E N V I R O N M E N T A L M A T T E R S<br />

This year saw a significant progress in our environmental efforts at the<br />

port, as we worked towards ISO 14001 Environmental Management<br />

accreditation. The international standard is considered to be the most<br />

stringent of all the accreditation systems available in New Zealand<br />

for environmental management, and <strong>Port</strong> <strong>Nelson</strong> is the first major<br />

New Zealand port to make the commitment to externally audited<br />

continuous improvement in environmental management. Our first full<br />

audit was held at the end of the financial year and the final certification<br />

was issued some weeks later.<br />

Reaching this point has meant having a long hard look at our existing<br />

environmental management plan against the framework prescribed<br />

by the standard. The Environmental Consultative Committee has<br />

guided the process, advising on priority of environmental impacts and<br />

contributing several of the new quantitative performance indicators.<br />

As in previous years we extend a grateful thanks to this dedicated and<br />

knowledgeable team of volunteers.<br />

Auditors will continue to visit us on a regular basis to ensure we are<br />

gathering information related to the meeting of our targets and<br />

checking that procedures are working as described by the system.<br />

I S O A C T I V I T I E S T H R O U G H T H E Y E A R<br />

Environmental Policy Statement updated . . . . . . . . . . . . . . . . . . July 2006<br />

Environmental Aspects Register and<br />

scoring developed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .August 2006<br />

Internal environmental team convened. . . . . . . . . . . . . .September 2006<br />

Staff training in auditing environmental<br />

management systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .October 2006<br />

Initial audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . November 2006<br />

Baselines and performance targets reviewed . . . . . . . . . . February <strong>2007</strong><br />

Plastics, paper and cardboard recycling introduced . . . . . .March <strong>2007</strong><br />

Review of documents and record keeping . . . . . . . . . . . . . . . . April <strong>2007</strong><br />

First full audit, update of Environmental Management Plan . . June <strong>2007</strong><br />

I N D I C A T O R S O F P R O G R E S S<br />

Our performance indicators are provided in both actual units and<br />

in TEU (twenty foot container equivalent) to provide a measure of<br />

efficiency improvements.<br />

E N V I R O N M E N T A L M A N A G E M E N T P E R F O R M A N C E I N D I C A T O R S<br />

Aspect Indicator Baseline Baseline<br />

2005/6 2006/7<br />

Environmental Policy Percentage of new permanent employees receiving environmental induction 0 23%<br />

Fuel Fuel use (litres) per teu* of cargo handled. 8.34 (537,926 ) 8.08 (580,905)<br />

Power Electricity use (kw hours)/per teu of cargo handled 65.7 (4,234,445) 63.89 (4,591,509)<br />

Waste Waste generated per FTE **employee (m 3 ) 2.8 (397.5) 2.75 (363)<br />

Methyl Bromide<br />

Number of readings higher than the current OSH workplace standard<br />

(19/mg/m 3 ) in areas not cordoned off during fumigation or venting. 0 0<br />

Quantity of Methyl Bromide used at <strong>Port</strong> <strong>Nelson</strong> (tonnes) 2.491 2.286<br />

Noise Number of noise complaints 33 32<br />

Oil Spills Number of oil spills when bunkering 1 3<br />

Dust Number of dust complaints 8 9<br />

Codes of Practice Number of audit reports completed 7 13<br />

Number of non-conformances identified 6 7<br />

Number of non conformances resolved 5 6<br />

Continuous Improvement Number of targets reported on 4 15<br />

Number of new initiatives Not recorded 19<br />

Water Water use (m 3 )per teu (site use excl ships) 0.61 (39,478) 0.64*** (46,437)<br />

1 0<br />

* Twenty foot equivalent unit for 2005/6 = 64,455 for <strong>2007</strong>/7 = 71,865<br />

** Full time equivalent employees 2006/7 132<br />

*** Increase due to water leak.