- Page 1: Welding Inspection & Metallurgy API
- Page 7 and 8: API 577 Advanced Welding Inspection
- Page 10 and 11: 印 度 支 那 不 就 是 “Indo
- Page 12 and 13: Speaker: Fion Zhang 2014/5/4
- Page 14 and 15: 5 WELDING PROCESSES 5.1 General 5.2
- Page 16 and 17: 9 NON-DESTRUCTIVE EXAMINATION 9.1 D
- Page 18 and 19: 11 REFINERY AND PETROCHEMICAL PLANT
- Page 20 and 21: This recommended practice provides
- Page 22 and 23: This recommended practice provides
- Page 24 and 25: This recommended practice provides
- Page 26 and 27: This recommended practice provides
- Page 28 and 29: Keywords: Fulfilling their role imp
- Page 30 and 31: API 570 Piping Inspection Code: In-
- Page 32 and 33: API RP 582 Recommended Practice Wel
- Page 34 and 35: API 510: Petroleum E&P Exploration
- Page 36: Typical E&P services are vessels as
- Page 51 and 52: Keywords: The level of learning and
- Page 54 and 55:
This recommended practice does not
- Page 56 and 57:
This recommended practice does not
- Page 60 and 61:
The importance, difficulty, and pro
- Page 62:
A welding engineer should be consul
- Page 66 and 67:
2.1 CODES AND STANDARDS The followi
- Page 68 and 69:
ASME • B31.3 Process Piping • B
- Page 70 and 71:
2.2 OTHER REFERENCES The following
- Page 72 and 73:
AWS • JWE Jefferson’s Welding E
- Page 76 and 77:
The following definitions apply for
- Page 78 and 79:
3.2 air carbon arc cutting (CAC-A):
- Page 80 and 81:
Arc blow
- Page 82 and 83:
3.6 arc welding (AW): A group of we
- Page 84 and 85:
Crack
- Page 86 and 87:
3.20 distortion: The change in shap
- Page 88 and 89:
HAZ
- Page 90 and 91:
HAZ
- Page 92 and 93:
HAZ http://www.twi-global.com/techn
- Page 94 and 95:
Hot Cracking
- Page 96 and 97:
Hot cracking These cracks are known
- Page 98 and 99:
Both solidification cracking and ho
- Page 100 and 101:
Inspector: An individual who is qua
- Page 102 and 103:
Qualified & Certified Inspectors
- Page 104:
Qualified & Certified Inspectors
- Page 107 and 108:
Figure A-1—Joint Types and Applic
- Page 109 and 110:
3.36 lack of fusion (LOF): A non-st
- Page 111:
Lamellar tear
- Page 115 and 116:
3.41 nondestructive examination (ND
- Page 117 and 118:
PMI
- Page 119 and 120:
PMI
- Page 121 and 122:
PMI
- Page 123 and 124:
This is API 577 special way of defi
- Page 125 and 126:
3.51 root face: The portion of the
- Page 127 and 128:
Slag Inclusion
- Page 129 and 130:
Slag Inclusions
- Page 131 and 132:
3.58 throat theoretical: The distan
- Page 133 and 134:
3.22 fillet weld size: For equal le
- Page 135 and 136:
Transverse Cracks
- Page 137 and 138:
Tungsten Inclusions - TIG Welding
- Page 139 and 140:
TIG Welding - Tungsten Inclusions
- Page 141 and 142:
3.64 welder certification: Written
- Page 143 and 144:
3.69 weld reinforcement: Weld metal
- Page 145 and 146:
weld toe weld reinforcement
- Page 147 and 148:
weld toe weld reinforcement
- Page 149 and 150:
4.1 GENERAL Welding inspection is a
- Page 151 and 152:
4.2.1 Drawings, Codes, and Standard
- Page 156 and 157:
4.2.1 Drawings, Codes, and Standard
- Page 158 and 159:
4.2.2 Weldment Requirements Review
- Page 160 and 161:
Review requirements for the weldmen
- Page 162 and 163:
4.2.3 Procedures and Qualification
- Page 164:
ASME IX: ARTICLE II WELDING PROCEDU
- Page 169 and 170:
4.2.5 Welding Equipment and Instrum
- Page 171 and 172:
Welding Equipment and Instruments
- Page 173 and 174:
Heat Treatment and Pressure Testing
- Page 175 and 176:
Materials
- Page 177 and 178:
Materials
- Page 179 and 180:
4.2.8 Weld Preparation Confirm weld
- Page 181 and 182:
4.2.9 Preheat Confirm the preheat e
- Page 183:
4.3 TASKS DURING WELDING OPERATIONS
- Page 186 and 187:
4.3.2 Welding Parameters and Techni
- Page 188 and 189:
4.3.3 Weldment Examination Complete
- Page 190 and 191:
In-process ferrite measurement
- Page 192 and 193:
Schaeffer diagram
- Page 194 and 195:
4.4 TASKS UPON COMPLETION OF WELDIN
- Page 196 and 197:
f. PMI of the weld, if required, an
- Page 198 and 199:
Field hardness check
- Page 200 and 201:
4.4.2.2 Potential inspector actions
- Page 202 and 203:
h. Temperature monitoring system ca
- Page 204 and 205:
4.4.4 Pressure Testing Verify press
- Page 206 and 207:
4.4.5 Documentation Audit Perform a
- Page 208 and 209:
4.6 NDE EXAMINER CERTIFICATION The
- Page 210 and 211:
Sevan Driller II http://www.cosco-s
- Page 212:
Sevan Driller I