Supplementary A - London Borough of Hillingdon
Supplementary A - London Borough of Hillingdon
Supplementary A - London Borough of Hillingdon
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Last Amended: 15 January 2007 Council Plan 2006 Appendix A<br />
Ref No. Key Objective Task<br />
(Short Term Target)<br />
Corporate<br />
Director to<br />
end Sept<br />
Lead<br />
Officer<br />
Key Actions Sub Key Actions Target<br />
Dates<br />
Key Actions<br />
Completed<br />
Progress Comment<br />
9 A safe borough Make our car parks more<br />
secure by continuing<br />
our programme to upgrade<br />
them including<br />
lighting, signage, and<br />
CCTV to make them more<br />
secure for users.<br />
PB RC Improvement works have been<br />
undertaken and completed at<br />
15 <strong>of</strong> the council's surface car<br />
parks and these car parks<br />
have received national<br />
ParkMark, Safer Parking,<br />
awards.<br />
1) The remaining 10 surface<br />
car parks and the Cedars and<br />
Grainges multi-storey car<br />
parks are being formally<br />
reviewed, in conjunction with<br />
the ParkMark Architectural<br />
Liaison Officer, to ascertain<br />
the extent <strong>of</strong> the works that will<br />
be required to bring them up to<br />
ParkMark standard.<br />
2) A separate study will be<br />
undertaken to consider the<br />
feasibility <strong>of</strong> extending the<br />
Uxbridge multi-storey car<br />
parks.<br />
1) 12/06<br />
2) 3/07<br />
2) Yes 1/07 update.<br />
(1) The review <strong>of</strong> non<br />
"ParkMark" car parks has<br />
commenced with two main<br />
multi-storey car parks<br />
already being formally<br />
reviewed. Background<br />
usage and crime data is<br />
currently being gathered in<br />
preparation for site reviews<br />
to be undertaken in<br />
conjunction with the<br />
ParkMark Architectural<br />
Liaison Officer (ALO) in the<br />
surface car parks later this<br />
financial year. These<br />
reviews have been delayed<br />
partly due to nonavailability<br />
<strong>of</strong> the ALO.<br />
Detailed plans are being<br />
drawn up to undertake<br />
ParkMark improvement<br />
works in Linden Avenue by<br />
June 2007.<br />
(2) Feasibility study<br />
completed and results<br />
reported to CMT. Further<br />
funding is required before<br />
this programme can be<br />
undertaken.<br />
ITEM 06 council plan appendices.xls<br />
Green - Completed/On Track<br />
Amber - Some Slippage<br />
Red - Serious Slippage 6