Schedule C<br />

Tools and plants to be hired to the contractor<br />

Sr. No Description Hire charges per day place of issue<br />

1 2 3 4<br />

Schedule D<br />

Extra schedule for specific requirements/document for the work if any -----Nil------<br />

Schedule E<br />

Schedule of component of Materials, Labor etc. for escalation<br />

Clause 10CC<br />

Component of materials expressed as per cent to totalValue of work<br />

Cancelled.........................%<br />

Component of labor expressed as percent of total<br />

Value of work “Y” ........................%<br />

Component of POL expressed as percent of total<br />

value of work “Z” .........................%<br />

Schedule F<br />

Reference to General Conditions of contract<br />

Name of work: Construction of Third Phase of CR Masonry Boundary Wall including<br />

Check Posts/Watch Towers of 1.80 m height average from Ground<br />

Level & Barbed wire fencing on M.S. Angles over it in the <strong>IGRMS</strong>,<br />

Bhopal for total length app. 500 Mt. Starting from the edge of existing<br />

constructed CR Masonry wall toward SAF Area.<br />

Estimated cost of work….... Rs. 19,78,018/-<br />

Eernest Money……………<br />

Rs. 39,600/- (Rupees thirty nine thousand six thousand only)<br />

Security Deposit:<br />

A sum @ 10% of gross amount of the bill shall be deducted from<br />

each running bill of contractor till the sum along with sum already<br />

deposited as earnest money shall amount to security deposit of<br />

5% of the tendered value of the work. In any case Bank<br />

guarantee shall not be accepted as security deposit.<br />

Performance guarantee: The contractor shall be required to deposit an amount equal to 5%<br />

of the tendered value of work as performance guarantee in the form of an irrevocable Bank<br />

guarantee bond of any scheduled bank or State Bank of India in accordance with the form<br />

prescribed or in cash or in the form of Govt. security, Fixed deposit receipt etc., within 15 days of<br />

the issue of letter of acceptance. This period can be further extended by Engineer-in-chagrge upto a<br />

maximum of 7 days on written request of the contractor.<br />

10