Pavement Management Proactive vs. Reactive • Proactive Plan: maintains roads before damage is done to preserve the quality of the . road. . • Reactive Plan: Roads are fixed or maintained after damage has occurred. . 14
. time Maintenance Plan Selection 1. Possible Treatment Strategies 2. Cost vs. Benefit 3. Treatment Type 4. Annual Maintenance Program over a multi-year frame 15
- Page 1 and 2: Spanish Fork City Pavement Manageme
- Page 3 and 4: The key to maximizing pavement life
- Page 5 and 6: Crack Seal The crack sealing materi
- Page 7 and 8: . the . pooling. Slurry Seal Slurry
- Page 9 and 10: Chip Seal continued 11
- Page 11: Asphalt Overlay Asphalt Overlay Pri
- Page 15 and 16: Maintenance Goals 36 years of aspha
- Page 17 and 18: Streets Progress Report 2009 - 2010
- Page 24 and 25: Completed Maintenance Type Sq Ft %
- Page 26: Anticipated 2011 Maintenance Type S
Pavement Management<br />
Proactive vs. Reactive<br />
• Proactive Plan: maintains roads before damage is<br />
done to preserve the quality of the<br />
.<br />
road.<br />
.<br />
• Reactive Plan: Roads are fixed or maintained after<br />
damage has occurred.<br />
.<br />
14