• Payment of contractually transported quantity is made on the basis of actual<br />
weighment and not as per the approximately derived weight.<br />
2.2 Not measuring the excavated section of manual mine separately.<br />
a. It was seen from the available records that no separate monthly measurement of<br />
manually excavated section of the said was conducted. Although not mandatory, but<br />
the exclusive measurement of manually excavated section should have been<br />
conducted to cross-check the volume of manually loaded coal reported during the<br />
month.<br />
b. In view of the above it was recommended that:<br />
• A separate section should exclusively be developed in the quarry for manual loading.<br />
• Manually loaded trips should be cross checked at the end of the month by measuring<br />
the volume of coal excavated from the manual section.<br />
2.3 Same contractor for transporting coal from manual and CPL section<br />
a. The works of contractual transportation of coal from both manual and contractual Pay<br />
loader Section (CPL Section) have been awarded to same contractor. As the exit route<br />
from both sections are same, chances of booking mechanically loaded truck as manually<br />
loaded by the Manual Pit Munshi in connivance with contractual Munshi can not be<br />
ruled out because once the trucks get out of their sections it was very difficult for mid<br />
check point or CISF check post to distinguish between manually loaded trucks and<br />
mechanically loaded trucks.<br />
b. In view of the above it was recommended that:<br />
• The above said two transport contractors should be awarded to two different<br />
contractors.<br />
• Pool of contractual trucks for the two sections should be different and trucks from one<br />
section should not be allowed to move into the other section.<br />
CISF personnel should be deputed at the exit point of manual section itself so as to identify and record<br />
only manually loaded trips in the record book.<br />
2.4 Manual loading of coal: A loss making option of Mining at the said OCP<br />
• Viability of continuing the system of manual loading of coal at the said OCP had been<br />
assessed by the finance department of the project. The finance department of the project<br />
had concluded that company would have saved substantial amount of money during the<br />
above referred period if the manually loaded quantity of coal was loaded by contractual<br />
payloaders. Apart from the reduction in expenditure, non-deployment of about 300<br />
persons in congested mine workings would have enhanced the safety status of mine<br />
also.<br />
a. In view of the above, it was suggested that:<br />
• If possible, it was better to give fall back wages to loaders, than to deploy them on<br />
Manual loading of coal.