27.07.2014 Views

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Best Value Performance Indicators - Quarter 3<br />

Appendix D<br />

PI REF NO DEFINITION TARGET Q1 Q2 Q3 Q4<br />

BV215a<br />

BV215b<br />

BV218a<br />

BV218b<br />

BV106*<br />

The average number <strong>of</strong> days<br />

taken to repair a street lighting<br />

fault, which is the under the<br />

control <strong>of</strong> the local authority<br />

The average number <strong>of</strong> days<br />

taken to repair a street lighting<br />

fault, where response time is<br />

under the control <strong>of</strong> a<br />

Distribution Network Operator<br />

(DNO)<br />

Percentage <strong>of</strong> new reports <strong>of</strong><br />

abandoned vehicles<br />

investigated within 24hrs <strong>of</strong><br />

notifications<br />

Percentage <strong>of</strong> abandoned<br />

vehicles removed within<br />

24hours from the point at<br />

which the authority is legally<br />

entitled to remove the vehicle<br />

Percentage <strong>of</strong> new homes built<br />

on previously developed land<br />

Director's<br />

Forecast<br />

for Year<br />

End<br />

Comments<br />

Outturn<br />

04/05 in<br />

Quartile<br />

04/05<br />

3 1.74 1.17 1.16 n/a 1<br />

30 36.39 37.9 43.27<br />

This figure is for 82 defects and is<br />

outside the control <strong>of</strong> the authority.<br />

Outturn<br />

05/06 in<br />

Quartile<br />

05/06<br />

n/a 2<br />

99.90% 100.00% 100.00% 100.00% n/a 1<br />

99.90% 100.00% 100.00% 100.00% n/a 1<br />

95.00% 100.00% 100.00% 100.00% 1 1<br />

BV109a*<br />

Percentage <strong>of</strong> major planning<br />

applications determined within<br />

13 weeks<br />

70.00% 76.90% 69.80% 68.80%<br />

Above the National target but below<br />

our local target but because <strong>of</strong> small<br />

numbers expected to be above<br />

target for the end <strong>of</strong> the year.<br />

1 2<br />

BV109b*<br />

Percentage <strong>of</strong> minor planning<br />

applications determined within<br />

8 weeks<br />

76.00% 76.20% 73.90% 73.00%<br />

Above the National target but below<br />

our local target, by three points,<br />

being monitored, drop due in part to<br />

planned clearance <strong>of</strong> old applications<br />

& fluctuations in volume.<br />

2 3<br />

ITEM 06 council plan appendices.xls 66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!