PPI 4 A, B, C & D<br />

A Repair and maintenance costs per m 2 GIA<br />

£<br />

Actual 2002/03 5.27<br />

2003/04 8.0<br />

2004/05 7.25<br />

2005/06 6.75<br />

Target 2006/07 7.5<br />

The Council is taking the maintenance backlog very seriously and through a<br />

combination <strong>of</strong> capital and revenue budgets, asset disposals and site rationalisations<br />

the backlog should start to diminish. The new revenue maintenance budget will<br />

enable minor repairs to be managed at an early stage before they become more<br />

serious and expensive.<br />

B Energy Costs per m 2 GIA (gas and electricity – no oil, or solid fuel used)<br />

£<br />

Actual 2002/03 8<br />

2003/04 8.6<br />

2004/05 11.59<br />

2005/06 19.58<br />

Target 2006/07 34.26<br />

The 100kW plus electricity contract is to be tendered during 2007 to ensure a start<br />

date <strong>of</strong> the new contract for 1 st November 2007. The overall increase in prices<br />

following the last tender round in 2005 was 42.3% (range between 22.9% & 53.6%).<br />

Prices are more stable currently but a future forecast <strong>of</strong> anticipated increase at the<br />

time <strong>of</strong> tendering is still 20%.<br />

The remaining electricity contracts were tendered during 2006 to give a start date <strong>of</strong><br />

1 st October 2006 and came in at an average <strong>of</strong> 80% above the prices previously<br />

obtained, an indication <strong>of</strong> the volatility <strong>of</strong> the electricity market at that time. It was<br />

anticipated that the prices would be in the order <strong>of</strong> 60 % higher.<br />

Both Gas contracts were tendered during 2006 with a start date <strong>of</strong> 1 st November<br />

2006. A 75% increase was anticipated but an overall average increase <strong>of</strong> 65.42%<br />

was realised, the range <strong>of</strong> increase being 41.6% - 90.2%.<br />

C Water Costs per m 2 GIA<br />

£<br />

Actual 2002/03 1.36<br />

2003/04 1.34<br />

2004/05 1.50<br />

2005/06 1.98<br />

Target 2006/07 2.02<br />

Three Valleys Water PLC, the water supplier that supplies water to 99.9% <strong>of</strong> LBH<br />

properties, has published a monitoring plan, which includes a pricing strategy for the<br />

period 2004 – 2010. The proposed increase in prices for the forthcoming period<br />

2007/08 is +1.5%<br />

D CO 2 Emissions in terms <strong>of</strong> carbon dioxide per m 2<br />

Actual 2003 0.093<br />

2004 0.0826<br />

2004/05 0.0775<br />

2005/06 0.0700<br />

Target 2006/07 0.0693<br />