The goods should properly fit in/on/to the machines for which the same are intended.<br />

8. INSPECTION CLAUSE:<br />

PREDESPATCH INSPECTION Stage/Pre-dispatch inspection will be carried out by M/s. CMPDIL/<strong>CCL</strong>’S<br />

NOMINATED AGENCY as per their methodology. In brief the scope and conditions of the Inspection will be as follows:<br />

-<br />

a) Checking and approval of test procedures/quality assurance plans.<br />

b) Verification of records and documentation of vendor works inspection.<br />

c) Verification of documents and test certificate of bought out items and cross checks.<br />

d) Provide the facilities for carrying out all tests as required in specifications of vendors works else these will be<br />

carried out at independent test house if considered so necessary by CMPDIL/<strong>CCL</strong>’S NOMINATED AGENCY<br />

at vendors cost.<br />

e) Final testing and checking as per specifications.<br />

f) CMPDIL/<strong>CCL</strong>’S NOMINATED AGENCY will have full and free access to the place of the supplier /<br />

manufacturer during process of manufacturing and during inspection activities.<br />

g) Inspection fee @ 0.80% of the FOR Destination price plus Service Tax as applicable is to be paid to<br />

CMPDIL/<strong>CCL</strong>’S NOMINATED AGENCY in advance by demand draft along with inspection call letter, which<br />

will be reimbursed by <strong>CCL</strong> along with consignment billing.<br />

h) Pre-Dispatch inspection by CMPDIL/<strong>CCL</strong>’S NOMINATED AGENCY shall be applicable, except in case of<br />

supplies by OEM’s and direct import by <strong>CCL</strong>.<br />

i) Minimum 15 days clear notice shall be given by the manufacturer/suppliers to CMPDIL/<strong>CCL</strong>’S NOMINATED<br />

AGENCY for arranging inspection within valid delivery period as per contract.<br />

j) In the event of rejection / non-readiness of materials during the first visit of inspector/s of CMPDIL/<strong>CCL</strong>’S<br />

NOMINATED AGENCY, the manufacturers/suppliers shall pay to CMPDIL/<strong>CCL</strong>’S NOMINATED AGENCY all<br />

charges including actual travel and hotel expenses along with inspection fee for the second visit<br />

k)<br />

FINAL INSPECTION: Final Inspection of the consignment shall be carried out at the destination stores, which will<br />

be arranged by the consignee on receipt of stores.<br />

9. PROVENNESS CRITERIA: The tenderer should be a proven source. The criteria for provenness will be as follows:<br />

(i)<br />

(ii)<br />

Original Equipment Manufacturer (OEM) or<br />

Manufacturers whose products are used by OEM or<br />

(iii) Manufacturers whose products are already in use successfully at CIL or CIL Subsidiaries or PSU or Government / Semi Government<br />

organizations.<br />

Tenderers falling under (ii) shall have to furnish relevant documentary proof like Trade Agreement with OEM for the<br />

tendered item or Purchase order copy from OEM.<br />

Tenderers falling under (iii) shall have to furnish relevant documentary poof like copies of Rate contract or firm order for<br />

the tendered items or similar items of HIGHER SPECIFICATIONS.<br />

<br />

<br />

<br />

<br />

The copies of Rate Contract or Firm Order shall not be less than 25% of the tendered quantity in<br />

respect of each offered item of the bid issued by CIL or subsidiary HQ of CIL/Government/Semi<br />

Government Organisation for confirming their provenness .<br />

The order copies shall not be less than 06(SIX) months old or more than 07(Seven) years old uniformly<br />

for all tenderer on the date of opening of tender.<br />

In case the tenderer submit order copy/copies of similar item of higher specification then the tenderer<br />

shall have to submit copy/copies of Rate Contract or Firm Order to the extent of minimum 25% of the<br />

total tendered quantity ( covering all tendered items) of the bid.<br />

The tenderer shall have to submit an undertaking under affidavit that “ The items covered under supply<br />

order, enclosed with their offer, have been successfully executed”.<br />

However, Tenderers who are Ancillary Unit of <strong>CCL</strong> falling under (iii) shall have to furnish relevant documentary proof<br />

for successfully executed & accepted <strong>CCL</strong>’s Trial Order or Firm Order for their Ancillarised items for consideration of<br />

Eligibility Criteria.