BRIDGE AND ROOF CO. (INDIA) LIMITED - Infraline
BRIDGE AND ROOF CO. (INDIA) LIMITED - Infraline
BRIDGE AND ROOF CO. (INDIA) LIMITED - Infraline
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (<strong>INDIA</strong>) <strong>LIMITED</strong><br />
(A Government of India Enterprise)<br />
2/1, RUSSEL STREET,<br />
KANKARIA CENTRE<br />
5 TH FLOOR<br />
KOLKATA - 700071<br />
5 th July 2007<br />
1
<strong>CO</strong>MPANY PROFILE<br />
2
THE <strong>CO</strong>MPANY<br />
Bridge & Roof is a multidisciplinary engineering construction company having maintained its<br />
growth and profitability against stiff competition from Public as well as Private Sector<br />
Companies. Established in 1920, through last 87 years, Bridge & Roof has grown into a<br />
premier multi-disciplinary Engineering and Construction Organization in India as well as rest<br />
of South East Asia. Its activities include Civil Construction, Mechanical Construction,<br />
Tankage, Piling, Roads and Highways, EPC/Turnkey Contracts, Laying of Cross Country<br />
Pipelines, etc. It also has a workshop at Howrah, West Bengal engaged in Structural<br />
Fabrication, Manufacture of Bailey Bridges, Containers and Wagons, etc. Today, Bridge &<br />
Roof is one of the leading and most versatile construction organization in the the country with<br />
high degree of expertise and substantial in-house resources both in dedicated man-power and<br />
modern equipment and machinery.<br />
As on May’07 the company is executing 110 numbers of orders at around 50 different work<br />
locations all over India.<br />
3
Civil<br />
• Area Grading<br />
• Piling, Soil Densification<br />
• Sub-structure & Super-structure<br />
for Major Industrial Projects<br />
• High-Rise & Industrial Buildings<br />
• Chimneys, Prilling Towers and<br />
Silos<br />
• Concrete Road Bridges and<br />
Flyovers<br />
• Airport Terminals and Runway<br />
• Ports and Jetties<br />
Mechanical<br />
• Crude & Product Storage Tanks<br />
• Piping<br />
• Equipment Erection<br />
•Blast Furnace<br />
• Heaters and Reformers<br />
• Stainless Steel Silo<br />
• Boiler Erection Work<br />
• Structural Steel Work<br />
– Industrial and Technological<br />
Structures<br />
– Pot and Pot Superstructure for<br />
Aluminium Plant<br />
– Flare Stack and Steel Chimney<br />
– Loading Gantry<br />
– Steel Bridge (Railways /<br />
Roadways)<br />
– Space Frame Structure<br />
Construction<br />
Services<br />
LSTK /EPC /<br />
Turnkey Projects<br />
• Oil Terminals and Depots<br />
• Cross Country Piping<br />
• LPG and LNG Terminals<br />
• Ports and Jetties<br />
• Environmental Projects<br />
• Fire Fighting / Protection<br />
System<br />
• Combined Cycle Power<br />
Project<br />
• Heaters and Reformers<br />
• Cooling Towers<br />
• Retail and Jubilee Outlets<br />
Roads<br />
and<br />
Highways<br />
Major<br />
Areas of<br />
Business<br />
Plant<br />
Turnaround<br />
and Inspection<br />
Jobs<br />
Products<br />
At<br />
Howrah<br />
Works<br />
• Bailey Type Unit Bridge<br />
• Railway Wagon<br />
• All types of Light,<br />
Medium and Heavy Steel<br />
Structures<br />
• Steel Bridge Girders for<br />
Railways and Roads<br />
• Pressure Vessel and<br />
medium size Heat<br />
Exchanger<br />
• LPG Bullet Tank<br />
• Bunk House<br />
• Marine Freight Container<br />
• Truck Mounted Domestic<br />
Container<br />
4
<strong>CO</strong>RPORATE ORGANOGRAM<br />
BOARD OF DIRECTORS<br />
MANAGING DIRECTOR<br />
<strong>CO</strong>MPANY SECRETARY<br />
PROJECT DIVISION<br />
WORKS DIVISION<br />
FINANCE DIVISION<br />
<strong>CO</strong>RPORATE DIVISION<br />
DIRECTOR (PROJECT<br />
MANAGEMENT)<br />
DOMESTIC<br />
PROJECTS<br />
OVERSEAS<br />
PROJECTS<br />
CIVIL<br />
MECHANICAL<br />
TURNKEY<br />
ROADS &<br />
HIGHWAYS<br />
EAST<br />
WEST<br />
NORTH<br />
SOUTH<br />
MARKETING<br />
MANUFACTURING<br />
DESIGN &<br />
ENGINEERING<br />
MARKETING<br />
EXECUTION<br />
DIRECTOR<br />
(FINANCE)<br />
FINANCE<br />
AC<strong>CO</strong>UNTS<br />
TAXATION<br />
PERSONNEL<br />
MANAGEMENT<br />
SERVICES<br />
INTERNAL<br />
AUDIT<br />
VIGILANCE<br />
DESIGN &<br />
ENGINEERING<br />
<strong>CO</strong>MMERCIAL<br />
SECTION<br />
PROCUREMENT<br />
<strong>CO</strong>NTRACTS<br />
RESEARCH &<br />
DEVELOPMENT<br />
LEGAL AFFAIRS<br />
5
GROWTH STRATEGY<br />
6
TURNOVER<br />
The company has registered a turnover of Rs. 610.44 Crores<br />
during 2006-07 thereby achieving a growth of 20% over the<br />
last year’s performance i.e. Rs. 510.32 Crores.<br />
7
PROFIT BEFORE TAX (PBT)<br />
The Company has earned a Profit Before Tax of Rs. 7.09<br />
Crores in 2006-07 against Rs. 3.11 Crores during 2005-06<br />
which is more than double over last year’s performance.<br />
8
THE <strong>CO</strong>MPANY<br />
Major Sectors of<br />
Business Operations<br />
Areas of Specialization<br />
OTHERS<br />
15%<br />
RAILWAYS<br />
2%<br />
POWER<br />
21%<br />
ROAD<br />
4%<br />
NON-<br />
FERROUS<br />
2%<br />
FERROUS<br />
4%<br />
PETROCHEMI<br />
CALS<br />
7%<br />
OIL & GAS<br />
45%<br />
• Floating Roof Tanks<br />
• Steel and Concrete Bridges<br />
• Mechanized Construction of<br />
Highways<br />
• Railway Wagons<br />
• Bailey Type Unit Bridges<br />
Turnover : Rs. 610 Crores<br />
2006-2007<br />
9
MARKET SHARE<br />
10
ORDER BOOKING<br />
LAST FIVE YEARS ACTUAL <strong>AND</strong><br />
PROJECTION FOR NEXT THREE YEARS<br />
1500<br />
RS./CRORES<br />
1400<br />
1250<br />
1000<br />
1103<br />
950<br />
1150<br />
750<br />
500<br />
375<br />
568<br />
446<br />
709<br />
250<br />
0<br />
2002- 2003- 2004- 2005- 2006-<br />
03 04 05 06 07<br />
------------------------ Actuals ----------------------------<br />
2007-<br />
08<br />
2008-<br />
09<br />
2009-<br />
10<br />
-------------Projection---------------<br />
11
SECTORWISE ORDER BOOKING<br />
POWER<br />
24%<br />
OTHERS<br />
1%<br />
RAILWAYS<br />
5%<br />
NON-FERROUS<br />
1%<br />
FERROUS<br />
16%<br />
Orders Booked = Rs. 446 Crores<br />
2004-2005<br />
ROAD<br />
0%<br />
RAILWAYS<br />
10%<br />
PETRO-<br />
CHEMICALS<br />
3%<br />
OIL & GAS<br />
50%<br />
NON-FERROUS<br />
13%<br />
RAILWAYS<br />
1%<br />
OTHERS<br />
8%<br />
POWER<br />
24%<br />
FERROUS<br />
30%<br />
ROAD<br />
28%<br />
NON-FERROUS<br />
3% FERROUS<br />
1%<br />
PETROCHE-<br />
MICALS<br />
7%<br />
OIL & GAS<br />
28%<br />
Orders Booked = Rs. 709 Crores<br />
2005-2006<br />
OTHERS<br />
18%<br />
POWER<br />
1%<br />
OIL & GAS<br />
16%<br />
Orders Booked = Rs. 1103 Crores<br />
2006-2007<br />
PETROCHEMICA<br />
LS<br />
12%<br />
12
CUSTOMER ORGANISATION<br />
13
MAJOR CLIENTS<br />
Domestic Clients & Their Engineering Consultants<br />
Orders in Hand<br />
Rs./Crores<br />
Public Sector 794 (62%)<br />
Private Sector 487 (38%)<br />
Total 1281 (100%)<br />
14
Steel Sector<br />
MAJOR CLIENTS<br />
Domestic Clients & Their Engineering Consultants<br />
Non-Ferrous Sector<br />
Steel Authority of India Ltd.<br />
Rashtriya Ispat Nigam Limited, Visakhapatnam Steel Plant.<br />
Bhusan Steel & Strips Limited.<br />
Tata Iron & Steel Co. Limited.<br />
Jindal Steel & Power Limited.<br />
Grasim Industries Limited, Vikram Ispat.<br />
Usha Ispat Limited.<br />
Malavika Steel Limited<br />
PWD / CPWD<br />
State Electricity Board<br />
Oil (Hydrocarbon)<br />
Sector<br />
Bharat Petroleum Corporation Ltd.<br />
Chennai Petroleum Corporation Ltd.<br />
Gas Authority of India Ltd.<br />
Hindustan Petroleum Corporation Ltd.<br />
Indian Oil Corporation Ltd.<br />
Indian Petrochemicals Corporation Ltd.<br />
Oil & Natural Gas Corporation Ltd.<br />
Haldia Petrochemicals Ltd.<br />
Indian Oiltanking Ltd.<br />
Mangalore Refineries & Petrochemicals Ltd.<br />
Petronet MHB Ltd.<br />
Reliance Group<br />
ESSAR Group<br />
Power Sector<br />
Bharat Heavy Electricals Ltd.<br />
Damodar Valley Corporation<br />
National Thermal Power Corporation<br />
Dept. of Atomic Energy, Govt. of India.<br />
Bhava Atomic Research Centre<br />
State Electricity Boards<br />
Engineering Consultants<br />
M. N. Dastur & Company (P) Ltd.<br />
Metallurgical & Engineering Consultants (I) Ltd.<br />
Engineers India Limited<br />
Development Consultants Pvt. Limited.<br />
Projects & Development India Limited.<br />
Tata Consultancy Services.<br />
Tata Consulting Engineers.<br />
Consulting Engineering Services.<br />
Kothari & Associates.<br />
STUP Consultants Pvt. Ltd.<br />
Desien Pvt. Limited<br />
National Hydro Electric Power Corporation.<br />
Sterlite Industries Ltd.<br />
National Aluminium Co. Ltd.<br />
Indian Aluminium Company Ltd (HINDAL<strong>CO</strong>)<br />
Others<br />
Associated Cement Company<br />
Grasim Industries Ltd.<br />
ICI India Ltd.<br />
Orissa Cement Ltd.<br />
Airports Authority of India<br />
Cochin Shipyard Ltd.<br />
Delhi Metro Rail Corporation Ltd.<br />
Director General Border Roads<br />
Garden Reach Shipbuilders & Engineers<br />
Gujarat Narmada Valley Fertilizers Co. Ltd.<br />
Indian Farmers Fertilizer Co-operative<br />
Indian Railways<br />
IR<strong>CO</strong>N International Ltd.<br />
Kandla Port Trust<br />
Kolkata Port Trust<br />
National Fertilizers Ltd.<br />
National Highways Authority of India<br />
Nuclear Power Corporation<br />
Delhi Metro Rail Corporation<br />
PWD / CPWD<br />
15
Overseas Clients<br />
MAJOR CLIENTS<br />
TAISEI Corporation, Japan<br />
Mill Ltd., Nepal<br />
Caltex, Dubai<br />
Development Consultants International Ltd., Hong Kong<br />
Embassy of India, Kathmandu, Nepal<br />
Her Britannic Majesty’s Dept. of Environment, U.K.<br />
Hetauda Cement Industries Ltd., Nepal<br />
His Majesty’s Govt. of Nepal, Ministry of Works and Transport<br />
Intertec Contracting A/C, Denmark<br />
Myanmar Oil Corpn., Burma<br />
Ministry of Electricity and Water, Al Bucheeri Industrial Services, Abu Dhabi, U.A.E<br />
Bahrain Petroleum Co., Bahrain<br />
Butwal Spinning Govt. of Kuwait<br />
Ministry of Housing and Construction, Iraq<br />
Ministry of Municipalities, Iraq<br />
Nepal Oil Corpn. Ltd., Nepal<br />
Penden Cement Authority Ltd., Bhutan<br />
Royal Govt. of Bhutan, Ministry of Communications<br />
State Electric Co. Ltd., Maldives<br />
State Fertilizer Mfg. Corpn. of Sri Lanka<br />
Swiss Govt. Directorate for Development Corpn., Switzerland<br />
CAITC, China<br />
16
VOLUME OF SALES<br />
17
VOLUME OF SALES<br />
IN IRS./MILLIONS<br />
YEAR 2002-2003 2003-2004 2004-2005 2005-2006 2006-2007<br />
SALES 3666 3936 4514 5065 6130<br />
18
TYPICAL PROJECT<br />
ORGANISATION<br />
19
TYPICAL SITE ORGANISATION CHART<br />
Controlling Dy. General Manager /<br />
Asst. General Manager<br />
(At Corporate / Zonal Office)<br />
Project Manager / Sr. Resident Manager<br />
Planning &<br />
Billing Engineer<br />
Resident<br />
Engineer<br />
(Civil Works)<br />
Resident<br />
Engineer<br />
(Strl. Steel Works /<br />
Equipment Erection)<br />
Resident<br />
Engineer<br />
(LP/HP Piping)<br />
Quality<br />
Control<br />
Engineer<br />
Maintenance<br />
Engineer<br />
Safety<br />
Officer<br />
Accountant<br />
Store<br />
Assistant<br />
Administration<br />
Site<br />
Engineers<br />
Site<br />
Engineers<br />
Site<br />
Engineers<br />
Quality<br />
Control<br />
Assistants<br />
Assistants<br />
Assistants<br />
Account<br />
Assistants<br />
Store<br />
Clerks<br />
Clerks,<br />
Typist,<br />
Durwan,<br />
Peon, etc<br />
Supervisors<br />
Supervisors<br />
Supervisors<br />
20
PROJECT MONITORING SYSTEM<br />
Urgent action, if needed, taken<br />
by Controlling Officer (in<br />
consultation with HOD if<br />
needed) and site advised for<br />
necessary action<br />
SITE REPORTS<br />
Various<br />
Weekly / Monthly<br />
Reports<br />
Corrective Actions to be taken<br />
communicated to the site<br />
<strong>CO</strong>NTROLLING<br />
OFFICER<br />
HOD<br />
At<br />
Head Office /<br />
Zonal Office<br />
MS DEPT<br />
At<br />
Head Office<br />
Compiles Report<br />
from all Sites<br />
Finance<br />
Dept.<br />
At Head<br />
Office<br />
Director (Finance)<br />
Director<br />
(Project Management)<br />
Managing Director<br />
21
PROJECT SCHEDULING<br />
<strong>AND</strong> PLANNING<br />
22
PROJECT PLANNING <strong>AND</strong> SCHEDULING<br />
Project Planning and Reviewing is a priority area of Project Implementation in the company.<br />
On time and within Cost Budget is the primary target during execution of projects.<br />
‣ Planning<br />
Defining Activities, Preparing a Work Breakdown Structure and co-ordination between tasks, preparing<br />
work schedules, assigning and allocating resources to the activities, determining project costs and<br />
developing an acceptable cost budget is worked out before the start of the project<br />
‣ Controlling<br />
Track work progress and actual costs, compare physical progress and costs to target, evaluate performance<br />
by updating the schedule on a regular basis and comparing it with the target plan, ensuring optimum<br />
utilization of resources, keeping record of actual work duration and cost. Analyze data via reports and<br />
graphs and take corrective measure if required to prevent time and cost overrun by readjusting the work<br />
schedule and resource allocation<br />
‣ Managing<br />
Communication between project team involved in the execution, controlling managers and management of<br />
the company and the client is of primary importance. Presenting timely and accurate information to the<br />
correct person who can take remedial measures keeps the project on target.<br />
23
EMPLOYEE STRENGTH<br />
The company has a strong reserve of qualified and experienced man-power for<br />
execution of construction projects. The company has on its roll 1443 numbers of<br />
permanent employees as on 01-06-2007. During the execution of specific projects,<br />
the company hires services of skilled and unskilled workforce, depending on the<br />
nature and duration of the project<br />
Permanent Employee Strength as on 01-06-2007<br />
Projects Howrah Works Total Company<br />
Officers 556 90 646<br />
Staff & Sub-Staff 443 92 535<br />
Workers 6 258 264<br />
TOTAL 1005 440 1445<br />
24
MAJOR EQUIPMENT RESOURCES<br />
Batching Plant and Truck Mixer<br />
Excavator-cum-Loader and Dumper<br />
Driven Pile Rig<br />
Batch Type<br />
Hot Mix Plant<br />
Tower Crane<br />
Crawler Crane<br />
Vibratory Road Roller<br />
Tandem Vibratory Road Roller<br />
Paver Finisher with Sensor<br />
Stone Crushing cum<br />
Screening Plant<br />
25
QUALITY MANAGEMENT<br />
Quality Policy<br />
It is the policy of B&R to identify customer needs and to ensure “Total Customer Satisfaction” through<br />
sustained endeavor by maintaining quality, delivery schedule and trouble free services.<br />
Quality Objectives<br />
To maintain control check points for all activities to preserve and enforce the established quality<br />
standards.<br />
To monitor quality order to provide a measure of the effectiveness of the total quality effort and<br />
to identify the areas requiring remedial quality planning and action.<br />
To encourage a continuing communication with the clients to assure that the established quality<br />
standards are as per requirements.<br />
To encourage a continuing exchange of quality experiences and recommendations between field<br />
and Head Office / Zonal Office operations.<br />
To maintain and motivate quality consciousness among all employees of the company by<br />
sponsoring technical management training and professional advancement programs.<br />
To ensure necessary environment and infrastructure at all required levels.<br />
26
ISO – 9001:2000<br />
ISO Certificate for Tanks<br />
ISO Certificate for<br />
Bailey Bridge & Wagons<br />
Bridge & Roof Co. (India) Ltd. is one of the<br />
very few construction companies whose<br />
storage tank construction has been accredited<br />
with ISO-9001:2000 certificate from M/s DNV,<br />
Holland With this high level of quality in tank<br />
construction, Bridge & Roof can easily be<br />
placed at par with any international company<br />
so far as quality is concerned.<br />
B&R has also been accredited<br />
with an ISO-9001:2000<br />
Certificate for Manufacture and<br />
Supply of Railways Wagons and<br />
Design, Manufacture and Supply<br />
of Bailey Bridge being<br />
manufactured at Howrah<br />
Workshop.<br />
27
SAFETY POLICY<br />
• Promotion and Development of Consciousness for Health, Safety,<br />
Environment and Fire Protection among all personnel working at<br />
Construction Projects.<br />
• Implementation of Health, Safety and Environmental System<br />
requirements through extensive and regular training and periodic<br />
compliance checks.<br />
• Regular safety meetings and updation programmes at project sites<br />
and offices involving workers and officers to develop, sustain and<br />
increase behavioural and attitudinal awareness towards safety.<br />
• To continuously check and improve upon the safety standards.<br />
• Maintaining all Documents and Records of safety meetings,<br />
Training and Implementation as per Construction Safety manual.<br />
• Ensuring safety during Design Engineering<br />
28
SPECIFIC EXPERIENCE<br />
IN <strong>CO</strong>NSTRUCTION<br />
OF<br />
THERMAL POWER PLANT<br />
29
CIVIL <strong>CO</strong>NSTRUCTION<br />
(Sub-structure including Piling &<br />
Superstructure)<br />
PILING (VARIOUS TYPE)<br />
T.G. POWER HOUSE, BOILER,<br />
BUNKER FOUNDATIONS & SUPER<br />
STRUCTURE<br />
OFFSITE & UTILITIES<br />
<strong>CO</strong>AL H<strong>AND</strong>LING PLANT<br />
E.S.P.<br />
<strong>CO</strong>OLING TOWER<br />
SWITCH YARD AREA<br />
TAILRACE OUT LET WORKS<br />
WORK AREAS<br />
MECHANICAL WORKS<br />
STRUCTURAL WORK (POWER<br />
HOUSE, BUNKER, <strong>CO</strong>AL<br />
H<strong>AND</strong>LING PLANT)<br />
ERECTION OF BOILER (NON<br />
PRESSURE PART, PRESSURE<br />
PART, ROTARY EQUIPMENTS,<br />
E.S.P.)<br />
FABRICATION & LAYING OF<br />
<strong>CO</strong>OLING WATER PIPE LINE<br />
SWITCH YARD ERECTION<br />
EQUIPMENT ERECTION<br />
RELATED TO HYDEL POWER<br />
PROJECTS (LIKE RADIAL GATE,<br />
EMBEDDED PART, TRASH ETC.)<br />
LP/ HP PIPE LINE<br />
ERECTION OF EQUIPMENT OF<br />
<strong>CO</strong>AL H<strong>AND</strong>LING PLANT<br />
CRITICAL PIPING OF BOILER<br />
WORK<br />
WATER TREATMENT PALNT<br />
30
MAJOR WORKS EXECUTED<br />
FOR<br />
THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
31
Sl.<br />
No.<br />
MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Description Owner Period Value<br />
( IRs / Million)<br />
1. Erection, Testing & Commissioning of<br />
various Hydro Mechanical Equipment<br />
2. Replacement of existing Kerosene Tank<br />
Roof Duct Plate (V1901A) at Manali<br />
3. Erection, Testing & Commissioning of<br />
Boiler Main at 1X210 MW Mejia TPS<br />
(Unit-IV) (6863 MT)<br />
4. Structural Steel Work in Boiler & Bunker<br />
Bay (Part-B) of 2X500 MW Units at<br />
Simhadri Thermal Power Station<br />
5. Structural Steel Work Fabrication &<br />
Erection Work for 2X500 MW Units<br />
Simhadri Thermal Power Station (7998<br />
MT)<br />
Tungabhadra Steel<br />
Products Ltd.,<br />
Tamilnadu Petroproducts<br />
Limited,<br />
Bharat Heavy Electricals<br />
Ltd.<br />
Bharat Heavy Electricals<br />
Ltd.,<br />
Simplex Concrete Piles (I)<br />
Ltd.,<br />
6. Fabrication, Erection & Painting of Bharat Heavy Electricals<br />
Structural Steel Work of Power House Ltd.<br />
Building (Unit - II) at 2X210 MW<br />
Bakreswar Thermal Power Project<br />
7. Fabrication, Erection of Structural Steel National Thermal Power<br />
Works Part-I (TG Bay, Deaerator bay, Corpn. Ltd.,<br />
Control Tower Bay) for Vindhyachal Super<br />
Thermal Power Project Stage-II (2 X 500<br />
MW) (14700 MT)<br />
2003-2006 18.68<br />
2004-2005 3.03<br />
2002-2004 57.15<br />
1999-2003 343.70<br />
1999-2000 84.09<br />
1997-2000 65.93<br />
1995-1998<br />
103.47<br />
32
Sl.<br />
No.<br />
MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Description Owner Period Value<br />
( IRs / Million)<br />
8. Structural Steel Works Package for<br />
Feroze Gandhi Unchahar Thermal Power<br />
Project, Stage-II (2 X 210 MW Units)<br />
(16000 MT)<br />
9. Detailing, Fabrication, Despatch &<br />
Erection of Structural Steel Work for Mill<br />
Bay for Mejia Thermal Power Station<br />
Unit-I,II & III (3 X 210 MW) (12800 MT)<br />
10. Fabrication & Erection of Structural Steel<br />
Work in Unit-V area (2X500 MW Stage) &<br />
Erection of TP-15 Structure (3800 MT)<br />
National Thermal<br />
Power Corpn. Ltd.<br />
Damodar Valley<br />
Corpn., Electricity<br />
Dept.,<br />
National Thermal<br />
Power Corpn. Ltd.<br />
1995-1998 112.81<br />
1993-1997 186.87<br />
1991-1993 25.75<br />
11.<br />
Site Fabrication & Erection of Structural<br />
steel Part-A (T.G. Bay, Deaerator Bay &<br />
Control Bay for Unit-IV)for Farakka Super<br />
Thermal Power Project Stage-II(2 X 500<br />
MW)(8000 MT)<br />
National Thermal<br />
Power Corpn. Ltd.<br />
1987-1992<br />
54.08<br />
12.<br />
Structural Fabrication & Erection Works<br />
of in connection with General Civil Works<br />
Part-II Package for Farakka Super<br />
Thermal Power Project Stage-II(2 X 500<br />
MW)<br />
National Thermal<br />
Power Corpn. Ltd.<br />
1988-1992<br />
20.43<br />
33
Sl.<br />
No.<br />
15.<br />
16.<br />
17.<br />
MAJOR WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Description Owner Period Value<br />
( IRs / Million)<br />
13. Supply,Fabrication & Erection of Structural<br />
Bunkers & Misc. Steelwork for Bokaro 'B'<br />
Thermal Power Station Unit-II & II I(2 X<br />
210 MW) (9340 MT)<br />
14. Supply, Fabrication & Erection of Structural<br />
Steelwork for Farakka Super Thermal<br />
Power Project Part-II(6400 MT)<br />
Supply,Fabrication & Erection of Structural<br />
Steelwork in T.G. & B.C. Bay & Floor<br />
Beams for Ramagundam Super Thermal<br />
Power Project Stage-I(3 X 200 MW)(6200<br />
MT)<br />
Supply,Fabrication & Erection of Structural<br />
Steelwork in Bunker Bay for Korba Super<br />
Thermal Power Project Stage-I(3 X 200<br />
MW)(6800 MT)<br />
Fabrication & Erection of Structural Steel<br />
for Thermal Power Station Stage - II (2 x<br />
200 MW) (7800 MT).<br />
Damodar Valley<br />
Corpn., Electricity<br />
National Thermal<br />
Power Corpn. Ltd.<br />
National Thermal<br />
Power Corpn. Ltd.,<br />
National Thermal<br />
Power Corpn. Ltd.,<br />
U.P. State Electricity<br />
Board<br />
1982-1990 18.91<br />
1981-1986 48.40<br />
1980-1981<br />
1979-1980<br />
1975-1979<br />
39.01<br />
33.90<br />
31.44<br />
34
OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Sl.<br />
No.<br />
7<br />
8<br />
Description Owner Period Value<br />
( IRs / Million)<br />
1 Piling Work (RCC Cast-in-situ Driven Piles and RCC Precast<br />
Piles)<br />
2 Main Civil Works for the Purulia Pumped Storage Project at<br />
Upper Dam, Lower Dam, Power Intake, Tailrace Outlet and other<br />
incidental works<br />
3 Pile Foundation Package-A for LILO of 400 KV D/C Dadri -<br />
Ballabgarh Transmission Line at Maharanibagh, New Delhi<br />
associated with Tata Hydro Electric Project<br />
4 Pile foundation package for River Crossing Locations for 400 KV<br />
D.C. Vishnuprayag - Mujaffarnagar Transmission line (Cast - in -<br />
situ Bored Pile, Dia - 1.0 M, Length - 35.0 M, Nos. - 51)<br />
5 Civil, Structural and Architectural Work of Chlorination Plant<br />
Building, Pipe/Cables Trestles including trestle foundations,<br />
miscellaneous foundations etc. for 1X210 MW Mejia TPS (Unit-<br />
IV) Project<br />
6 Civil, Structural and Architectural Work of Clarified Water Pump<br />
House, Clarified Water Storage Tank, DM make up water pump<br />
house, filtered water pump house, misc. foundations, etc. for<br />
1X210 MW Mejia TPS (Unit-IV) Project<br />
Civil, Structural & Architectural Construction Work for Ash<br />
Handling System of DVC Mejia Thermal Power Station Unit - IV<br />
(1 X 210 MW)<br />
Execution and Handing Over of Civil Works for 400 / 220 / 110<br />
KV Sub Station<br />
Hooghly Metcoke & Power<br />
Co. Ltd.<br />
DC Industrial Plant<br />
Services Pvt. Ltd.<br />
Bharat<br />
Ltd.<br />
Heavy Electricals<br />
2006-2007 79.43<br />
Taisei Corporation 2002-2006 303.69<br />
Power Grid Corporation of<br />
India Ltd.<br />
Power Grid Corpoartion of<br />
India Ltd.<br />
Bharat<br />
Ltd.<br />
Bharat<br />
Ltd.<br />
Heavy Electricals<br />
Heavy Electricals<br />
2005-2006 66.96<br />
2004-2005 33.48<br />
2003-2005 11.03<br />
2003-2005 6.56<br />
2003-2005<br />
2003-2005<br />
16.06<br />
89.60<br />
35
Sl.<br />
No.<br />
13<br />
14<br />
15<br />
OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Description Owner Period Value<br />
( IRs / Million)<br />
9 Civil, Structural and Architectural Work of Chlorination Plant<br />
Building, Pipe/Cables Trestles including trestle foundations,<br />
miscellaneous foundations etc. for 1X210 MW Mejia TPS (Unit-IV)<br />
Project<br />
10 Civil, Structural and Architectural Work of Clarified Water Pump House,<br />
Clarified Water Storage Tank, DM make up water pump house, filtered<br />
water pump house, misc. foundations, etc. for 1X210 MW Mejia TPS<br />
(Unit-IV) Project<br />
11 Civil, Structural & Architectural Construction Work for Ash Handling<br />
System of DVC Mejia Thermal Power Station Unit - IV (1 X 210<br />
MW)<br />
12 Construction of all Civil Works related to Piling and Foundation including<br />
supply of all materials except those proposed to be supplied by BHEL of<br />
4x30.5 MW GTG, 4x110 TPH HRSG & 2x235 TPH Utility Boilers of<br />
Integrated Power Project at IOCL Panipat Refine<br />
Civil, Structural & Architectural Work of Main Power House, Other<br />
Areas between Transformer Yard & Chimney Area and Design,<br />
Supply, Handling, Erection, Testing, Commissioning of Building<br />
Elevator at 1X210 MW Mejia TPS (Unit-IV)<br />
Civil works for Starter Ash Dyke Package for Talcher Super<br />
Thermal Power Project, Stage-II(4 x 500 MW) (Bidding Document /<br />
Specification No. : CS-4330-331-9)<br />
RTPS Unit - 7 - Civil & Structural works for Station Building at<br />
Raichur Thermal Power Station.<br />
Bharat<br />
Ltd.<br />
Bharat<br />
Ltd.<br />
Bharat<br />
Ltd.<br />
Heavy Electricals<br />
Heavy Electricals<br />
DC Industrial Plant<br />
Services Pvt. Ltd.<br />
Bharat<br />
Ltd.<br />
Heavy Electricals<br />
Heavy Electricals<br />
National Thermal Power<br />
Corpn. Ltd.<br />
Karnataka Power Corpn.<br />
Ltd.<br />
2003-2005 11.03<br />
2003-2005 6.56<br />
2003-2005 16.06<br />
2003-2005 188.31<br />
2002-2005<br />
2000-2003<br />
2000-2003<br />
217.96<br />
145.23<br />
342.72<br />
36
OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Sl.<br />
No.<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
25<br />
Description Owner Period Value<br />
( IRs / Million)<br />
16 Civil, Structural & Architectural Work for Ash Handling System of 1<br />
X 210 MW Unit#7, Stage - IV for Raichur Thermal Power Station<br />
17 Construction of Civil & Structural and Architectural works for GTG,<br />
HRSG, STG etc. at Valuthur 1 x 95 MW Combined Cycle Power<br />
Project (TNEB)<br />
Ground Improvement by Stone Columns for Left Side<br />
Embankment of Diversion Drain Package - A <strong>AND</strong> B<br />
Civil & Architectural Work of Power House Building (Unit II) at<br />
2X210 MW Bakreswar Thermal Power Project<br />
Construction of Grid Control Building at 400 / 220 / 33 KV Switch<br />
Yard at Bakreswar Thermal Power Project<br />
Civil works of foundation Part - I (Piling & Foundation) package for<br />
Feroze Gandhi Unchahar Thermal Power Project, Stage - II (2x210<br />
MW)<br />
Civil Works for 220 KV. Switchyard for 2X210 MW at Feroz Gandhi<br />
Thermal Power Project<br />
Construction of various structures, units building for Combined<br />
Cycle Power Project<br />
General Civil work Part - II package for Super Thermal Power<br />
Project Stage - II (2x500 mw units) (i/c Bore Cast - in - Situ Piling<br />
work)<br />
DC Industrial Plant<br />
Services Pvt. Ltd.<br />
Bharat<br />
Ltd.<br />
Bharat<br />
Ltd.<br />
Bharat<br />
Ltd.<br />
National Thermal Power<br />
Corpn. Ltd.<br />
Bharat<br />
Ltd.<br />
heavy Electricals<br />
18 Construction of Ash Bund for Bakreswar Thermal Power Project Bharat Heavy Electricals<br />
Ltd.<br />
National Thermal Power<br />
Corporation Ltd.<br />
Heavy Electricals<br />
Heavy Electricals<br />
Heavy Electricals<br />
Essar Projects Ltd.<br />
National Thermal Power<br />
Corpn. Ltd.<br />
2002-2003 29.55<br />
2001-2002 107.05<br />
1998-2002 207.19<br />
2001-2001<br />
1997-2001<br />
1997-1998<br />
1995-1998<br />
1996-1998<br />
1995-1996<br />
1988-1993<br />
27.63<br />
68.36<br />
27.05<br />
97.04<br />
18.70<br />
56.18<br />
92.60<br />
37
Sl.<br />
No.<br />
29<br />
30<br />
31<br />
32<br />
33<br />
34<br />
OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
General Civil works for 2X10 MW Captive Power Plant<br />
Description Owner Period Value<br />
( IRs / Million)<br />
26 Civil, Structural & Architectural Works for Construction of<br />
Circulating Water & Low Water Pump House Pipe Racks Time<br />
and Security Building and Fire Fighting Station & Road and<br />
Drainage System for 1x67.5 MW Units for Power Project<br />
27 Civil works for Coal Handling package for Super Thermal Power<br />
Project Stage - II (2x500 mw units)<br />
28 Construction of Civil works of Power House etc. for Bokaro 'B'<br />
Thermal Power Station Unit I, II & III of 210 MW each<br />
Civil works for Power House Complex for 2X10 MW Captive<br />
Power Plant<br />
Site Improvement Work Including Roads and Drains for 2X10 MW<br />
Captive Power Plant at Chinakuri<br />
Civil & Structural works i/c all equipment foundations in Turbo-<br />
Generator Bay of Main Station Building for Second Thermal<br />
Power Station(3 X 210 M.W. Units)<br />
Civil works in foundation for Main Power House, Boiler, ESP, CW<br />
Pump House, CW ducts, Machine Foundations & Superstructure<br />
of CW Pump House for 2 X 110 MW Thermal Power Station<br />
Civil works for Second Thermal Power Station-3 X 210 MW<br />
Units,Stage I-Circulating Water Sustem-Group 'A' -R.C.C.<br />
Pressure Tunnels<br />
Indian Aluminium Co.<br />
Ltd.<br />
National Thermal Power<br />
Corpn. Ltd.<br />
Dishergarh Power Supply<br />
Co. Ltd.<br />
Dishergarh Power Supply<br />
Co. Ltd.<br />
Dishergarh Power Supply<br />
Co. Ltd.<br />
Neyveli Lignite Corpn.<br />
Ltd.<br />
Bharat Heavy Electricals<br />
Ltd.<br />
Neyveli Lignite Corpn.<br />
Ltd.<br />
1990-1993 67.95<br />
1988-1992 90.29<br />
Damodar Valley Corpn. 1980-1991 225.67<br />
1989-1991<br />
1988-1990<br />
1988-1990<br />
1981-1986<br />
1980-1984<br />
1981-1984<br />
18.16<br />
13.30<br />
14.23<br />
51.60<br />
33.00<br />
67.50<br />
38
OTHER WORKS EXECUTED FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Sl.<br />
No.<br />
37<br />
38<br />
Description Owner Period Value<br />
( IRs / Million)<br />
35 Civil works for Kota Thermal Power Station Project<br />
(2X110 MW Units)<br />
36 Civil works in Foundation for 220/132 KV Substation,Grid<br />
Control Building,Transformer & Super<br />
Structure of Grid Control Building for 2X110 MW<br />
Thermal power Station<br />
Balance Civil works for Unit-V & VI in Thermal Power<br />
Station Expansion Stage-II Proj.<br />
Civil Works for Coal Handling Plant for Obra Thermal<br />
Power Station Extn. Stage-II & III<br />
Rajasthan State Electricity<br />
Board<br />
Orissa State Electricity Board<br />
U.P. State Electricity Board<br />
1979-1983 27.00<br />
Bharat Heavy Electricals Ltd. 1981-1982 17.00<br />
1979-1981<br />
1974-1978<br />
14.40<br />
37.20<br />
39
Sl.<br />
No.<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
MAJOR WORKS UNDER EXECUTION FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Description Owner Period Value<br />
( IRs / Million)<br />
1 Main Plant Civil Works and Phase-I for 2X330 MW Power Plant Adani Power Pvt. Ltd. 2006-2008 182.13<br />
2 Construction of Pre-Treatment Plant, Raw and CW Make-up Water<br />
System Package for Rihand Super Thermal Power Project Stage-II<br />
(2X500 MW) on Lumpsum Turnkey Basis<br />
3 Civil & Architectural Work for Main Plant Civil Package of 2 X 250 MW<br />
Unit V & VI at Mejia Thermal Power Station<br />
4 Civil Works in Main Plant Area of 2 X 250 MW Guru Hargobind<br />
Thermal Power Project (GHTP) Stage-II at Lehra Mohabbat, Bhatinda<br />
Erection, Testing & Commissioning of complete Boiler Unit No. 5 at<br />
1X250 MW Mejia TPS (15,772 MT)<br />
Civil, Architectural and Structural Steel Work of 2 X 210 MW<br />
Bakreswar Thermal Power Project Unit 4 & 5 (MP-3)<br />
Civil, Structural and Architectural Works for TG, Power Block Boiler,<br />
ESP and ESP Control Room, etc. for 1X500 MW Sanjay Gandhi<br />
Thermal Power Plant<br />
Civil, Architectural & Structural Work for Ash Handling System of<br />
Sanjay Gandhi T.P.P. 1X500 MW, Unit-5<br />
Erection, Testing & Commissioning of Boiler including structures,<br />
Pressure Parts, Non-Pressure parts, Electrostatic Precipitator,<br />
Rotating Machines, Piping etc. finish painting, assistance for<br />
conducting PG test up to handing over of Unit No. 6, 1X250 MW<br />
Civil, Architectural & Structural Steel works for Coal Handing Plant<br />
package of 2 x 250 MW Mejia TPP Unit - V & VI<br />
National<br />
Power<br />
Ltd.<br />
Thermal<br />
Corporation<br />
Simplex Concrete<br />
Piles (I) Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
United Conveyor<br />
Corp. (India) Pvt. Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
2002-2007 148.70<br />
2004-2008 300.00<br />
2004-2007 170.27<br />
2004-2007<br />
2005-2008<br />
2003-2007<br />
2005-2007<br />
2005-2007<br />
2005-2007<br />
108.00<br />
677.44<br />
1035.69<br />
42.45<br />
108.20<br />
347.06<br />
40
MAJOR WORKS UNDER EXECUTION FOR THERMAL POWER PLANTS IN <strong>INDIA</strong><br />
Sl.<br />
No.<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
Civil Works Pertaining to Coal & Coke Handling system<br />
Description Owner Period Value<br />
( IRs / Million)<br />
11 Erection, Testing & Commissioning of Boiler including Structures,<br />
Pressure Parts, Non Pressure Parts, Air Pre-Heater & Piping of 2 x<br />
210 MW, Unit - 4 & 5, Bakreswar<br />
Civil, Structural, Architectural & Finishing Work of BOP auxilliaries<br />
for 2X250 MW Unit# 1 & 2<br />
Main Civil Works for 2x45 MW CPP - Hooghly Metcoke Power Co.<br />
Ltd.<br />
Construction of all Civil, Steel Structure & Architecture works in main<br />
plant area and BOPs related to buildings and foundations including<br />
supply of all materials except those proposed to be supplied by<br />
BHEL for 2 X 125 MW Units at Barsingsar TPP of M/s.<br />
Execution and Handing over of Civil Works and Earthing Works for<br />
400 KV Substation<br />
Civil Work for Control Room for Weigh Bridge, First Aid Station,<br />
Worker's Canteen, Car Park, Cycle & Scooter Stand, Electrical Sub-<br />
Station with Outdoor Cable Trench & Local Control building<br />
Installation of Cast-in-situ Driven & Bored RCC Pile, Testing, Civil<br />
Foundation Works, Area Grading in compliance with Storm Water<br />
Drainage System including Dismantling of Existing Stairs / Steel<br />
Structures, etc. and other Misc.Civil Work for 1X250 MW Un<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Tata Projects Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Hooghly Met Coke &<br />
Power Co. Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
Hooghly Met Coke &<br />
Power Co. Ltd.<br />
Bharat Heavy<br />
Electricals Ltd.<br />
2005-2008 183.35<br />
2005-2007<br />
2006-2008<br />
2006-2009<br />
2006-2007<br />
2006-2007<br />
2006-2007<br />
2006-2007<br />
137.05<br />
117.64<br />
547.36<br />
50.44<br />
120.50<br />
17.46<br />
124.14<br />
41
SELF ASSESSED CAPABILITY<br />
42
SELF ASSESSED EXECUTION CAPABILITIES IN SINGLE PROJECT<br />
KEY ACTIVITY<br />
(Including all other related activities & Ancillary activities)<br />
PER YEAR CAPACITY IN<br />
A SINGLE PROJECT<br />
MONTHLY<br />
CAPACITY<br />
(PEAK PERIOD)<br />
‣<strong>CO</strong>NCRETING (SUB-STRUCTURE & SUPER<br />
STRUCTURE)<br />
1,00,000 CUM 12,000 CUM<br />
‣FABRICATION & ERECTION OF STRUCTURAL<br />
WORKS<br />
25000 MT 2500 MT<br />
‣PIPING WORK OF VARIOUS THICKNESS & SIZES 10000 MT 800 MT<br />
Note: The capabilities may be augmented depends upon the magnitude of the work.<br />
43
PICTORIAL PRESENTATION<br />
OF<br />
SPECIFIC WORKS<br />
EXECUTED / UNDER EXECUTION<br />
FOR<br />
IMPLEMENTATION OF<br />
THERMAL POWER PLANT<br />
44
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Civil, Structural and Architectural<br />
Works for TG, Power Block Boiler,<br />
ESP and ESP Control Room etc. for<br />
1x500 MW Sanjay Gandhi Thermal<br />
Power Plant at BHEL, Birsinghpur<br />
45
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Erection, Testing & Commissioning of Boiler Main<br />
(130 MT at Elevation 56M) at 1x210 MW Mejia TPS<br />
(Unit-IV) of DVC<br />
46
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
29800 MT of Structural<br />
Steel work in Power House,<br />
Switch Yard and Mill Bay for<br />
Mejia Thermal Power<br />
Project of DVC<br />
View of Power House of Mejia<br />
Thermal Power Station of M/s.<br />
BHEL at Bankura, West Bengal<br />
47
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Electro Static Precipitator<br />
Structures - Structural Work in<br />
progress at Farakka for NTPC<br />
A view from the North East Side of<br />
the Track Hopper Raft below 12.0<br />
m from G.L. at Farakka Super<br />
Thermal Power Project for NTPC<br />
48
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Mill Bay Structure for NTPC<br />
Unchahar Super Thermal<br />
Power Station<br />
Power House Building Unit-I at<br />
NTPC Simhadri<br />
49
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Erection of 27M x 7.5M x<br />
6.5M Conveyor Gallery at a<br />
height of 70.0 M at NTPC<br />
Simahdri<br />
Switch Yard for Bakreswar Thermal<br />
Power Station<br />
50
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Structural Steel Work for<br />
Bakreswar Thermal Power<br />
Station for WBPDC<br />
Upper Dam Diversion Culvert Works<br />
for Purulia Pumped Storage Project<br />
for M/s. Taisel Corporation at<br />
Purulia, West Bengal<br />
51
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Tailrace Outlet Works for Purulia<br />
Pumped Storage Project for M/s.<br />
Taisel Corporation at Purulia, West<br />
Bengal<br />
Upper Dam Diversion Culvert Works<br />
for Purulia Pumped Storage Project<br />
for M/s. Taisel Corporation at<br />
Purulia, West Bengal<br />
52
Power Plant Constructed / Under Construction By<br />
<strong>BRIDGE</strong> <strong>AND</strong> <strong>ROOF</strong> <strong>CO</strong>. (I) LTD.<br />
Out Let Trash Rack Line 3-4 for<br />
Purulia Pumped Storage Project for<br />
M/s. Taisel Corporation at Purulia,<br />
under State Electricity Board, West<br />
Bengal<br />
Outside View of Cell of KARP<br />
Project at IGCAR, Kalpakkam<br />
53
VISION<br />
IN LINE WITH THE HUGE DEVELOPMENT <strong>AND</strong> INVESTMENT IN<br />
INFRASTRUCTURAL SECTOR, B&R IS <strong>CO</strong>MMITTED TO AGGRESSIVE GROWTH .<br />
THE MARKET SCENARIO FOR <strong>CO</strong>NSTRUCTION HAS PICKED UP <strong>AND</strong> THIS<br />
BOOM IS EXPECTED TO <strong>CO</strong>NTINUE FOR FEW MORE YEARS. IN ORDER TO<br />
TAKE ADVANTAGE OF THIS BOOM, B&R HAS AUGMENTED ITS RESOURCE<br />
BASE <strong>AND</strong> PLANS TO INCREASE ITS TURNOVER TO MORE THAN RS. 2,500<br />
CRORES BY THE YEAR 2015.<br />
VISION OF B&R IN THE ERA OF GLOBALIZATION <strong>AND</strong> LIBERALIZATION IS<br />
TO EMERGE AS A LEADER IN <strong>CO</strong>NSTRUCTION <strong>AND</strong> PROJECT MANAGEMENT<br />
SERVICES IN <strong>INDIA</strong> <strong>AND</strong> SELECTED FOREIGN MARKETS <strong>AND</strong> PROVIDE<br />
LATEST TECHNOLOGY OF INTERNATIONAL ST<strong>AND</strong>ARD TO ITS CUSTOMERS<br />
<strong>CO</strong>UPLED WITH HIGHEST LEVEL OF CUSTOMER SATISFACTION THROUGH<br />
REQUISITE CUSTOMER SERVICE.<br />
54
VISION<br />
<strong>BRIDGE</strong> & <strong>ROOF</strong> <strong>CO</strong>. (I) LTD. IS KEEN TO AUGMENT IN VARIOUS <strong>CO</strong>RE<br />
SECTORS IN FUTURE.<br />
AUGMENTATION IN POWER SECTOR WILL BE ONE OF THE KEY FACTOR OF<br />
FUTURE EXPANSION.<br />
IDENTIFIED AREAS OF AUGMENTATION<br />
1) VARIOUS TYPES OF CIVIL WORKS IN HYDEL POWER PROJECT.<br />
2) FABRICATION, INSTALLATION, <strong>CO</strong>MMISSIONING OF HYDRO<br />
MECHANICAL & HYDRO ELECTRICAL EQUIPMENTS.<br />
3) FABRICATION & ERECTION OF TRANSMISSION/ DISTRIBUTION TOWER<br />
4) SUPPLY, PROCUREMENT, FABRICATION, ERECTION & <strong>CO</strong>MMISSIONING<br />
OF MATERIAL H<strong>AND</strong>LING SYSTEM.<br />
5) RAW WATER TREATMENT PLANT.<br />
55
VISION<br />
RESOURCE PLANNING IS ALSO ONE OF THE KEY FACTOR FOR<br />
AUGMENTATION.<br />
WE EXPECT TO INCREASE OF ABOUT 20% - 30% STAKE IN POWER SECTOR<br />
FROM THE PRESENT SCENARIO.<br />
TO INCREASE, WE ARE PLANNING TO AUGMENT THE VARIOUS RESOURCES<br />
IN TERMS OF MACHINERIES & MANPOWER.<br />
ADVANCED & HIGHER CAPACITY OF MACHINERIES, LIFTING TOOLS &<br />
EXPERIENCED <strong>AND</strong> DEDICATED MANPOWER <strong>CO</strong>MPRISING OF SUPERVISORY<br />
PERSONNEL, SKILLED MANPOWER HAVE ALREADY BEEN FOCUSED FOR<br />
AUGMENTATION .<br />
56
THANK YOU !<br />
57