Otonabee River Bridge<br />
Retaining Wall Repair
TSW<br />
Parks Canada<br />
Township<br />
of<br />
Selwyn<br />
MNR<br />
Site<br />
Multiple jurisdictions<br />
Transport<br />
Canada<br />
ORCA<br />
OPG
Property ownership
Ownership
Design
Design<br />
Barrier<br />
Wall
Construction<br />
- work is anticipated to be performed from top of embankment<br />
- remove scrub brush from embankment<br />
- excavate dry stone wall from embankment<br />
- coordination with TSW Water Control Manager & OPG<br />
- dewater at the toe of embankment<br />
- form and pore concrete footing and pad; match existing footing<br />
and match old bridge abutment<br />
- form and pore cast-in-place concrete wall<br />
- backfill and restore embankment<br />
Note: closure of one traffic lane will be fully dependant on the site<br />
conditions that could be encountered when construction begins. The<br />
stability of the embankment is to be confirmed by the contractor.
Questions/comments<br />
Peter Nielsen, C.E.T.<br />
Manager of Technical Services<br />
705-775-2737 ext. 322<br />
pnielsen@county.peterborough.on.ca