By Shri Kapil Mantri, EA to Chairman, Jindal Steel & Power - Infraline
By Shri Kapil Mantri, EA to Chairman, Jindal Steel & Power - Infraline
By Shri Kapil Mantri, EA to Chairman, Jindal Steel & Power - Infraline
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NIO Option - 4<br />
The capacity and status of the end use plant and ERLPs shall be<br />
given weightage in the ratio of 20:80 for final ratings of the bids.<br />
• Upfront payment of the "Fixed Price Tag" fixed by MoC in five<br />
installments + ERLP quoted by the bidder in INR/<strong>to</strong>nne.<br />
• ERLP = <strong>to</strong>tal envisaged life time production (in <strong>to</strong>nnes) as per<br />
approved mine plan x per <strong>to</strong>nne rate (in INR) offered by the bidder<br />
• Highest 10 points <strong>to</strong> be given for the Highest capacity end use plant<br />
and proportionately for lesser capacities<br />
• Highest 10 points <strong>to</strong> be given for the end use plant which is<br />
complete and functioning and 5 points for plant under construction<br />
14<br />
Copyright © 2011 <strong>Jindal</strong> <strong>Steel</strong> & <strong>Power</strong> Ltd.