: Figure A-1—Joint Types and Applic
- Page 110 and 111: lamellar tear
- Page 114 and 115: Longitudinal crack
- Page 116 and 117: PMI
- Page 118 and 119: PMI
- Page 120 and 121: PMI
- Page 122 and 123: 3.45 peening: The mechanical workin
- Page 124 and 125: Porosity
- Page 126 and 127: Slag Inclusions
- Page 128 and 129: Slag inclusions http://www.ge-mcs.c
- Page 130 and 131: Porosity
- Page 132 and 133: 3.61 tungsten inclusion: A disconti
- Page 134 and 135: Transverse crack
- Page 136 and 137: Transverse Crack
- Page 138 and 139: TIG Welding - Tungsten Inclusions
- Page 140 and 141:
TIG Welding - Tungsten Inclusions
- Page 142 and 143:
weldment: An assembly whose compone
- Page 144 and 145:
weld reinforcement weld toe
- Page 146 and 147:
weld reinforcement weld toe
- Page 148 and 149:
4 Welding Inspection
- Page 150 and 151:
4.2 TASKS PRIOR TO WELDING The impo
- Page 152:
4.2.1 Drawings, Codes, and Standard
- Page 157 and 158:
i. Preheat requirements and accepta
- Page 159 and 160:
Review requirements for the weldmen
- Page 161 and 162:
4.2.2.1 Quality control items to as
- Page 163 and 164:
4.2.3.1 Quality control items to as
- Page 166:
4.2.4 NDE Information Confirm the N
- Page 170 and 171:
Welding Equipment and Instruments
- Page 172 and 173:
4.2.6 Heat Treatment and Pressure T
- Page 174 and 175:
4.2.7 Materials Ensure all filler m
- Page 176 and 177:
Materials
- Page 178 and 179:
4.2.7.1 Quality control items to as
- Page 180 and 181:
Weld Preparation- Fit-up & Dimensio
- Page 182 and 183:
4.2.10 Welding Consumables Confirm
- Page 185 and 186:
4.3.1 Quality Assurance Establish a
- Page 187 and 188:
. Mock-up weldment, if required, me
- Page 189 and 190:
In-process ferrite measurement
- Page 191 and 192:
In-process ferrite measurement Why
- Page 193 and 194:
Schaeffer diagram
- Page 195 and 196:
4.4.1 Appearance and Finish Verify
- Page 197 and 198:
Field hardness check
- Page 199 and 200:
4.4.2 NDE Review Verify NDE is perf
- Page 201 and 202:
4.4.3 Post-weld Heat Treatment Veri
- Page 203 and 204:
PWHT Procedure
- Page 205 and 206:
Metal temperature of component meet
- Page 207 and 208:
4.5 NON-CONFORMANCES AND DEFECTS At
- Page 209 and 210:
4.7 SAFETY PRECAUTIONS Inspectors s
- Page 211 and 212:
Sevan Driller I