CIRCULAR<br />
No.<strong>CCL</strong>/CGM(CMC)/Circular/CTE/2008/910<br />
Date:05/08.08.08<br />
Listed below are some of the points as observed by the Chief Technical Examiner of CVC<br />
during intensive examination of one of the contract related to transportation of coal of <strong>CCL</strong>:<br />
1) Original contract agreement was found kept in a loose folder. It was not bound and<br />
not kept under sealed cover. Also every page including pages detached NIT & GTC<br />
was not signed by the concerned agreement signing authority. It is, therefore advised<br />
that the original agreement duly signed must be kept sealed to prevent tampering.<br />
2) Team observed that copy of the LOI/Letter of Award, copy of NIT and copy of<br />
original schedule of rate on which the contractor had quoted their final rate were not<br />
formed part of the agreement. As such copy of these documents must be made part of<br />
the contract agreement.<br />
3) Serial numbering of the pages of the contract agreement must be done.<br />
4) Hindrance Register:- Proper Hindrance register must be maintained. In it, date &<br />
time of occurrence and removal of a particular hindrance affecting the work must be<br />
recorded. This is required for correct assessment of demurrage amount on account of<br />
contractor’s fault.<br />
5) Safety measures must be observed at work site strictly. No Contractors employees<br />
should be allowed working at site without dust mask, safety shoes and safety helmets.<br />
Proper safety signs etc must be displayed at the site of work.<br />
6) In the R/A bills paid to the contractors, it is found that the rates for payments have<br />
been adopted by adding the agreement rate plus escalation. This system is not in<br />
order. All the running payments should be made @ agreement rate. Escalation bill<br />
should be paid separately. From the paid bills it should be clear, what is the amount<br />
paid against the work done and the amount of escalation paid under the contract.<br />
7) As per contract, vocational training under rule 1966 is being agreed by <strong>CCL</strong> for all the<br />
contractors’ workers from time to time. Appropriate recoveries for organizing the<br />
training program by <strong>CCL</strong> must be made from the contractor.<br />
In view of above, all concerned are advised to take further corrective/preventive steps and<br />
ensure the compliance of the observations with respect to transportation/outsourcing<br />
contracts under their jurisdiction.<br />
CC :<br />
This issues with the approval of competent authority.<br />
(1) Director Technical (Operation), <strong>CCL</strong><br />
(2) CVO, <strong>CCL</strong><br />
(3) GM(Finance)d, <strong>CCL</strong>, Ranchi<br />
(4) CGM/General Manager, All Areas of <strong>CCL</strong><br />
(5) Area Finance Managers, All areas of <strong>CCL</strong>.<br />
(6) Staff Officer (Mining), All Areas of <strong>CCL</strong>.<br />
Sd/-<br />
CGM (CMC),<br />
<strong>CCL</strong>, Ranchi