06.08.2014 Views

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

FINAL VERSION FOR APPROVAL - Sdn Bhd - WWF Malaysia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Gunung Stong State Park Preliminary Management Plan<br />

of salaries (and overtimes, and claims), utilities, rentals, maintenance, and fuel expenses.<br />

Table 6.5 below contains the estimated capital and development budget for GSSP for the first<br />

three years of operations. The figures provided are only indicative but should help the park<br />

management in drawing up their development and operating budgets.<br />

Table 6.5: Estimated Capital and Development Budget for GSSP (Years 1-3)<br />

No. Item Description RM<br />

1 Office equipment Furniture, desktops, cabinets, stationery, for GSSP<br />

office.<br />

2. Two 4WD vehicles For use in logistics, boundary patrol and transport to<br />

HQ.<br />

3. Directional signposts To be placed at trail junctions, and river crossings, to<br />

avoid getting lost. 50 units @ RM1,000 each (includes<br />

cost of porters and labour for erecting them).<br />

4. Destination<br />

signposts<br />

To be placed at every 500m intervals, along trails,<br />

indicating distance to next campsite or summit. 100<br />

units @ RM1,500 each (includes porterage and labour).<br />

5. Summit signposts To be placed on seven summits: G. Ayam, G. Stong, G.<br />

Tera, G. Che Tahir, G. Birut, G. Menyelit, and montane<br />

wetland. 7 units @ RM2,000 each (include porterage<br />

and labour for installation).<br />

6. Warning signposts To be placed at Stong Resort, Baha Camp, entrance to<br />

Semuliang Trail, Lata Kertas, campsites, and selected<br />

boundary areas. 20 units @ RM1,000 each (inclusive of<br />

porterage and labour for installation)<br />

7. Huts at Baha Camp The 10 existing huts at Baha Camp should be improved<br />

with better material, and basic huts should be<br />

constructed at campsites and summits for shelter. 30<br />

units (12 at Baha Camp, 7 at summits, and 11 at<br />

campsites, at RM10,000 each (include porterage and<br />

labour).<br />

20,000<br />

180,000<br />

50,000<br />

150,000<br />

14,000<br />

20,000<br />

300,000<br />

TOTAL 684,000<br />

The estimated annual operating costs for GSSP are presented in Table 6.6.<br />

Table 6.6: Estimated Annual Operating Costs for GSSP<br />

No. Item Description RM<br />

1. Salary and emolument for Park<br />

Officer (G44)<br />

2. Salary and emoluments for 2 Asst.<br />

Park Officers (G27).<br />

3. Salary and emoluments for 2 Park<br />

Rangers (G17).<br />

4. Salary and emoluments for 6 Asst.<br />

Park Rangers (G11).<br />

5. Salary and emoluments for 2<br />

drivers (R3)<br />

6. Fuel and motor vehicle<br />

maintenance for 2 4WD.<br />

At RM4,000 per month. 48,000<br />

At RM2,500 each per month. 60,000<br />

At RM2,000 each per month. 48,000<br />

At RM1,500 each per month. 72,000<br />

At RM1,000 each per month. 24,000<br />

At RM1,000 per month each<br />

for 12 months<br />

24,000<br />

76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!