The key issues and proposals for the Council arising from the Plan are:<br />

• A maintenance backlog for 2006/07 has been identified <strong>of</strong> approximately £23.5 million (<strong>of</strong><br />

which approximately £6.17 million relates to the Civic Centre). The issue <strong>of</strong> how this can be<br />

and will be addressed is a major theme <strong>of</strong> the Property Asset Strategy. It is anticipated that<br />

the overall maintenance backlog is initially likely to rise due to additional works becoming<br />

necessary before falling in future years as the impact <strong>of</strong> measures being taken to reduce the<br />

backlog take full effect. Whilst the General Fund maintenance backlog is steadily falling,<br />

more information is now available (after detailed surveys) on the Civic Centre and town<br />

centre car parks (Cedar & Grainges). This has now been factored into the overall<br />

maintenance backlog projections which have increased as a result.<br />

• Space utilisation in the Civic Centre is improving with the aim <strong>of</strong> increasing occupancy to<br />

2027 by November 2007. Work is in progress for mobile workers spending the equivalent <strong>of</strong><br />

two days out <strong>of</strong> the <strong>of</strong>fice to share workstations with the objective to free approximately<br />

100 workstations. Negotiations have commenced with <strong>Hillingdon</strong> Primary Care Trust<br />

regarding the potential use <strong>of</strong> these premises during 2007/08.<br />

• The review <strong>of</strong> Social Services assets is continuing to lead to a number <strong>of</strong> proposals for<br />

change including possible closure <strong>of</strong> a number <strong>of</strong> outdated buildings and the modernisation<br />

<strong>of</strong> residential care provision for people with learning disabilities through a significantly<br />

increased community based range <strong>of</strong> accommodation services.<br />

• Proposals are almost completed for a new leisure development at <strong>Hillingdon</strong> House Farm<br />

including refurbishment <strong>of</strong> the listed open-air pool with an initial estimated cost <strong>of</strong> between<br />

£19-25 million dependent on size <strong>of</strong> pool. Cabinet will be informed in April 2007 <strong>of</strong> the final<br />

cost.<br />

• Proposals are also being developed for community leisure facilities in Hayes including a 25m<br />

pool, Health and Fitness Centre and inclusion <strong>of</strong> a library, with a total estimated cost <strong>of</strong> £14<br />

million.<br />

• A programme <strong>of</strong> refurbishment <strong>of</strong> branch libraries is continuing in parallel with improvements<br />

in accessibility in accordance with DDA requirements.<br />

• An allotment strategy has been agreed with the <strong>Hillingdon</strong> Allotments and Horticultural<br />

Federation, which has already led to the rationalisation <strong>of</strong> two under-utilised sites for<br />

disposal linked to a programme <strong>of</strong> improvements for remaining sites.<br />

• A car parks asset review has been undertaken by <strong>of</strong>ficers for the Property and<br />

Accommodation Strategy Group (PASG) and the review is considering any potential for<br />

development on or over parts <strong>of</strong> car parks to provide additional housing.<br />

• The Housing Development Team is undertaking a review <strong>of</strong> the HRA portfolio <strong>of</strong> £688 million<br />

to identify any opportunities for development in liaison with Corporate Property Services and<br />

other services. This is expected to lead to recommendations as to better asset utilisation. A<br />

number <strong>of</strong> small sites have been identified which may have some potential for development<br />

or alternative use. These sites warrant further detailed investigation.<br />

• The Council as a whole has recently had a CPA assessment for 2006 and shows that the<br />

council has improved three quarters <strong>of</strong> its key performance indicators, which is above the<br />

national average, additionally Housing services improved their rating to become a four star<br />

service overall, having also maintained their four stars for the benefits service and in the<br />

area <strong>of</strong> environment a rating <strong>of</strong> three stars has been achieved (previously two stars).<br />

• Appendix C sets out the results <strong>of</strong> <strong>Hillingdon</strong>’s CPA (Use <strong>of</strong> Resources) assessment in 2006.<br />

The Council maintained level 3 in 2005/06. This score <strong>of</strong> 3 was maintained when last<br />

reviewed in November 2006 by the Audit Commission. The actions necessary to achieve<br />

Level 4 (the highest level) have been identified in the Appendix. For asset management the<br />

areas identified for improvement opportunities are :<br />

a) A maintenance plan to address the significant maintenance backlog for the Council’s<br />

assets.<br />

b) Ensuring external benchmarking is conducted with meaningful results communicated<br />

to stakeholders.<br />