27.07.2014 Views

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

Supplementary A - London Borough of Hillingdon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Last Amended: 15 January 2007 Council Plan 2006 Appendix A<br />

Ref No. Key Objective Task<br />

(Short Term Target)<br />

Corporate<br />

Director to<br />

end Sept<br />

Lead<br />

Officer<br />

Key Actions Sub Key Actions Target<br />

Dates<br />

Key Actions<br />

Completed<br />

Progress Comment<br />

9 A safe borough Make our car parks more<br />

secure by continuing<br />

our programme to upgrade<br />

them including<br />

lighting, signage, and<br />

CCTV to make them more<br />

secure for users.<br />

PB RC Improvement works have been<br />

undertaken and completed at<br />

15 <strong>of</strong> the council's surface car<br />

parks and these car parks<br />

have received national<br />

ParkMark, Safer Parking,<br />

awards.<br />

1) The remaining 10 surface<br />

car parks and the Cedars and<br />

Grainges multi-storey car<br />

parks are being formally<br />

reviewed, in conjunction with<br />

the ParkMark Architectural<br />

Liaison Officer, to ascertain<br />

the extent <strong>of</strong> the works that will<br />

be required to bring them up to<br />

ParkMark standard.<br />

2) A separate study will be<br />

undertaken to consider the<br />

feasibility <strong>of</strong> extending the<br />

Uxbridge multi-storey car<br />

parks.<br />

1) 12/06<br />

2) 3/07<br />

2) Yes 1/07 update.<br />

(1) The review <strong>of</strong> non<br />

"ParkMark" car parks has<br />

commenced with two main<br />

multi-storey car parks<br />

already being formally<br />

reviewed. Background<br />

usage and crime data is<br />

currently being gathered in<br />

preparation for site reviews<br />

to be undertaken in<br />

conjunction with the<br />

ParkMark Architectural<br />

Liaison Officer (ALO) in the<br />

surface car parks later this<br />

financial year. These<br />

reviews have been delayed<br />

partly due to nonavailability<br />

<strong>of</strong> the ALO.<br />

Detailed plans are being<br />

drawn up to undertake<br />

ParkMark improvement<br />

works in Linden Avenue by<br />

June 2007.<br />

(2) Feasibility study<br />

completed and results<br />

reported to CMT. Further<br />

funding is required before<br />

this programme can be<br />

undertaken.<br />

ITEM 06 council plan appendices.xls<br />

Green - Completed/On Track<br />

Amber - Some Slippage<br />

Red - Serious Slippage 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!