Central Coalfields Limited - CCL
Central Coalfields Limited - CCL
Central Coalfields Limited - CCL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
We are about to finalize the procurement of Squirrel Cage Induction Motors for which we<br />
require the Last Purchase Price of the following items:-<br />
Sl.No<br />
.<br />
DESCRIPTION OF ITEMS<br />
Qnty<br />
1 Induction Motors, 6.3 KW 02<br />
2 Induction Motors, 15 KW 06<br />
3 Induction Motors, 18.5 KW 04<br />
4 Induction Motors, 66 KW 01<br />
5 Induction Motors, 76 KW 01<br />
6 Induction Motors, 90 KW 01<br />
7 Induction Motors, 132 KW 02<br />
You are requested to kindly arrange to provide the order copies placed by you for the same<br />
at the earliest to enable us to finalize the case.<br />
Thanking you,<br />
Yours faithfully,<br />
[N.K.Dutta]<br />
Chief Manager(P)<br />
<strong>Central</strong> <strong>Coalfields</strong> <strong>Limited</strong><br />
(A Subsidiary of Coal India <strong>Limited</strong>)<br />
Materials Management Department<br />
Darbhanga house, P.O.: Ranchi – 834 001 (Jharkhand), (India)<br />
Ph: (PBX) 2361687/ 2361694 GM (MM) 2360716/2360257<br />
Fax (91) (0651) 2360198<br />
Website: www.ccl.gov.in<br />
Ref: Sr. Mgr(P)/326/10-11/Squirrel Cage Induction Motor/<br />
Dated:16.11.2011<br />
To,<br />
The General Manager (MM),