26.08.2014 Views

Welding Inspection & Metallurgy API ICP Self Study Notes

API ICP Self Study Notes

API ICP Self Study Notes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.2.9 Preheat<br />

Confirm the preheat equipment and temperature.<br />

4.2.9.1 Quality control items to assess:<br />

a. Preheat equipment and technique are acceptable.<br />

b. Preheat coverage and temperature are correct (see 10.5).<br />

c. Reheat, if required, applied to thermal cutting operations.<br />

d. Preheat, if required, applied to remove moisture.<br />

4.2.9.2 Potential inspector action:<br />

Identify and correct deficiencies in the preheat operations.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!