06.08.2014 Views

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Gunung Stong State Park Preliminary Management Plan<br />

h. Facilities at Stong Resort<br />

Figure 4.8. Visitor Perception of Facilities at Stong Resort<br />

Upgrade to Cable-<br />

Car and Golf<br />

Course<br />

22%<br />

Dow ngrade<br />

2%<br />

Adequate<br />

41%<br />

Low Upgrade<br />

35%<br />

Facilities at<br />

Stong Resort<br />

Fifty-seven percent (57%) of those surveyed felt that a general upgrading was necessary at the<br />

Stong Resort, while 41% felt that the facilities were adequate. Only 22% wanted major<br />

upgrades such as a cable car or a golf course. Low upgrading refers to maintenance and<br />

repair of existing facilities, and not their expansion.<br />

i. Facilities at Baha Camp<br />

Adequate<br />

Low<br />

Upgrade<br />

Upgrade<br />

Downgrade<br />

Percentage 41 35 22 2<br />

Figure 4.9. Visitor Perception of Facilities at Baha Camp<br />

Dow ngrade<br />

25%<br />

Others<br />

2%<br />

Adequate<br />

54%<br />

Upgrade<br />

19%<br />

50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!