27.07.2014 Views

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX E2<br />

LOCAL PROPERTY PERFORMANCE INDICATORS<br />

The Council has adopted and measured the following Local Property Indicators:<br />

1. Gross Internal Area (GIA) <strong>of</strong> Surplus Buildings as a Percentage all Operational and<br />

Non Operational Buildings (excluding Schools and Housing)<br />

For 2005/06 the indicator achieved was 0.8%.<br />

2. Measures <strong>of</strong> Utilisation and Running Costs <strong>of</strong> Civic Centre:<br />

Year<br />

Total Cost<br />

Size Civic<br />

Centre (GIA)<br />

No. <strong>of</strong> Staff<br />

(Nov)<br />

Cost per<br />

sq .m<br />

Cost per<br />

Staff<br />

Actual 2003/2004 £4,724,766 (i) 24,825 1,610 £190.32 £2,934.64<br />

Actual 2004/2005 £5,040,729 27,272 (ii) 1,747 £184.83 £2,885.36<br />

Actual 2005/2006 £4,866,660 27,272 1,887 £178.00 £2,579.00<br />

Actual 2006/2007 £5,134,000 27,272 1,877 £188.00 £2,735.00<br />

Target 2007/2008 £4,951,000 27,272 2,027 £182 £2,443.00<br />

Notes<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

FM costs were reduced in 2003/04 to exclude telephone services, which were<br />

transferred to the Corporate Contact Centre on 1 st September 2004, and were then<br />

comparable on a like for like basis with 2004/05 and 2005/06.<br />

The Civic Centre was re-measured in December 2004 and 2004/05 measurement now<br />

includes enlarged accommodation for Children’s Services in the Mezzanine <strong>of</strong>fices<br />

and also some areas not been previously included.<br />

A Best Value Review <strong>of</strong> Facilities Management Services was reported to Cabinet on<br />

28 th April 2005. In a benchmarking exercise involving two other <strong>London</strong> <strong>Borough</strong>s,<br />

<strong>Hillingdon</strong> had the lowest Civic Centre FM cost per employee and the second lowest<br />

cost per square metre.<br />

LBH originally set a target <strong>of</strong> 2017 staff to be in the building for 2006/07. However,<br />

despite successfully relocating 100 staff from 2 sites towards this target, there was in<br />

fact a net reduction <strong>of</strong> 10 staff in the Civic Centre between November 2005 and<br />

November 2006 due to the budget position <strong>of</strong> the Council which required significant<br />

revenue reductions and a managed vacancy factor.<br />

41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!