19.07.2014 Views

Downtown Design Guidelines - Pleasant Grove City

Downtown Design Guidelines - Pleasant Grove City

Downtown Design Guidelines - Pleasant Grove City

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pleasant</strong> <strong>Grove</strong> <strong>Downtown</strong> Village<br />

<strong>Design</strong> Standards and <strong>Guidelines</strong><br />

Points System<br />

Each proposed project is reviewed by<br />

the <strong>Downtown</strong> Advisory Board <strong>Design</strong><br />

Review Committee for adherence to<br />

the <strong>Downtown</strong> <strong>Pleasant</strong> <strong>Grove</strong> Turn of<br />

the 20 th Century <strong>Design</strong> Style<br />

guidelines criteria. Points are awarded<br />

for each design component listed<br />

below according to the committee’s<br />

evaluation of the project, determining<br />

the appropriateness of design of the<br />

proposed project in meeting the<br />

<strong>Downtown</strong> Village <strong>Design</strong> Standards<br />

and <strong>Guidelines</strong>. The standards as<br />

listed in the <strong>City</strong> Code are not<br />

evaluated.<br />

Points are assigned as follows:<br />

+ 2 points: If a project constitutes<br />

an excellent job of<br />

meeting the design<br />

guideline.<br />

+1 point: If a project constitutes a<br />

good job of meeting the<br />

design guidelines.<br />

0 points: If the project constitutes<br />

an adequate job of<br />

meeting the design<br />

guideline.<br />

-1 points: If the project constitutes<br />

an inadequate job of<br />

meeting the design<br />

guideline.<br />

-2 points: If the project<br />

substantially fails to<br />

follow the design<br />

guideline.<br />

Note: Some design elements may<br />

be considered more critical than<br />

others and weighted accordingly, by<br />

using a multiplier valued from 1 to 3<br />

points.<br />

The <strong>Design</strong> Review Committee<br />

should determine in advance of<br />

project review which elements are<br />

to be weighted as well as the value<br />

of the multiplier(s) to be used.<br />

Adopted June 7, 2011 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!