Vigilance Compedium - CCL
Vigilance Compedium - CCL Vigilance Compedium - CCL
CENTRAL COALFIELDS LIMITED DARBHANGA HOUSE:RANCHI No.T/PP/Tender/05/246-64 Dated 04.05.2005 To All Area CGMs/GMs, Hazaribagh, CGM(MM)/GM(C)/ GM(S&M). Dear Sir, Sub: Open Tendering Process on Approved and Latest Scheduled Rates. It has been revealed that proposals for Civil/Purchase jobs are being bifurcated in such a way to avoid open tendering process. Moreover, the estimates are not being prepared as per the latest Schedule of Rates. Therefore, you have been directed to ensure that bifurcation of the work must not be done and estimates should be prepared only on the basis of approved and latest schedule rates of the company. Open Tendering is defined as a wide publicity, - Tendering should be done as per Purchase/Civil manual including publication in web sites. Hence, publicity is being made to give equal opportunity to all the persons interested in executing the work/supply of materials. Strict compliance of the process should be ensured. Yours faithfully, Sd/- (B.K. Sinha) Director Technical (P&P) Copy to: cc to: 1. CGM(Excv), CCL 2. CGM (Ws), CCL CMD Dir.Tech (Opns.)
CENTRAL COALFIELDS LIMITED DARBHANGA HOUSE:RANCHI No.CCL:D(T/O):07/Guideline/23/203 Date:09.02.07 Following should be observed in all the files: CIRCULAR 1. Name of the initiating Officer with designation, department, subject and date should be clearly mentioned on the first page of the note sheet. 2. File movement record on the back side of the file cover should be entered into at every stage of the file movement. Date From To Signature 3. All the pages should be numbered serially and no blank space should be left. If any side of the note sheet is left blank, it should be crossed. 4. Officials must put their name and designation legibly below the signature. 5. All noting should be in legible hand writing. If some one’s handwriting is not legible, the noting must be got typed. Scribbled not in a haste with illegible writing should be avoided. Sd/- (A.K. Singh) Director(Tech/Opns) Distribution: 1) All CGMs/GMs of the Area 2) All HODs of CCL HQ
- Page 43 and 44: No.98/ORD/1 Government of India Cen
- Page 45 and 46: No.06-03-02-CTE-34 Government of In
- Page 47 and 48: No.98/ORD/1 Central Vigilance Commi
- Page 49 and 50: No.OFF-1-CTE-1 Government of India
- Page 51 and 52: No.98/ORD/1 Government of India Cen
- Page 53 and 54: Subject: Consideration of Indian Ag
- Page 55 and 56: No.98/ORD/1 CENTRAL VIGILANCE COMMI
- Page 57 and 58: supplier/contractor will lead to pr
- Page 59 and 60: No.004/ORD/9 Government of India Ce
- Page 61 and 62: subsequently providing goods or wor
- Page 63 and 64: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Te
- Page 65 and 66: No.OFF-1-CTE-1(Pt) V Government of
- Page 67 and 68: No.005/MSC/25 Government of India C
- Page 69 and 70: No.005/VGL/66 Government of India C
- Page 71 and 72: (iv) (v) As regards the splitting o
- Page 73 and 74: No.005/CRD/19 Government of India C
- Page 75 and 76: No.004/VGL/90 Government of India C
- Page 77 and 78: No.005/VGL/4 Government of India Ce
- Page 79 and 80: No.005/CRD/012 Government of India
- Page 81 and 82: Annexure-1 Check list for examinati
- Page 83 and 84: No.005/CRD/19 Government of India C
- Page 85 and 86: No.02-07-01-CTE-30 Government of In
- Page 87 and 88: No.007/VGL/033 Government of India
- Page 89 and 90: and approval by the Commission as I
- Page 91 and 92: INTERNAL CIRCULARS/ GUIDELINES OF C
- Page 93: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 97 and 98: INTERNAL CIRCULARS/ GUIDELINES OF C
- Page 99 and 100: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 101 and 102: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 103 and 104: Encl: as above. Copy to: 1. DT(O),C
- Page 105 and 106: Coal India Limited VIGILANCE DIVISI
- Page 107 and 108: WIRELESS DT: 01.7.2002 FOR : SO(E&M
- Page 109 and 110: PROCEDURE TO BE ADOPTED FOR REPAIR
- Page 111 and 112: 1. Name of the Project/Colliery 2.
- Page 113 and 114: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 115 and 116: e) The fund for repairing shall be
- Page 117 and 118: 7. At the opening and close of the
- Page 119 and 120: Annexure-I HSD Issue statement with
- Page 121 and 122: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 123 and 124: INTERNAL CIRCULARS/ GUIDELINES OF F
- Page 125 and 126: INTERNAL CIRCULARS/ GUIDELINES OF M
- Page 127 and 128: Government of India Ministry of Coa
- Page 129 and 130: INTERNAL CIRCULARS/ GUIDELINES OF P
- Page 131 and 132: from SC/ST, the roster points to be
- Page 133 and 134: Government of India Ministry of Coa
- Page 135 and 136: CENTRAL COALFIELDS LIMITED DARBHANG
- Page 137 and 138: CENTRAL COALFIELDS LIMITED A Minira
- Page 139 and 140: INTERNAL CIRCULARS/ GUIDELINES OF S
- Page 141 and 142: Proposal seeking approval of draft
- Page 143 and 144: In line with the above, based on th
CENTRAL COALFIELDS LIMITED<br />
DARBHANGA HOUSE:RANCHI<br />
No.<strong>CCL</strong>:D(T/O):07/Guideline/23/203<br />
Date:09.02.07<br />
Following should be observed in all the files:<br />
CIRCULAR<br />
1. Name of the initiating Officer with designation, department, subject and date should<br />
be clearly mentioned on the first page of the note sheet.<br />
2. File movement record on the back side of the file cover should be entered into at<br />
every stage of the file movement.<br />
Date From To Signature<br />
3. All the pages should be numbered serially and no blank space should be left. If any<br />
side of the note sheet is left blank, it should be crossed.<br />
4. Officials must put their name and designation legibly below the signature.<br />
5. All noting should be in legible hand writing. If some one’s handwriting is not legible,<br />
the noting must be got typed. Scribbled not in a haste with illegible writing should be<br />
avoided.<br />
Sd/-<br />
(A.K. Singh)<br />
Director(Tech/Opns)<br />
Distribution:<br />
1) All CGMs/GMs of the Area<br />
2) All HODs of <strong>CCL</strong> HQ