CIRCULAR<br />

No.<strong>CCL</strong>/CGM(CMC)/Circular/CTE/2008/910<br />

Date:05/08.08.08<br />

Listed below are some of the points as observed by the Chief Technical Examiner of CVC<br />

during intensive examination of one of the contract related to transportation of coal of <strong>CCL</strong>:<br />

1) Original contract agreement was found kept in a loose folder. It was not bound and<br />

not kept under sealed cover. Also every page including pages detached NIT & GTC<br />

was not signed by the concerned agreement signing authority. It is, therefore advised<br />

that the original agreement duly signed must be kept sealed to prevent tampering.<br />

2) Team observed that copy of the LOI/Letter of Award, copy of NIT and copy of<br />

original schedule of rate on which the contractor had quoted their final rate were not<br />

formed part of the agreement. As such copy of these documents must be made part of<br />

the contract agreement.<br />

3) Serial numbering of the pages of the contract agreement must be done.<br />

4) Hindrance Register:- Proper Hindrance register must be maintained. In it, date &<br />

time of occurrence and removal of a particular hindrance affecting the work must be<br />

recorded. This is required for correct assessment of demurrage amount on account of<br />

contractor’s fault.<br />

5) Safety measures must be observed at work site strictly. No Contractors employees<br />

should be allowed working at site without dust mask, safety shoes and safety helmets.<br />

Proper safety signs etc must be displayed at the site of work.<br />

6) In the R/A bills paid to the contractors, it is found that the rates for payments have<br />

been adopted by adding the agreement rate plus escalation. This system is not in<br />

order. All the running payments should be made @ agreement rate. Escalation bill<br />

should be paid separately. From the paid bills it should be clear, what is the amount<br />

paid against the work done and the amount of escalation paid under the contract.<br />

7) As per contract, vocational training under rule 1966 is being agreed by <strong>CCL</strong> for all the<br />

contractors’ workers from time to time. Appropriate recoveries for organizing the<br />

training program by <strong>CCL</strong> must be made from the contractor.<br />

In view of above, all concerned are advised to take further corrective/preventive steps and<br />

ensure the compliance of the observations with respect to transportation/outsourcing<br />

contracts under their jurisdiction.<br />

CC :<br />

This issues with the approval of competent authority.<br />

(1) Director Technical (Operation), <strong>CCL</strong><br />

(2) CVO, <strong>CCL</strong><br />

(3) GM(Finance)d, <strong>CCL</strong>, Ranchi<br />

(4) CGM/General Manager, All Areas of <strong>CCL</strong><br />

(5) Area Finance Managers, All areas of <strong>CCL</strong>.<br />

(6) Staff Officer (Mining), All Areas of <strong>CCL</strong>.<br />

Sd/-<br />

CGM (CMC),<br />

<strong>CCL</strong>, Ranchi