This recommended practice provides
- Page 11 and 12:
http://www.smt.sandvik.com/en/searc
- Page 13 and 14:
Content: 1 SCOPE 2 REFERENCES 2.1 C
- Page 15 and 16:
6 WELDING PROCEDURE 6.1 General 6.2
- Page 17 and 18:
10 METALLURGY 10.1 General 10.2 The
- Page 19 and 20:
1 Scope
- Page 21 and 22:
This recommended practice provides
- Page 23 and 24:
This recommended practice provides
- Page 25 and 26:
This recommended practice provides
- Page 27 and 28:
This recommended practice provides
- Page 29 and 30:
API 577 is to aid the inspector in
- Page 31 and 32:
API Std 653 Tank Inspection, Repair
- Page 33 and 34:
How this API Standard relates with
- Page 35 and 36:
API 510: 8.1 SCOPE AND SPECIFIC EXE
- Page 50 and 51:
The level of learning and training
- Page 52:
Study Harder
- Page 55 and 56:
Problems encountered during welding
- Page 57:
Welds selected for inspection, and
- Page 61 and 62:
A welding engineer should be consul
- Page 65 and 66:
2 References
- Page 67 and 68:
API • API 510 Pressure Vessel Ins
- Page 69 and 70:
AWS • A2.4 Standard Symbols for W
- Page 71 and 72:
API • RP 572 Inspection of Pressu
- Page 73:
3 Definitions
- Page 77 and 78:
Fillet Weld Actual throat Theoretic
- Page 79 and 80:
Arc strike
- Page 81 and 82:
Arc blow
- Page 83 and 84:
3.12 burn-through: A non-standard t
- Page 85 and 86:
3.16 defect: A discontinuity or dis
- Page 87 and 88:
3.22 fillet weld size: For equal le
- Page 89 and 90:
Electrodes
- Page 91 and 92:
HAZoning
- Page 93 and 94:
3.26 heat input: the energy supplie
- Page 95 and 96:
Hot cracking
- Page 97 and 98:
Hot cracking http://en.wikipedia.or
- Page 99 and 100:
3.31 inspector: An individual who i
- Page 101 and 102:
Qualified & Certified Inspectors ht
- Page 103 and 104:
Qualified & Certified Inspectors
- Page 106 and 107:
Figure A-1—Joint Types and Applic
- Page 108 and 109:
Figure A-1—Joint Types and Applic
- Page 110 and 111:
lamellar tear
- Page 114 and 115: Longitudinal crack
- Page 116 and 117: PMI
- Page 118 and 119: PMI
- Page 120 and 121: PMI
- Page 122 and 123: 3.45 peening: The mechanical workin
- Page 124 and 125: Porosity
- Page 126 and 127: Slag Inclusions
- Page 128 and 129: Slag inclusions http://www.ge-mcs.c
- Page 130 and 131: Porosity
- Page 132 and 133: 3.61 tungsten inclusion: A disconti
- Page 134 and 135: Transverse crack
- Page 136 and 137: Transverse Crack
- Page 138 and 139: TIG Welding - Tungsten Inclusions
- Page 140 and 141: TIG Welding - Tungsten Inclusions
- Page 142 and 143: weldment: An assembly whose compone
- Page 144 and 145: weld reinforcement weld toe
- Page 146 and 147: weld reinforcement weld toe
- Page 148 and 149: 4 Welding Inspection
- Page 150 and 151: 4.2 TASKS PRIOR TO WELDING The impo
- Page 152: 4.2.1 Drawings, Codes, and Standard
- Page 157 and 158: i. Preheat requirements and accepta
- Page 159 and 160: Review requirements for the weldmen
- Page 161 and 162: 4.2.2.1 Quality control items to as
- Page 163 and 164: 4.2.3.1 Quality control items to as
- Page 169 and 170: 4.2.5 Welding Equipment and Instrum
- Page 171 and 172: Welding Equipment and Instruments
- Page 173 and 174: Heat Treatment and Pressure Testing
- Page 175 and 176: Materials
- Page 177 and 178: Materials
- Page 179 and 180: 4.2.8 Weld Preparation Confirm weld
- Page 181 and 182: 4.2.9 Preheat Confirm the preheat e
- Page 183: 4.3 TASKS DURING WELDING OPERATIONS
- Page 186 and 187: 4.3.2 Welding Parameters and Techni
- Page 188 and 189: 4.3.3 Weldment Examination Complete
- Page 190 and 191: In-process ferrite measurement
- Page 192 and 193: Schaeffer diagram
- Page 194 and 195: 4.4 TASKS UPON COMPLETION OF WELDIN
- Page 196 and 197: f. PMI of the weld, if required, an
- Page 198 and 199: Field hardness check
- Page 200 and 201: 4.4.2.2 Potential inspector actions
- Page 202 and 203: h. Temperature monitoring system ca
- Page 204 and 205: 4.4.4 Pressure Testing Verify press
- Page 206 and 207: 4.4.5 Documentation Audit Perform a
- Page 208 and 209: 4.6 NDE EXAMINER CERTIFICATION The
- Page 210 and 211: Sevan Driller II http://www.cosco-s
- Page 212: Sevan Driller I