9.2 MATERIALS IDENTIFICATION<br />
During welding inspection, the inspector may need to verify the conformance<br />
of the base material and filler metal chemistries with the selected or specified<br />
alloyed materials. This may include reviewing the certified mill test report,<br />
reviewing stamps or markings on the components, or require PMI testing. It is<br />
the responsibility of the owner/user to establish a written material verification<br />
program indicating the extent and type of PMI to be conducted. Guidelines for<br />
material control and verification are outlined in API RP 578.<br />
Keyword:<br />
Extents of PMI is Owner’s responsibility