SINGULUS MASTERING Internati<strong>on</strong>al GmbH<br />
Document number: 051006 AM Direct Annex<br />
TABLE OF CONTENTS<br />
1 INTRODUCTION............................................................................................................................ 4<br />
1.1 PROCESS DESCRIPTION............................................................................................................. 4<br />
2 IN-LINE MANUFACTURING EQUIPMENT ................................................................................... 6<br />
2.1 OPTIONS................................................................................................................................... 6<br />
2.1.1 IFPI Code................................................................................................................................. 6<br />
3 AUXILIARY MANUFACTURING EQUIPMENT............................................................................. 7<br />
3.1 AIR HANDLING UNIT FOR AM DIRECT .......................................................................................... 7<br />
3.2 DI WATER SYSTEM ................................................................................................................... 7<br />
3.3 STAMPER COATING MODULE....................................................................................................... 8<br />
3.4 OVEN........................................................................................................................................ 8<br />
3.5 INNER / OUTER PUNCH EQUIPMENT ............................................................................................ 8<br />
3.6 MULTI DIAMETER PUNCH. .......................................................................................................... 9<br />
3.7 COMPRESSED AIR UNIT.............................................................................................................. 9<br />
4 CONSUMABLES ......................................................................................................................... 10<br />
4.1 SUBSTRATES .......................................................................................................................... 10<br />
4.2 PROCESS CONSUMABLES......................................................................................................... 10<br />
4.3 EQUIPMENT CONSUMABLES ..................................................................................................... 10<br />
4.4 WASTE MATERIAL.................................................................................................................... 11<br />
5 SPARE PARTS ............................................................................................................................ 12<br />
6 PROJECTS .................................................................................................................................. 13<br />
6.1 PRE-INSTALLATION.................................................................................................................. 13<br />
6.2 INSTALLATION ......................................................................................................................... 14<br />
6.3 START-UP AND SITE ACCEPTANCE TEST .................................................................................. 14<br />
7 TESTING, COMMISIONING AND CERTIFICATION .................................................................. 15<br />
7.1 PRELIMINARY ACCEPTANCE TEST ............................................................................................ 15<br />
7.1.1 PAT procedure....................................................................................................................... 15<br />
7.2 FINAL ACCEPTANCE TEST........................................................................................................ 16<br />
7.2.1 FAT procedure....................................................................................................................... 16<br />
7.3 CERTIFICATE OF PRELIMINARY ACCEPTANCE TEST .................................................................... 18<br />
7.4 CERTIFICATE OF SITE ACCEPTANCE TEST AND TRANSFER......................................................... 19<br />
8 REQUIRED CREW, TRAINING AND DOCUMENTATION ......................................................... 20<br />
8.1 REQUIRED CREW..................................................................................................................... 20<br />
8.2 REQUIRED CREW..................................................................................................................... 20<br />
8.3 TRAINING................................................................................................................................20<br />
8.4 DOCUMENTATION .................................................................................................................... 20<br />
9 UTILLITY REQUIREMENTS ....................................................................................................... 22<br />
9.1 CIVIL/ STRUCTUAL ................................................................................................................... 22<br />
9.2 ENVIRONMENT ........................................................................................................................ 23<br />
9.3 AM DIRECT REQUIREMENTS .................................................................................................... 25<br />
9.4 DI WATER SYSTEM REQUIREMENTS .......................................................................................... 28<br />
9.5 AIR HANDLING UNIT REQUIREMENTS ........................................................................................ 29<br />
9.6 SPIN COATER REQUIREMENTS.................................................................................................. 30<br />
SINGULUS MASTERING Internati<strong>on</strong>al GmbH UBS AG VAT Reg. No.:<br />
Vordergasse 3 Postfach Switzerland:<br />
CH-8201 Schaffhausen CH-8098 Zurich 419 167<br />
Switzerland Switzerland Internati<strong>on</strong>al:<br />
Tel. +41 52 633 37 33 Bank Account No.: 230-M0382646.5 NL808057686B01<br />
Fax +41 52 633 37 83 IBAN: CH51 0023 0230 M038 2646 5<br />
E-Mail: christian.risch@singulus.ch<br />
Swiftcode: UBSWCHZH80A<br />
Web: http://www.singulus.nl<br />
Modificati<strong>on</strong>s without prior notice - 2 -