COMPLETED PROJECTS<br />

Project Project Sponsor Project Manager Officer Team Project Initiation<br />

Document (PID)<br />

Re-opening <strong>of</strong> 2 C Norman D Jones<br />

PID in place<br />

T O’Neill<br />

traditional Public<br />

Conveniences<br />

(Pg 15 Para 5)<br />

Refurbishment <strong>of</strong> the<br />

Kings College sports<br />

pavilion in Ruislip<br />

Increased Civic Centre<br />

Utilisation<br />

(Pg 10 Pt 3.2.1)<br />

HIP Flexible Working<br />

(Pg 10 Pt 3.2.1)<br />

G Edwards<br />

E Nicholson<br />

D Bryant<br />

G Kelly<br />

G Morrison.<br />

T Buadu<br />

G Edwards S Smith R Bearpark<br />

S Smith<br />

PID in place<br />

Joint PID in place<br />

(FM & CIT one)<br />

Proposed Action<br />

Timescale<br />

Cabinet agreed to reopen two traditional toilet Completed<br />

blocks in Ruislip and Hayes to meet local needs.<br />

A complete refurbishment <strong>of</strong> the building is<br />

required. Two traditional toilet blocks in Ruislip<br />

and Hayes have been refurbished and reopened.<br />

.<br />

The complete refurbishment <strong>of</strong> the sports pavilion<br />

to provide 3 units <strong>of</strong> key worker housing, sports<br />

Completed<br />

changing facilities and a community hall. – the<br />

refurbishment was being managed by Property<br />

Services and has now been handed over to<br />

ECP. Further work is necessary to market the<br />

leases <strong>of</strong> available space on the ground Floor<br />

and 3 flats on the first floor. A report was been<br />

drafted to report to cabinet in October 2006<br />

seeking authority to negotiate a lease <strong>of</strong> the three<br />

flats to a RSL who would then sublet the flats on<br />

assured shorthold tenancies for key workers.<br />

Negotiations currently in progress with Housing<br />

Association.<br />

Space allocation is being re-planned throughout Completed January<br />

the Civic Centre on a reduced allocation <strong>of</strong> 6.252006<br />

sq. m. per person. This, allied to introduction <strong>of</strong><br />

hot desking and home working, is intended to<br />

raise occupancy levels to 2,000 staff by March<br />

2006. This will provide accommodation for the<br />

staff relocations from 855 Uxbridge Road,<br />

<strong>Hillingdon</strong> and Harlington Road Depot.<br />