Best Value Performance Indicators - Quarter 3<br />

Appendix D<br />

PI REF NO DEFINITION TARGET Q1 Q2 Q3 Q4<br />

BV82b(ii)<br />

Tonnage <strong>of</strong> household waste<br />

composted<br />

Percentage <strong>of</strong> the total<br />

BV82a & b tonnage <strong>of</strong> household waste<br />

(as per CPA) arisings which have been<br />

recycled or composted<br />

Number <strong>of</strong> kilograms <strong>of</strong><br />

BV84a* household waste collected per<br />

head <strong>of</strong> the population<br />

BV86<br />

BV91b*<br />

Cost <strong>of</strong> household waste<br />

collection<br />

Percentage <strong>of</strong> households<br />

resident in the authority's area<br />

served by kerbside collection<br />

<strong>of</strong> recyclables (two<br />

recyclables)<br />

16,020.00 5,557.00 9,571.00 12883<br />

30.50% 32.00% 30.70% 30.30%<br />

515 139.7 265.7 381.2<br />

£52.00 £62.14 £59.90 £58.93<br />

BV100 Temporary Road closures 1.7 1 2.3 3.1<br />

BV165*<br />

The percentage <strong>of</strong> pedestrian<br />

crossings with facilities for<br />

disabled people, as a<br />

proportion <strong>of</strong> all crossings in<br />

the local authority area<br />

Director's<br />

Forecast<br />

for Year<br />

End<br />

Comments<br />

Above target but these are the better<br />

months, tonnages could drop in the<br />

fourth quarter.<br />

BV82a+b - End <strong>of</strong> year projection<br />

based on the first 9 months is 29.5% -<br />

an improvement on last month which<br />

was 29.4%%.<br />

BV84 - Has improved by 18.51kgs<br />

compared to the same period last<br />

year.<br />

Cost <strong>of</strong> waste collection per<br />

household. Figure still includes<br />

Contact Call centre costs. Reduction<br />

due to reported forecast saving on<br />

month 6 monitoring exercise. Still<br />

forecast to be Green.<br />

Outturn<br />

04/05 in<br />

Quartile<br />

04/05<br />

Outturn<br />

05/06 in<br />

Quartile<br />

05/06<br />

N/A 1<br />

N/A<br />

N/A<br />

4 4<br />

3 3<br />

100% 100% 100% 100.00% 1 1<br />

100.00% 83.00% 83.00% 87.60%<br />

A significant factor this year has<br />

been the construction <strong>of</strong> the new<br />

roundabout on Stockley Road. (182<br />

days out <strong>of</strong> a total <strong>of</strong> 370 in the first<br />

six months)<br />

Programme <strong>of</strong> works in place to<br />

achieve 100% by March 2007. Work<br />

due to start in October on those<br />

crossings that do not meet the<br />

current standards.<br />

4 4<br />

4 3<br />