- Page 1 and 2: CONTENTS Sl.no. Contents Page no. A
- Page 3: standard specifications) 37. Circul
- Page 7 and 8: e-Procurement / Reverse auction e-P
- Page 9 and 10: No.98/ORD/1 Government of India Cen
- Page 11 and 12: No.4CC-1-CTE-2 Government of India
- Page 13 and 14: Leveraging Technology - e-payments
- Page 15 and 16: Total amount involved : 4. Out of t
- Page 17 and 18: Guidelines on Security consideratio
- Page 19 and 20: 2.3.3 Security in Data storage and
- Page 21 and 22: No.4CC-1-CTE-2 Government of India
- Page 23 and 24: NIT / Tendering / Negotiations / Pu
- Page 25 and 26: No.98/ORD/1 Government of India Cen
- Page 27 and 28: iii) The Comptroller & Auditor Gene
- Page 29 and 30: fair manner. The authority may in s
- Page 31 and 32: No.001/VGL/21 Government of India C
- Page 33 and 34: N. Vittal 98/ORD/1 GOVERNMENT OF IN
- Page 35 and 36: No.12-02-1-CTE-6 Central Vigilance
- Page 37 and 38: establishment, plant, equipment etc
- Page 39 and 40: No.98/ORD/1(Pt.IV) Government of In
- Page 41 and 42: No.98/ORD/1 Government of India Cen
- Page 43 and 44: No.98/ORD/1 Government of India Cen
- Page 45 and 46: No.06-03-02-CTE-34 Government of In
- Page 47 and 48: No.98/ORD/1 Central Vigilance Commi
- Page 49 and 50: No.OFF-1-CTE-1 Government of India
- Page 51 and 52: No.98/ORD/1 Government of India Cen
- Page 53 and 54: Subject: Consideration of Indian Ag
- Page 55 and 56:
No.98/ORD/1 CENTRAL VIGILANCE COMMI
- Page 57 and 58:
supplier/contractor will lead to pr
- Page 59 and 60:
No.004/ORD/9 Government of India Ce
- Page 61 and 62:
subsequently providing goods or wor
- Page 63 and 64:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 Te
- Page 65 and 66:
No.OFF-1-CTE-1(Pt) V Government of
- Page 67 and 68:
No.005/MSC/25 Government of India C
- Page 69 and 70:
No.005/VGL/66 Government of India C
- Page 71 and 72:
(iv) (v) As regards the splitting o
- Page 73 and 74:
No.005/CRD/19 Government of India C
- Page 75 and 76:
No.004/VGL/90 Government of India C
- Page 77 and 78:
No.005/VGL/4 Government of India Ce
- Page 79 and 80:
No.005/CRD/012 Government of India
- Page 81 and 82:
Annexure-1 Check list for examinati
- Page 83 and 84:
No.005/CRD/19 Government of India C
- Page 85 and 86:
No.02-07-01-CTE-30 Government of In
- Page 87 and 88:
No.007/VGL/033 Government of India
- Page 89 and 90:
and approval by the Commission as I
- Page 91 and 92:
INTERNAL CIRCULARS/ GUIDELINES OF C
- Page 93 and 94:
CENTRAL COALFIELDS LIMITED DARBHANG
- Page 95 and 96:
CENTRAL COALFIELDS LIMITED DARBHANG
- Page 97 and 98:
INTERNAL CIRCULARS/ GUIDELINES OF C
- Page 99 and 100:
CENTRAL COALFIELDS LIMITED DARBHANG
- Page 101 and 102:
CENTRAL COALFIELDS LIMITED DARBHANG
- Page 103 and 104:
Encl: as above. Copy to: 1. DT(O),C
- Page 105 and 106:
Coal India Limited VIGILANCE DIVISI
- Page 107 and 108:
WIRELESS DT: 01.7.2002 FOR : SO(E&M
- Page 109 and 110:
PROCEDURE TO BE ADOPTED FOR REPAIR
- Page 111 and 112:
1. Name of the Project/Colliery 2.
- Page 113 and 114:
CENTRAL COALFIELDS LIMITED DARBHANG
- Page 115 and 116:
e) The fund for repairing shall be
- Page 117 and 118:
7. At the opening and close of the
- Page 119 and 120:
Annexure-I HSD Issue statement with
- Page 121 and 122:
CENTRAL COALFIELDS LIMITED DARBHANG
- Page 123 and 124:
INTERNAL CIRCULARS/ GUIDELINES OF F
- Page 125 and 126:
INTERNAL CIRCULARS/ GUIDELINES OF M
- Page 127 and 128:
Government of India Ministry of Coa
- Page 129 and 130:
INTERNAL CIRCULARS/ GUIDELINES OF P
- Page 131 and 132:
from SC/ST, the roster points to be
- Page 133 and 134:
Government of India Ministry of Coa
- Page 135 and 136:
CENTRAL COALFIELDS LIMITED DARBHANG
- Page 137 and 138:
CENTRAL COALFIELDS LIMITED A Minira
- Page 139 and 140:
INTERNAL CIRCULARS/ GUIDELINES OF S
- Page 141 and 142:
Proposal seeking approval of draft
- Page 143 and 144:
In line with the above, based on th
- Page 145 and 146:
are extended on request of the cons
- Page 147 and 148:
(d)Sale orders received at the coll
- Page 149 and 150:
(o)The party wise/sale order wise
- Page 151 and 152:
h) CSC will send a list of un close
- Page 153 and 154:
Case Study -01 BRIEF OF ALLEGATION
- Page 155 and 156:
Case Study -02 BRIEF OF ALLEGATION
- Page 157 and 158:
2.2 Deficient work order, which was
- Page 159 and 160:
• Payment of contractually transp
- Page 161 and 162:
Case Study -05 Sub: Purchase of gum
- Page 163 and 164:
Case Study -06 Lapses in conduction
- Page 165 and 166:
Case Study -08 Lapses in processing
- Page 167:
Case Study -09 A complaint was rece