26.07.2014 Views

GUIDE LINES - Central Water Commission

GUIDE LINES - Central Water Commission

GUIDE LINES - Central Water Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

i) The project provides for filling in the space reserved<br />

for flood control after the end of the specified flood<br />

season,<br />

ii) The filling of a portion or the flood space, subsequently<br />

agreed upon, is more or less on an ensured basis.<br />

It is requested that the manner of allocation of cost and the<br />

specific allocation suggested should be clearly indicated in the project<br />

reports which are sent to the Government of India for approval of the<br />

scheme.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!