9.2 MATERIALS IDENTIFICATION<br />

During welding inspection, the inspector may need to verify the conformance<br />

of the base material and filler metal chemistries with the selected or specified<br />

alloyed materials. This may include reviewing the certified mill test report,<br />

reviewing stamps or markings on the components, or require PMI testing. It is<br />

the responsibility of the owner/user to establish a written material verification<br />

program indicating the extent and type of PMI to be conducted. Guidelines for<br />

material control and verification are outlined in API RP 578.<br />

Keyword:<br />

Extents of PMI is Owner’s responsibility