Schedule of Quantity Anexure-I<br />
Name of Work: Construction of Third Phase of CR Masonry Boundary Wall including Check<br />
Posts/Watch Towers of 1.80 m height average from Ground Level & Barbed<br />
wire fencing on M.S. Angles over it in the <strong>IGRMS</strong>, Bhopal for total length app.<br />
500 Mt. Starting from the edge of existing constructed CR Masonry wall<br />
toward SAF Area.<br />
S.No. Particulars of Items Quantity Rate Amount<br />
1. Earth work in excavation by mechanical means<br />
(Hydraulic excavator)/ manual means in foundation<br />
trenches or drains (not exccding 1.5 m in width or 10<br />
Sqmt on plan) including dressing of sides and ramming<br />
of bottoms, lift upto 1.5 m, including getting out the<br />
excavated soil and disposal of surplus excavated soil as<br />
directed, within a lead of 50 m.<br />
207.26<br />
cum<br />
a) All kind of soil.<br />
2. Excavation work in foundation trenches or drains not<br />
exceeding 1.5m in width or 10 sqmt. on plan including<br />
dressing of sides and ramming of bottoms lift upto 1.5<br />
m, including getting out the excavated soil and disposal<br />
of surplus excavated soils as directed, within a lead of<br />
50m. a) Ordinary rock<br />
112.5<br />
cum<br />
3. Providing and laying damp-proof course 50mm thick<br />
with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4<br />
graded stone aggregate 20mm nominal size).<br />
250.00<br />
Sqmt.<br />
4. Providing and laying in position cement concrete of<br />
specified grade excluding the cost of centering and<br />
shuttering- All work upto plinth level.<br />
(a) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone<br />
aggregate 40 mm nominal size)<br />
30.29<br />
Cum<br />
5. Providing and laying cement concrete in retaining<br />
walls, return walls, walls (any thickness) including<br />
attached pilasters, columns, piers, abutments, pillars,<br />
posts, struts, buttresses, string or lacing courses,<br />
parapets, coping, bed blocks, anchor blocks, plain<br />
window sills, fillets etc. upto floor five level, excluding<br />
the cost of centring shuttering and finishing :<br />
21.20<br />
cum<br />
a) 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone<br />
aggregate 20 mm nominal size)<br />
22