Indiana TIP Projects by MPMS Number - Southwestern ...
Indiana TIP Projects by MPMS Number - Southwestern ...
Indiana TIP Projects by MPMS Number - Southwestern ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2013 - 2016<br />
<strong>Southwestern</strong> Pennsylvania Commission<br />
Transportation Improvement Program (<strong>TIP</strong>)<br />
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
25283 PA 403 Clymer Bridge<br />
Bridge 403<br />
Cherryhill Township<br />
PENNDOT<br />
Replace EXISTING STRUCTURE CARRYING SR 403 NORTHEAST OF SR<br />
286<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Utilities State 185 0<br />
4,000 0 0 4,000<br />
0 4,000<br />
0<br />
0<br />
4,000<br />
Right of Way Federal STP 0<br />
16,000 0 0 16,000<br />
0 16,000<br />
0<br />
0<br />
16,000<br />
12/17/2009<br />
Construction State 185 455<br />
0 0 0 455<br />
455 0<br />
0<br />
0<br />
455<br />
20,455<br />
Estimated Total Project Cost: 7,185,583<br />
25419 T-460 Aultman Bridge #3<br />
Bridge<br />
Black Lick Township<br />
County<br />
This project involves the replacement of the existing structurally deficient<br />
(SD) bridge carrying Township Road #460 (Aultmans Run Road) over<br />
Aultmans Run in Blacklick Township, <strong>Indiana</strong> County. Based on current data<br />
in the Bridge Management System, the substructure and superstructure are<br />
rated as poor. The bridge is currently posted at 3 tons.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOF 206,000<br />
0 0 0 206,000<br />
Local LOC 12,875<br />
0 0 0 12,875<br />
State 183 38,625<br />
0 0 0 38,625<br />
257,500 0<br />
0<br />
0 257,500<br />
257,500<br />
Estimated Total Project Cost: 0<br />
Last Updated<br />
1/28/2014<br />
Page 1 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
25503 Dilltown Bridge No. 1<br />
Bridge 403<br />
Buffington Township<br />
PENNDOT<br />
Replacement of the existing structure carrying SR 403 over Blacklick Creek<br />
in the Village of Dilltown in Buffington and East Wheatfield Townships,<br />
located approximately 0.2 mile south of the intersection of SR 2012 (River<br />
Road) with SR 403.<br />
Let Date<br />
12/2/2010<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal BOO 20,000<br />
0 0 0 20,000<br />
20,000 0<br />
0<br />
0<br />
20,000<br />
20,000<br />
Estimated Total Project Cost: 3,302,600<br />
25513 Home Railroad Bridge<br />
Bridge 119<br />
Rayne Township<br />
PENNDOT<br />
Replacement of the existing structure carrying US 119 over the B&P<br />
Railroad near the Village of Home in Rayne Township, located<br />
approximately 0.16 mile south of the intersection of PA 85 and SR 4012<br />
(Washington Church Road) with US 119.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 916 20,000<br />
0 0 0 20,000<br />
20,000 0<br />
0<br />
0<br />
20,000<br />
Final Design State 185 78,000<br />
0 0 0 78,000<br />
78,000 0<br />
0<br />
0<br />
78,000<br />
Right of Way Federal BOO 612,800<br />
0 0 0 612,800<br />
State 185 153,200<br />
0 0 0 153,200<br />
766,000 0<br />
0<br />
0 766,000<br />
864,000<br />
Estimated Total Project Cost: 864,000<br />
25546 Onberg Bridge<br />
Bridge 1005<br />
Rayne Township<br />
PENNDOT<br />
This SD bridge replacement project carries SR 1005/Township Road #890<br />
(Tanoma Road) over Crooked Creek in Rayne Township, <strong>Indiana</strong> County.<br />
Based on the Bridge Risk Assessment, this structure is ranked the 9th worst<br />
in <strong>Indiana</strong> County. The deck, superstructure, and substructure are all rated<br />
as serious; and the structure is currently restricted from overloads<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOF 64,000<br />
0 0 0 64,000<br />
State 185 16,000<br />
0 0 0 16,000<br />
80,000 0<br />
0<br />
0<br />
80,000<br />
80,000<br />
Estimated Total Project Cost: 1,155,000<br />
Last Updated<br />
1/28/2014<br />
Page 2 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
25553 Hillsdale South 3R<br />
Line Item 286<br />
Montgomery Township<br />
PENNDOT<br />
This is a completed resurfacing, restoration, and rehabilitation project along<br />
PA 286 from approximately the intersection with SR 1024 (Hemlock Road) to<br />
approximately the intersection with Township Road #548 (Rowley Cemetery<br />
Road). The project has experienced a $9,800 accrued unbilled cost (AUC) in<br />
its right-of-way phase due to the settlement of a litigated claim.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Right of Way Federal STP 0<br />
7,840 0 0 7,840<br />
State 582 0<br />
1,960 0 0 1,960<br />
0 9,800<br />
0<br />
0<br />
9,800<br />
9,800<br />
Estimated Total Project Cost: 2,550,000<br />
25619 US 119 East Pike Northbound and Southbound Bridges<br />
White Township<br />
PENNDOT<br />
Bridge 119<br />
This project involves the rehabilitation (full superstructure replacements) of<br />
the existing structures carrying US 119 northbound and southbound over SR<br />
1002 (East Pike) in White Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 916 360,000<br />
0 0 0 360,000<br />
360,000 0<br />
0<br />
0 360,000<br />
1/16/2014<br />
Construction Federal NHPP 0 4,000,000 0 0 4,000,000<br />
0 4,000,000<br />
0<br />
0 4,000,000<br />
4,360,000<br />
Estimated Total Project Cost: 4,360,000<br />
Last Updated<br />
1/28/2014<br />
Page 3 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
25693 Shelocta Bridge #1<br />
Bridge 422<br />
Armstrong Township<br />
PENNDOT<br />
This bridge rehabilitation project carries US 422 over Crooked Creek in<br />
Armstrong Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOO 300,000<br />
0 0 0 300,000<br />
State 185 75,000<br />
0 0 0 75,000<br />
375,000 0<br />
0<br />
0 375,000<br />
Final Design State 916 0<br />
425,000 0 0 425,000<br />
0 425,000<br />
0<br />
0 425,000<br />
Utilities Federal NHPP 0<br />
0 40,000 0 40,000<br />
State 185 0<br />
0 10,000 0 10,000<br />
0 0<br />
50,000<br />
0<br />
50,000<br />
Right of Way State 185 0<br />
50,000 0 0 50,000<br />
0 50,000<br />
0<br />
0<br />
50,000<br />
12/18/2014<br />
Construction Federal NHPP 0<br />
0 4,900,000 0 4,900,000<br />
0 0 4,900,000<br />
0 4,900,000<br />
5,800,000<br />
Estimated Total Project Cost: 5,800,000<br />
25696 US 422 Cunningham Culvert<br />
Bridge 422<br />
Armstrong Township<br />
PENNDOT<br />
This project is the replacement of the existing structure carrying US 422 over<br />
Curry Run in Armstrong Township, <strong>Indiana</strong> County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 185 410,000<br />
0 0 0 410,000<br />
410,000 0<br />
0<br />
0 410,000<br />
410,000<br />
Estimated Total Project Cost: 410,000<br />
Last Updated<br />
1/28/2014<br />
Page 4 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
25699 Ewings Mill Bridge #1<br />
Bridge 422<br />
Pine Township<br />
PA Turnpike<br />
This bridge replacement project carries US 422 over Laurel Run in Pine<br />
Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOO 300,000<br />
0 0 0 300,000<br />
State 185 75,000<br />
0 0 0 75,000<br />
375,000 0<br />
0<br />
0 375,000<br />
Final Design Federal NHPP 0<br />
288,000 0 0 288,000<br />
State 185 0<br />
32,000 0 0 32,000<br />
0 320,000<br />
0<br />
0 320,000<br />
695,000<br />
Estimated Total Project Cost: 695,000<br />
25782 Airport Road over US 119 Bridge<br />
Bridge 1006<br />
White Township<br />
PENNDOT<br />
This project involves the rehabilitation (superstructure replacement) of the<br />
existing SD bridge, <strong>Indiana</strong> County. The existing steel beams have some<br />
collision damage and various fatigue cracks.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 916 310,000<br />
0 0 0 310,000<br />
310,000 0<br />
0<br />
0 310,000<br />
310,000<br />
Estimated Total Project Cost: 310,000<br />
25786 Gypsy Bridge #2<br />
Bridge 1033<br />
Banks Township<br />
PENNDOT<br />
Replacement of the existing structure carrying State Route 1033 (Gipsy<br />
Road) over the west branch of Cush Creek in Montgomery Township,<br />
<strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 185 0<br />
255,000 0 0 255,000<br />
0 255,000<br />
0<br />
0 255,000<br />
Utilities Federal BOF 0<br />
0 0 112,560 112,560<br />
State 185 0<br />
0 0 28,140 28,140<br />
0 0<br />
0<br />
140,700 140,700<br />
Right of Way State 916 0<br />
25,000 0 0 25,000<br />
0 25,000<br />
0<br />
0<br />
25,000<br />
10/15/2015<br />
Construction State 916 0<br />
0 0 1,568,400 1,568,400<br />
0 0<br />
0 1,568,400 1,568,400<br />
1,989,100<br />
Estimated Total Project Cost: 2,474,200<br />
Last Updated<br />
1/28/2014<br />
Page 5 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
25820 SR 119 South Widening<br />
Highway 119<br />
AQ Project<br />
Burrell Township<br />
PENNDOT<br />
This widening and reconstruction project is located on US 119 from just<br />
north of US 22 ending just north of PA 56. The project was let on<br />
September 12, 2002, and is complete. As part of a right-of-way claim,<br />
funding is needed to complete a right-of-way plan revision as mandated <strong>by</strong> a<br />
judge in regard to a previously acquired property.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Right of Way State 581 0<br />
20,000 0 0 20,000<br />
25834 Rose Street Extension #2<br />
Highway 3043<br />
AQ Project<br />
0 20,000<br />
0<br />
0<br />
20,000<br />
20,000<br />
Estimated Total Project Cost: 53,023,702<br />
White Township<br />
PENNDOT<br />
This project is a new two-lane highway from the intersection of SR 3043<br />
(Rose Street) with PA 286 (Oakland Avenue) to SR 4032 (Philadelphia<br />
Street) where it intersects with SR 4003 (College Lodge Road) in White<br />
Township, <strong>Indiana</strong> County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 581 700,000<br />
0 0 0 700,000<br />
700,000 0<br />
0<br />
0 700,000<br />
700,000<br />
Estimated Total Project Cost: 15,250,000<br />
46995 T-562 Dixon Run Bridge<br />
Bridge 7218<br />
Rayne Township<br />
County<br />
Replacement of the bridge carrying T-562 (Ash Road) over Dixon Run in<br />
Rayne Township, <strong>Indiana</strong> County.<br />
Let Date<br />
10/18/2012<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal BOF 24,400<br />
0 0 0 24,400<br />
State 179 6,100<br />
0 0 0 6,100<br />
30,500 0<br />
0<br />
0<br />
30,500<br />
30,500<br />
Estimated Total Project Cost: 1,117,101<br />
69987 SPC District 10 RR Line<br />
Line Item<br />
FFY 2013 - FFY 2016 Railroad Reserve region wide.<br />
PENNDOT<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal RRX 0<br />
0 267,000 267,000 534,000<br />
0 0 267,000<br />
267,000 534,000<br />
534,000<br />
Estimated Total Project Cost: 1,152,000<br />
Last Updated<br />
1/28/2014<br />
Page 6 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
69988 Wake Robin Curve<br />
Highway 119<br />
Rayne Township<br />
PENNDOT<br />
Two-lane relocation of US 119 south of the intersection with SR 4008<br />
(Chambersville Road) in Rayne Township.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 581 40,000<br />
0 0 0 40,000<br />
40,000 0<br />
0<br />
0<br />
40,000<br />
40,000<br />
Estimated Total Project Cost: 1,400,000<br />
70493 Rose Street #2 North<br />
Highway 3043<br />
White Township<br />
PENNDOT<br />
This intersection improvement project includes turning lanes, relocation of<br />
the existing road, and sidewalk and drainage updates along (College Lodge<br />
Road) and SR 4003 from its intersection with SR 4032 north approximately<br />
575 feet in <strong>Indiana</strong> Borough and White Township, <strong>Indiana</strong> County. The<br />
project was let on June 18, 2009, and construction is complete. However,<br />
the project has experienced a $6,926 construction accrued unbilled cost<br />
(AUC). Therefore, District 10 now requests to add this project and its<br />
construction phase to the <strong>TIP</strong> in FFY 2013 and program $6,926 Federal into<br />
that phase. The funds to cover this AUC are available from the following<br />
sources:<br />
Let Date<br />
6/18/2009<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal STN 6,926<br />
0 0 0 6,926<br />
6,926 0<br />
0<br />
0<br />
6,926<br />
6,926<br />
Estimated Total Project Cost: 5,322,031<br />
74307 Gipsy Bridge #1<br />
Bridge 1056<br />
Montgomery Township<br />
PENNDOT<br />
This bridge replacement project carries SR 1056 (Trojan Road) over the<br />
west branch of Cush Creek in Montgomery Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOF 300,000<br />
0 0 0 300,000<br />
State 185 75,000<br />
0 0 0 75,000<br />
375,000 0<br />
0<br />
0 375,000<br />
Right of Way Federal BOF 0<br />
20,000 0 0 20,000<br />
State 185 0<br />
5,000 0 0 5,000<br />
0 25,000<br />
0<br />
0<br />
25,000<br />
400,000<br />
Estimated Total Project Cost: 400,000<br />
Last Updated<br />
1/28/2014<br />
Page 7 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
74310 Wehrum Bridge<br />
Bridge 2013<br />
Buffington Township<br />
PENNDOT<br />
This bridge replacement project carries SR 2013 (Wehrum Road) over<br />
Blacklick Creek in Buffington Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOF 300,000<br />
0 0 0 300,000<br />
State 185 75,000<br />
0 0 0 75,000<br />
375,000 0<br />
0<br />
0 375,000<br />
Final Design Federal BOF 0<br />
172,000 0 0 172,000<br />
State 185 0<br />
43,000 0 0 43,000<br />
0 215,000<br />
0<br />
0 215,000<br />
590,000<br />
Estimated Total Project Cost: 590,000<br />
75924 South Brush Valley Bridge<br />
Bridge 56<br />
Brush Valley Township<br />
PENNDOT<br />
Replacement of the existing structure carrying PA 56 over Brush Creek in<br />
Brush Valley Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Utilities Federal Boo 41,600<br />
0 0 0 41,600<br />
State 185 10,400<br />
0 0 0 10,400<br />
52,000 0<br />
0<br />
0<br />
52,000<br />
12/20/2012<br />
Construction Federal BOO 1,632,100<br />
0 0 0 1,632,100<br />
1,632,100 0<br />
0<br />
0 1,632,100<br />
1,684,100<br />
Estimated Total Project Cost: 2,780,500<br />
83206 Brush Valley Bridge #3<br />
Bridge 56<br />
Brush Valley Township<br />
PENNDOT<br />
This project involves the replacement of the existing SD bridge carrying PA<br />
56 over Little Brush Creek in Brush Valley Township, <strong>Indiana</strong> County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 916 0<br />
350,000 0 0 350,000<br />
0 350,000<br />
0<br />
0 350,000<br />
350,000<br />
Estimated Total Project Cost: 350,000<br />
Last Updated<br />
1/28/2014<br />
Page 8 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
83210 Plumville Bridge #1<br />
Bridge 85<br />
Plumville Borough<br />
PENNDOT<br />
This project involves the replacement of the existing structurally deficient<br />
(SD) bridge carrying PA 85 over the north branch of Plum Creek in Plumville<br />
Borough, <strong>Indiana</strong> County.<br />
Based on the latest Bridge Risk Assessment, this structure is ranked 99th in<br />
the County. The superstructure is rated as poor, and the substructure is<br />
rated as fair. While this structure is not ranked as high as other SD bridges<br />
in the County, there is an interest from local officials to have the bridge<br />
reconstructed to allow pedestrian access to be incorporated. This structure<br />
is located within the town of Plumville. The town has been constructing<br />
sidewalks along PA 85 to allow for pedestrian travel. There is currently a<br />
gap of approximately 400 feet to connect the sidewalks. This structure is<br />
located within the gap, and the 26-foot width does not allow for pedestrians<br />
to safely cross the structure. Without this replacement project, the locals<br />
would be forced to construct a separate pedestrian stream crossing.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOO 340,000<br />
0 0 0 340,000<br />
State 185 85,000<br />
0 0 0 85,000<br />
425,000 0<br />
0<br />
0 425,000<br />
425,000<br />
Estimated Total Project Cost: 425,000<br />
83277 Germany Bridges 1 & 2<br />
Bridge 259<br />
West Wheatfield Township<br />
PENNDOT<br />
Replacement of the existing structure carrying PA 259 over the west branch<br />
of Richards Run and rehabilitation of the existing structure carrying SR 2011<br />
(Mulligan Hill Road) over the east branch of Richards Run in West<br />
Wheatfield Township.<br />
Let Date<br />
7/26/2012<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal STP 0<br />
36,000 0 0 36,000<br />
State 185 0<br />
9,000 0 0 9,000<br />
0 45,000<br />
0<br />
0<br />
45,000<br />
45,000<br />
Estimated Total Project Cost: 2,368,000<br />
Last Updated<br />
1/28/2014<br />
Page 9 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
83351 Iselin Bridge #2 SR 3021<br />
Bridge 3021<br />
Young Township<br />
PENNDOT<br />
Replacement of the existing structure carrying State Route 3021 (Iselin<br />
Road) over Harpers Run in Young Township.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Utilities State 185 5,200<br />
4,800 0 0 10,000<br />
5,200 4,800<br />
0<br />
0<br />
10,000<br />
Right of Way State 185 10,300<br />
0 0 0 10,300<br />
10,300 0<br />
0<br />
0<br />
10,300<br />
1/16/2014<br />
Construction State 185 0<br />
275,900 0 0 275,900<br />
0 275,900<br />
0<br />
0 275,900<br />
296,200<br />
Estimated Total Project Cost: 365,700<br />
83352 Brewer Run Bridge<br />
Bridge 1038<br />
Canoe Township<br />
PENNDOT<br />
This project is the replacement of the existing structure carrying SR 1038<br />
(East Creek Road) over Brewer Run in Canoe Township, <strong>Indiana</strong> County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 185 50,000<br />
0 0 0 50,000<br />
50,000 0<br />
0<br />
0<br />
50,000<br />
Utilities State 185 0<br />
5,400 0 0 5,400<br />
0 5,400<br />
0<br />
0<br />
5,400<br />
Right of Way State 185 0<br />
10,700 0 0 10,700<br />
0 10,700<br />
0<br />
0<br />
10,700<br />
66,100<br />
Estimated Total Project Cost: 66,100<br />
83368 West Lebanon Bridge<br />
Bridge 3056<br />
Young Township<br />
PENNDOT<br />
Replacement of the existing structure carrying State Route 3056 (Old Route<br />
56) over tributary to Blacklegs Creek in Young Township, <strong>Indiana</strong> County.<br />
Let Date<br />
1/17/2013<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction State 185 221,500<br />
0 0 0 221,500<br />
221,500 0<br />
0<br />
0 221,500<br />
221,500<br />
Estimated Total Project Cost: 293,600<br />
Last Updated<br />
1/28/2014<br />
Page 10 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
83973 Mill Run Drive Bridge<br />
Bridge 4032<br />
White Township<br />
PENNDOT<br />
This project involves the replacement of the existing structure carrying SR<br />
4032 (Philadelphia Street) over a tributary to McCarthy Run located within<br />
the intersection of Township Road #801 (Mill Run Drive) and Township Road<br />
#416 (Shelly Drive) with SR 4032 in White Township, <strong>Indiana</strong> County. This<br />
project is experiencing a utility cost increase due to the actual bid amount<br />
being higher than the original agreement amount and the need for additional<br />
right-of-way due to a utility relocation.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Utilities State 185 82,000<br />
0 0 0 82,000<br />
82,000 0<br />
0<br />
0<br />
82,000<br />
82,000<br />
Estimated Total Project Cost: 2,249,468<br />
86022 Grange Bridge<br />
Bridge 217<br />
Black Lick Township<br />
PENNDOT<br />
This project is the replacement of the existing structure carrying PA 217 (four<br />
miles north of Blairsville) over Stewart Run in Blacklick Township, <strong>Indiana</strong><br />
County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 185 310,000<br />
50,000 0 0 360,000<br />
310,000 50,000<br />
0<br />
0 360,000<br />
360,000<br />
Estimated Total Project Cost: 360,000<br />
87018 Hoodlebug/Main Street Safe Routes to School<br />
Homer City Borough Other<br />
Enhancement 9900<br />
Federal Safe Routes to School (FSRTS) funding and will involve<br />
improvements that include crosswalks, sidewalks, curbs, and other<br />
miscellaneous construction, all at various locations of Main Street in Homer<br />
City Borough, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design Federal STP 0<br />
2,304 0 0 2,304<br />
0 2,304<br />
0<br />
0<br />
2,304<br />
2,304<br />
Estimated Total Project Cost: 284,945<br />
Last Updated<br />
1/28/2014<br />
Page 11 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
88374 US 219 Cambria to Clearfield<br />
Highway 219<br />
Cherry Tree Borough<br />
PENNDOT<br />
This project involves resurfacing along US 219 from the Cambria County line<br />
to the Clearfield County line in Cherry Tree Borough, <strong>Indiana</strong> County. The<br />
work will include milling of existing bituminous wearing courses, bituminous<br />
patching, paving, leveling, binder and wearing courses, and minor drainage<br />
and guide rail upgrades.<br />
Let Date<br />
10/22/2015<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction State 581 0 2,000,000 0 0 2,000,000<br />
0 2,000,000<br />
0<br />
0 2,000,000<br />
2,000,000<br />
Estimated Total Project Cost: 2,000,000<br />
88832 2013 <strong>Indiana</strong> Bridge Preserv<br />
Bridge<br />
PENNDOT<br />
Bridge preservation activities at various locations in <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 185 4,062<br />
0 0 0 4,062<br />
4,062 0<br />
0<br />
0<br />
4,062<br />
4/11/2013<br />
Construction Federal BOO 798,400<br />
0 0 0 798,400<br />
State 185 606,785<br />
0 0 0 606,785<br />
1,405,185 0<br />
0<br />
0 1,405,185<br />
1,409,247<br />
Estimated Total Project Cost: 1,409,247<br />
88837 2015 <strong>Indiana</strong> DFB Line<br />
Bridge<br />
PENNDOT<br />
2015 Department Force Bridge replacement reserve for <strong>Indiana</strong> County.<br />
Let Date<br />
6/15/2015<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction State 916 0<br />
0 284,200 0 284,200<br />
0 0 284,200<br />
0 284,200<br />
284,200<br />
Estimated Total Project Cost: 284,200<br />
Last Updated<br />
1/28/2014<br />
Page 12 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
88839 2016 <strong>Indiana</strong> DFB Line<br />
Bridge<br />
PENNDOT<br />
2016 Department Force Bridge replacement reserve for <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 185 0<br />
41,600 0 0 41,600<br />
0 41,600<br />
0<br />
0<br />
41,600<br />
Utilities State 916 0<br />
0 5,500 0 5,500<br />
0 0<br />
5,500<br />
0<br />
5,500<br />
Right of Way State 916 0<br />
0 11,000 0 11,000<br />
0 0<br />
11,000<br />
0<br />
11,000<br />
6/15/2016<br />
Construction State 185 0<br />
0 0 292,700 292,700<br />
0 0<br />
0<br />
292,700 292,700<br />
350,800<br />
Estimated Total Project Cost: 350,800<br />
88841 <strong>Indiana</strong> Local Bridge Line<br />
Bridge<br />
<strong>Indiana</strong> County local bridge Reserve.<br />
PENNDOT<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design Federal BOF 0<br />
212,240 0 0 212,240<br />
Local LOC 0<br />
13,265 0 0 13,265<br />
State 183 0<br />
39,795 0 0 39,795<br />
0 265,300<br />
0<br />
0 265,300<br />
Utilities Federal BOF 0<br />
0 13,120 0 13,120<br />
Local LOC 0<br />
0 820 0 820<br />
State 183 0<br />
0 2,460 0 2,460<br />
0 0<br />
16,400<br />
0<br />
16,400<br />
Right of Way Federal BOF 0<br />
0 13,120 0 13,120<br />
Local LOC 0<br />
0 820 0 820<br />
State 183 0<br />
0 2,460 0 2,460<br />
0 0<br />
16,400<br />
0<br />
16,400<br />
10/15/2015<br />
Construction Federal BOF 0<br />
0 0 1,350,640 1,350,640<br />
Local LOC 0<br />
0 0 84,415 84,415<br />
State 183 0<br />
0 0 253,245 253,245<br />
0 0<br />
0 1,688,300 1,688,300<br />
1,986,400<br />
Estimated Total Project Cost: 1,986,400<br />
Last Updated<br />
1/28/2014<br />
Page 13 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
88851 S. Brush Valley Bridge Realign<br />
Bridge 56<br />
Brush Valley Township<br />
Realignment of PA 56 in Brush Valley Township.<br />
PENNDOT<br />
Let Date<br />
12/20/2012<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal STP 1,710,000<br />
0 0 0 1,710,000<br />
88992 <strong>Indiana</strong> Boro/White Twp Int<br />
Line Item<br />
AQ Project<br />
1,710,000 0<br />
0<br />
0 1,710,000<br />
1,710,000<br />
Estimated Total Project Cost: 4,342,500<br />
PENNDOT<br />
Intersection improvements at various locations in <strong>Indiana</strong> Borough and<br />
White Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Utilities Federal CAQ 0<br />
0 200,000 0 200,000<br />
Local LOC 0<br />
0 50,000 0 50,000<br />
0 0 250,000<br />
0 250,000<br />
Right of Way Federal CAQ 0<br />
0 700,000 0 700,000<br />
Local LOC 0<br />
0 175,000 0 175,000<br />
0 0 875,000<br />
0 875,000<br />
Construction Federal CAQ 0<br />
0 886,480 0 886,480<br />
Local LOC 0<br />
0 221,620 0 221,620<br />
0 0 1,108,100<br />
0 1,108,100<br />
2,233,100<br />
Estimated Total Project Cost: 2,233,100<br />
89918 Cramer Bridge #4<br />
Bridge 403<br />
East Wheatfield Township<br />
PENNDOT<br />
Replacement of the existing structure carrying PA 403 over a tributary to the<br />
Conemaugh River in East Wheatfield Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Utilities State 916 77,300<br />
0 0 0 77,300<br />
77,300 0<br />
0<br />
0<br />
77,300<br />
12/20/2012<br />
Construction Federal STP 1,000,000<br />
0 0 0 1,000,000<br />
1,000,000 0<br />
0<br />
0 1,000,000<br />
1,077,300<br />
Estimated Total Project Cost: 1,541,300<br />
Last Updated<br />
1/28/2014<br />
Page 14 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
90194 United High School Curve<br />
Highway 56<br />
East Wheatfield Township<br />
PENNDOT<br />
Safety improvement (realignment to improve geometry and sight distance)<br />
along PA 56 near United High School approximately 1.07 miles northwest of<br />
the intersection with US 22 in East Wheatfield Township.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal HSIP 202,500<br />
0 0 0 202,500<br />
State 581 22,500<br />
0 0 0 22,500<br />
225,000 0<br />
0<br />
0 225,000<br />
Final Design Federal HSIP 0<br />
202,500 0 0 202,500<br />
State 581 0<br />
22,500 0 0 22,500<br />
0 225,000<br />
0<br />
0 225,000<br />
Utilities Federal HSIP 0<br />
143,280 0 0 143,280<br />
State 581 0<br />
15,920 0 0 15,920<br />
0 159,200<br />
0<br />
0 159,200<br />
Right of Way Federal HSIP 0<br />
238,770 0 0 238,770<br />
State 581 0<br />
26,530 0 0 26,530<br />
0 265,300<br />
0<br />
0 265,300<br />
1/15/2015<br />
Construction Federal HSIP 0<br />
0 1,704,000 1,704,000 3,408,000<br />
Federal STP 0<br />
0 2,182,980 0 2,182,980<br />
State 581 0<br />
0 431,887 189,333 621,220<br />
0 0 4,318,867 1,893,333 6,212,200<br />
7,086,700<br />
Estimated Total Project Cost: 7,086,700<br />
Last Updated<br />
1/28/2014<br />
Page 15 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
90196 Yellow Creek Park Intersection<br />
Highway 422<br />
Cherryhill Township<br />
PENNDOT<br />
Safety improvement (addition of a left-turn lane) at the intersection of US<br />
422 and PA 259 near Yellow Creek Park in Cherryhill Township, <strong>Indiana</strong><br />
County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design Federal HSIP 0<br />
112,500 0 0 112,500<br />
State 581 0<br />
12,500 0 0 12,500<br />
0 125,000<br />
0<br />
0 125,000<br />
Utilities Federal HSIP 0<br />
27,000 0 0 27,000<br />
State 581 0<br />
3,000 0 0 3,000<br />
0 30,000<br />
0<br />
0<br />
30,000<br />
Right of Way Federal HSIP 0<br />
67,500 0 0 67,500<br />
State 581 0<br />
7,500 0 0 7,500<br />
0 75,000<br />
0<br />
0<br />
75,000<br />
6/19/2014<br />
Construction Federal HSIP 0<br />
921,030 0 0 921,030<br />
Federal NHPP 0 1,733,970 0 0 1,733,970<br />
State 581 0<br />
295,000 0 0 295,000<br />
0 2,950,000<br />
0<br />
0 2,950,000<br />
3,180,000<br />
Estimated Total Project Cost: 3,180,000<br />
Last Updated<br />
1/28/2014<br />
Page 16 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
91256 US 119 Homer City North<br />
Highway 119<br />
Homer City Borough<br />
PENNDOT<br />
This safety improvement and highway restoration project involves the<br />
placement of concrete median barrier to limit crossover access along certain<br />
stretches of US 119 in Homer City Borough and Center and White<br />
Townships, <strong>Indiana</strong> County. It also includes milling, concrete pavement<br />
patching, lengthening of existing left-turn lanes, widening, bituminous<br />
overlay, and drainage improvements. The initial project area runs from the<br />
PA 56/US 119 intersection in Homer City Borough north through Center<br />
Township and ends at US 422 in White Township. The project length and<br />
scope may be further revised as preliminary design identifies the areas of<br />
need. This project is also a companion to the US 119 Homer City Group<br />
Bridges project, which involves five existing bridges within the US 119<br />
Homer City North limits of work (one replacement, two rehabilitations, one<br />
preservation, and one removal). Preliminary engineering work performed to<br />
date has been an alternatives analysis to determine how to control access<br />
on Route 119. The resulting solution is to place a continuous barrier across<br />
all unsignalized intersections. In order to mitigate the access lost to the<br />
community, a new access connector road is needed. Additional preliminary<br />
design funds will be needed to design this new access road and obtain<br />
environmental clearance for it.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 581 220,000<br />
0 0 0 220,000<br />
220,000 0<br />
0<br />
0 220,000<br />
Final Design Federal NHS 329,600<br />
0 0 0 329,600<br />
State 581 82,400<br />
0 0 0 82,400<br />
412,000 0<br />
0<br />
0 412,000<br />
Utilities Federal NHPP 0<br />
0 218,560 0 218,560<br />
State 581 0<br />
0 54,640 0 54,640<br />
0 0 273,200<br />
0 273,200<br />
Right of Way Federal NHPP 0<br />
14,400 0 0 14,400<br />
State 581 0<br />
360,000 0 0 360,000<br />
0 374,400<br />
0<br />
0 374,400<br />
6/18/2015<br />
Construction Federal NHPP 0<br />
0 4,423,040 1,696,240 6,119,280<br />
State 581 0<br />
0 1,529,820 0 1,529,820<br />
0 0 5,952,860 1,696,240 7,649,100<br />
8,928,700<br />
Estimated Total Project Cost: 8,928,700<br />
Last Updated<br />
1/28/2014<br />
Page 17 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
91310 Seward Truss Bridge PM<br />
Bridge 56<br />
East Wheatfield Township<br />
PENNDOT<br />
Expansion dam replacement, sealing the concrete deck with an epoxy<br />
overlay, structural steel repairs, concrete repairs to the abutments and pier,<br />
retrofitting of the rocker nest bearings, and complete painting of the structure.<br />
Let Date<br />
2/16/2012<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal BOO 72,000<br />
0 0 0 72,000<br />
State 185 18,000<br />
0 0 0 18,000<br />
90,000 0<br />
0<br />
0<br />
90,000<br />
90,000<br />
Estimated Total Project Cost: 1,795,000<br />
91403 Grant Township Superstructure Replacements (SR 7213) Grant Township<br />
Municipality<br />
Bridge 7213<br />
Rehabilitation (superstructure replacement) of the existing structures<br />
carrying T-851 (East Run Road) over Little Mahoning Creek and T-837<br />
(Hartman Road) over East Run in Grant Township.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design Federal BOF 206,000<br />
0 0 0 206,000<br />
Local LOC 12,875<br />
0 0 0 12,875<br />
State 183 38,625<br />
0 0 0 38,625<br />
257,500 0<br />
0<br />
0 257,500<br />
Utilities Federal BOF 0<br />
25,520 0 0 25,520<br />
Local LOC 0<br />
1,595 0 0 1,595<br />
State 183 0<br />
4,785 0 0 4,785<br />
0 31,900<br />
0<br />
0<br />
31,900<br />
Right of Way Federal BOF 0<br />
25,520 0 0 25,520<br />
Local LOC 0<br />
1,595 0 0 1,595<br />
State 183 0<br />
4,785 0 0 4,785<br />
0 31,900<br />
0<br />
0<br />
31,900<br />
1/15/2015<br />
Construction Federal BOF 0<br />
0 1,136,480 0 1,136,480<br />
Local LOC 0<br />
0 71,030 0 71,030<br />
State 183 0<br />
0 213,090 0 213,090<br />
0 0 1,420,600<br />
0 1,420,600<br />
1,741,900<br />
Estimated Total Project Cost: 2,041,900<br />
Last Updated<br />
1/28/2014<br />
Page 18 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
92579 119 Homer City Group Bridges:<br />
Bridge 119<br />
Center Township<br />
PENNDOT<br />
This group project includes the rehabilitation, preservation, and removal of<br />
existing structures carrying US 119 over Township Road #840 (Tide Road),<br />
Yellow Creek, and an abandoned private railroad in Center Township,<br />
<strong>Indiana</strong> County. Preliminary engineering originally consisted of evaluating<br />
three structurally deficient bridges. The project has since evolved into a<br />
safety improvement project, work on five structurally deficient bridges, and<br />
roadway needs on this corridor segment.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal NHPP 0<br />
320,000 0 0 320,000<br />
State 185 0<br />
80,000 0 0 80,000<br />
0 400,000<br />
0<br />
0 400,000<br />
Final Design State 185 64,000<br />
0 0 0 64,000<br />
64,000 0<br />
0<br />
0<br />
64,000<br />
464,000<br />
Estimated Total Project Cost: 464,000<br />
92617 Marion Center North PM<br />
Highway 119<br />
East Mahoning Township<br />
PENNDOT<br />
Resurfacing along US 119 from T-821 (Wilmoth Road) north to T-659<br />
(Marshall Road) in East and North Mahoning Townships.<br />
Let Date<br />
3/14/2013<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal STP 1,242,400<br />
0 0 0 1,242,400<br />
State 581 310,600<br />
0 0 0 310,600<br />
1,553,000 0<br />
0<br />
0 1,553,000<br />
1,553,000<br />
Estimated Total Project Cost: 3,260,100<br />
92666 Ruffner Church Bridge<br />
Bridge 1005<br />
Rayne Township<br />
PENNDOT<br />
Replacement of the existing structure carrying SR 1005 (Tanoma Road)<br />
over a tributary to Crooked Creek in Rayne Township, <strong>Indiana</strong> County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 185 0<br />
25,000 0 0 25,000<br />
0 25,000<br />
0<br />
0<br />
25,000<br />
25,000<br />
Estimated Total Project Cost: 25,000<br />
Last Updated<br />
1/28/2014<br />
Page 19 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
94901 2015 <strong>Indiana</strong> Bridge Preserv<br />
Bridge<br />
PENNDOT<br />
Bridge preservation activities at various locations in <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 916 0<br />
0 15,300 0 15,300<br />
0 0<br />
15,300<br />
0<br />
15,300<br />
5/15/2015<br />
Construction State 916 0<br />
0 546,400 0 546,400<br />
0 0 546,400<br />
0 546,400<br />
561,700<br />
Estimated Total Project Cost: 561,700<br />
94902 2016 <strong>Indiana</strong> Bridge Preserv<br />
Bridge<br />
PENNDOT<br />
Bridge preservation activities at various locations in <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 916 0<br />
0 0 15,800 15,800<br />
0 0<br />
0<br />
15,800<br />
15,800<br />
5/15/2016<br />
Construction State 916 0<br />
0 0 562,800 562,800<br />
0 0<br />
0<br />
562,800 562,800<br />
578,600<br />
Estimated Total Project Cost: 578,600<br />
95668 Oak/Chestnut Street X-ing<br />
Highway<br />
<strong>Indiana</strong> Borough<br />
PENNDOT<br />
This project includes the addition of 12-inch LED lights and new gates at the<br />
existing at-grade crossing of the Buffalo and Pittsburgh Railroad at the<br />
intersections of Oak and Chestnut Streets with PA 954 (North Ninth Street)<br />
in <strong>Indiana</strong> Borough, <strong>Indiana</strong> County. Warning devices.<br />
Let Date<br />
5/30/2013<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction Federal RRX 267,000<br />
102,000 0 0 369,000<br />
267,000 102,000<br />
0<br />
0 369,000<br />
369,000<br />
Estimated Total Project Cost: 0<br />
Last Updated<br />
1/28/2014<br />
Page 20 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
95904 Shelocta Three Lane Safety<br />
Shelocta Borough<br />
PENNDOT<br />
Highway 422<br />
This safety improvement project involves the addition of a center two-way<br />
left-turn lane (TWLTL) along US 422 from its intersection with PA 56 east to<br />
the intersection of Township Road #361 (Shelocta Road) and Township<br />
Road #362 (Ridge Road) in Shelocta Borough and Armstrong Township<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
6/6/2013<br />
Construction Federal HSIP 1,620,000<br />
0 0 0 1,620,000<br />
1,620,000 0<br />
0<br />
0 1,620,000<br />
1,620,000<br />
Estimated Total Project Cost: 1,620,000<br />
96353 East Pike Roundabout<br />
White Township<br />
PENNDOT<br />
Highway 286<br />
This intersection improvement project involves the conversion of a<br />
signalized intersection to a roundabout at the existing at-grade intersection<br />
of PA 286 and SR 1002 (East Pike Road) in <strong>Indiana</strong> Borough and White<br />
Township, <strong>Indiana</strong> County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 581 350,000<br />
0 0 0 350,000<br />
350,000 0<br />
0<br />
0 350,000<br />
350,000<br />
Estimated Total Project Cost: 350,000<br />
96961 US 422 South Sixth Street EB/WB Bridges<br />
White Township<br />
PENNDOT<br />
Bridge 422<br />
This project involves the rehabilitation of the existing structurally deficient<br />
(SD) bridges carrying US 422 eastbound and westbound over SR 954<br />
(South Sixth Street) in White Township, <strong>Indiana</strong> County. The rehabilitation<br />
scope of work will include replacement of the decks and superstructures to<br />
achieve a minimum 14’-6” vertical clearance to remove the restriction.<br />
There will also be extensive substructure repairs to improve the condition<br />
ratings.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOO 188,000<br />
0 0 0 188,000<br />
Federal NHPP 0<br />
128,000 0 0 128,000<br />
State 185 47,000<br />
32,000 0 0 79,000<br />
235,000 160,000<br />
0<br />
0 395,000<br />
Final Design Federal NHPP 0<br />
260,000 0 0 260,000<br />
State 185 0<br />
65,000 0 0 65,000<br />
0 325,000<br />
0<br />
0 325,000<br />
Right of Way Federal NHPP 0<br />
20,000 0 0 20,000<br />
State 185 0<br />
5,000 0 0 5,000<br />
0 25,000<br />
0<br />
0<br />
25,000<br />
745,000<br />
Last Updated<br />
1/28/2014<br />
Estimated Total Project Cost: 745,000<br />
Page 21 of 22
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
Total Funding for <strong>Indiana</strong> County 59,014,132<br />
Last Updated<br />
1/28/2014<br />
Page 22 of 22